Not exact matches
Leva creates visibility into outsourced
BOMs and «
costed rollups» from manufacturing partners.
If you research into the
cost of manufacturing, you will find that Isuppli has taken the TouchPad apart and discovered that its
BOM is about the same as that of the iPad 2.
«With the displays already
costing US$ 300, if the machine has an Intel Core i7 series processor and chipset, another US$ 230 will be added to the
cost, and with other component
costs — motherboard about US$ 50 - 60; 6 - cell battery about US$ 40; solid state drive (SSD) about US$ 110; chassis and internal parts about US$ 80; and Windows 8 about US$ 90, the total
BOM is estimated to reach about US$ 900 excluding e shipments, retail channel distribution and marketing,» revealed sources to Digitimes.
The
BOM (bill of materials) shows that the components in a 16 GB iPad mini with Wi - Fi
costs Apple at least $ 188 in
costs.
This is the most expensive component on the Kindle - which
costs $ 84 on the whole (
BOM and assembly).
# 131 Jim: «Anne van der
Bom, you provided a forthright analysis of the
cost of wind power so I do not have to look further.
Anne van der
Bom, you provided a forthright analysis of the
cost of wind power so I do not have to look further.
OLED displays tend to be the most costly components on smartphones, and Chinese analyst firm, ichunt (which gave the lower
BOM figure), projects iPhone X OLED panels
cost approximately $ 80, while the device's stainless steel frame
costs $ 53 and its 256 GB flash memory modules
cost $ 45.
«After tearing down two more pairs of Beats Solo HDs that we purchased from Amazon and Target, I determined that the differences between the genuine and fake Beats only created an estimated change in bill of materials (
BOM)
cost of $ 3.29 — increasing from $ 16.89 to $ 20.18.»
There are many tasks that project management can cover such as: planning, scheduling, co-ordinating, EVM (earned value management), risk management, budget /
cost control,
BOM (bill of materials), WBS (work breakdown structure), engineering / technical input, mentoring / man management and more.
Cost analysis and
BOM development of both components and supporting manufacturing equipment
BOM Management and
Cost Reduction, program Interface and Presentation to Executives.
• Maintain product
costing and analyze its financial impact on the income and balance sheet • Perform
cost benefit analysis to ensure accurate product
costing • Prepare financial statements and analytical reports as per product
BOMs and COGS inventory
Tags for this Online Resume: engineering bill of material, document control specialist,
BOM and ECO management, PCB Assemblies, Electronic components procurement, Product Configuration Specialist, Pricing Research and Analysis,
Cost Estimation and Reduction
SUMMARY Results - driven Manager with extensive experience in manufacturing, warehousing, inventory control, manufacturing
cost accounting and production control / planning (MRP / MPS, KANBAN, JIT, Routings,
BOM's etc.) Extensive knowledge in the use and implementation of computer systems and software (Synchrono, Adonix, TakeStock, AS400, JBA, RF Bar Code Scanners, SAP, Excel, Word, Query and Lotus Suite, etc.) Analyze and docume...
* Acquired knowledge of SolidWorks, Pro / E, CATIA, ANSYS, AutoCAD, Minitab, JIT,
cost estimation, engineering drawings, Bill of Materials (
BOM), design review, Design of Experiments (DOE), automobile and aerospace engineering, powertrain systems and design, vehicle dynamics, thermal engineering, 3D printin...
Tags for this Online Resume: Contract Negotiations, Capture Team Lead CTL), Earned Value Management (EVM), Intergrated Program Team (IPT), Supplier Relationship Building, Program Status Presentations, Program Risk Management, Strategic Marketing, Foreign and US Customers, Business Development, Maintain Program
Cost (CPI), Maintain Program Schedule (SPI), Original Equipment Manufacturers OEM customers, Proposal Management, Develop and Maintain Bill Of Materials (
BOM), Prepare Statement of Work (SOW), maintain Integrated Master Schedule (IMS), Establish Milestones, oversee Make vs. Buy, MS Office and Project