Building improvements include measures like new lighting fixtures and controls, heating, ventilating and air - conditioning systems, electric motors, and automated energy management systems.
Not exact matches
These
include: real estate purchases and
improvements,
including existing
buildings, grading, street
improvements, parking lots and landscaping, and utilities; long - term machinery and equipment; renovation of existing facilities; and
building construction.
Fixed assets are for long - term use and
include land,
buildings, leasehold
improvements, equipment, machinery and vehicles.
But many of those self -
improvement habits also
included keeping fit and healthy and little secrets they deployed to
build relationships with other rich, successful people.
If they originally
build in some «ethical» loops, there will be controls, as well as capacity for
improvement / learning, and also the instantaneous self - evolving feature will
include a «port» which will connect via a network to all the others, thus producing an «equality» of sorts, and an appreciation / empathy for the «plight» of the rest, because all the lessons they all learned in the last 6 hours, (or whatever the download separation is) will be downloaded and become common to all, immediately.
They are all
build 100 % with church funds,
including any road
improvements.
While «home
improvement» often refers to
building projects that alter the structure of an existing home, it can also
include improvements to lawns, gardens, and outdoor structures, such as gazebos and garages.
These
improvements include adding 20,000 square feet of refrigeration space and additions to the
building's truck receiving area.
He has also initiated several eco-conscious
improvements to the
buildings and farm equipment,
including over 50Kw of solar panels that provide much of the farm's electricity; the conversion of cooking oil into biodiesel to power the tractors and other vehicles; and a rainwater capture system that feeds a pond, which provides irrigation for the apple orchard and other landscaping.
The Ridgeland Common Dog Park Plus, a field open on weekends for dogs at 415 Lake St., will close permanently Aug. 4 as part of a $ 22.8 million renovation at the facility, which also
includes building an expanded indoor ice rink and
improvements to the swimming pool.
Golden Oaks Park — located alongside Sullivan Road on Golden Oaks Parkway — is set to receive a series of
improvements that
include a newly -
built picnic shelter, replacement of the current playground with agespecific equipment and play areas, a baseball backstop, a refurbished half - court basketball area and hoop and an adult fitness area.
Voters approved an $ 89 million bond issue for Moraine Valley Community College in Palos Hills for capital
improvements,
including a new science
building and an instructional and job training center.
The transformative renovation will
include improvements to the indoor court
building, storm water management and will bring an additional 2,256 square - feet multi-purpose room to the north side of the club.
According to a 2013 appraisal of the
building, the club would need about $ 500,000 in maintenance
improvements, projects that
include replacement of the heating and air conditioning system as well as some of the pool's equipment.
If you are renovating, Our Green House even has eco-friendly green
building and home
improvement supplies,
including safe paints and sealants.
By 2012 it had
built a team of four chefs providing field support,
including recipe development and testing, menu planning,
improvement of food safety and sanitation practices, and ongoing instruction of institutional production methods.
More than 100 volunteers have served on nine committees to gather information on proposed
improvements to district parks and their facilities,
including building natural and local history exhibits at Peck Farm;
building athletic fields and environmental study areas; constructing a new swimming pool; repairing the retaining wall around Island Park on the Fox River; renovating old playgrounds and
building new ones; restoring tennis courts and
building new ones; and expanding the community center.
A workforce development organization that provides training to New York City Housing Authority residents is urging Gov. Andrew Cuomo and the top leaders in the Assembly and Senate to
include a design -
build provision for
improvements, but asked that they not
include a project - labor agreement in a final deal.
The project
includes the new construction of six
buildings and the rehabilitation of two historic
buildings in Elmira's Business
Improvement District on South Main Street.
The governor also touted some of the $ 120 million in
improvements the state has made at the fairgrounds,
including building a new recreational vehicle park and the Broadway Skyliner, a 1,400 - foot - long chairlift ride nearly 35 feet in the air that takes riders from one end of the Midway to the other.
Improvements include the installation, replacement or repair of heating, plumbing, electrical and related systems and elimination of hazardous
building violations.
But Governor Cuomo's office is pushing back, saying all the hoopla over the leaked proposal is much ado about nothing, adding its existing plan to
build a new train station across the street from Penn, in the old Farley Post Office
building must also
include improvements at Penn..
Phase II
improvements at the park
include a new parking area with landscaping and clearly marked areas for boat parking and handicapped parking; a new railing along the water's edge that allows an open view of the Niagara River and replaces a rusted steel wall that had previously blocked the view; a new concrete promenade along the water, formed to resemble wood planking and accompanied by grassy areas with trees; a new, lighted flagpole at the park's K - 9 monument; and a new Parks Department maintenance
building.
Other budget recommendations
include $ 6 million for city - wide infrastructure reconstruction, $ 2.5 million for the demolition of city
buildings and structures, $ 802,500 to improve the Genesee Gateway, more than $ 1 million for
improvements near the Buffalo Niagara Medical Campus, and $ 1.2 million for the Niagara Street Gateway project.
The 12 - story development in Albany,
built in 1974, is in need of major upgrades
including building - wide systems,
improvements to exterior and new kitchens and bathrooms.
Key Clinton County projects
include building improvements to the North Country Veterans Association, production line expansions at SSF Production, renovation work at the proposed Keeseville Waterfront Park and funds to modernize elevators at the Plattsburgh Housing Authority.
Jacobs said that
includes improvements to the Scajaquada Expressway, extending Metro Rail to the DL&W Terminal, redevelopment of the former Bethlehem Steel site, $ 10 million for Say Yes to Education, $ 20 million to expand class sizes at the University at Buffalo medical school and $ 20 million to
build a Visitor Welcome Center on Grand Island, among other capital projects.
Corcoran High School - $ 35.6 million - Replacement of HVAC systems and related work -
Includes library expansion / relocation, cafeteria
improvements, bathroom renovations, security
improvements, minor interior renovations - Students remain in
building during construction
S&P reaffirms the county's AA + bond rating as the county prepares to issue new bonds to fund various capital
improvement projects
including county
building repairs and renovations; Dutchess Community College infrastructure
improvements; and highway and bridge
improvements.
Henninger High School - $ 37.4 million - Partial renovations
include expanded cafeteria, enlarged library, new windows, reconfigured main entrance, gymnasium renovations, spaces for career technical education programs, support spaces, partial mechanical system replacement, bathroom renovations and security
improvements - Phased construction with students remaining in
building
It
includes $ 800,000 in capital
improvement projects at various county facilities, $ 575,000 for renovations to the Mental Health
Building, up to $ 1 million for road and highway reconstruction and
improvements, and up to $ 200,000 for repair or replacement of existing bridges.
During the meeting, Borough President Katz also noted the one year anniversary of the Jamaica NOW Action Plan's April 15, 2015 launch and outlined major milestones of the Jamaica NOW Action Plan in the past year,
including the activation of the Bronx - Flushing - Jamaica Q44 Select Bus Service that serves 44,000 New Yorkers daily; the newly - restored paths at Rufus King Park that are part of the first phase of the Park's major capital
improvements; redesigned storefronts of local businesses along Sutphin Boulevard (with more on the way); a $ 138,000 «Building Community Capacity» grant toward the formation of the Jamaica Arts Alliance; the release of an RFP to activate the 168th Street Garage into a new, mixed - use development, with the City to announce the winning bid shortly; the launch of the «Jamaica Avenue Streetscape Improvements» study to determine the cost and scope of additional seating, increased plantings and improved pedestrian circulation in the area; and free public Wi - Fi on track by July in the Downtown Jamaica Corridor, the first area in Queens to h
improvements; redesigned storefronts of local businesses along Sutphin Boulevard (with more on the way); a $ 138,000 «
Building Community Capacity» grant toward the formation of the Jamaica Arts Alliance; the release of an RFP to activate the 168th Street Garage into a new, mixed - use development, with the City to announce the winning bid shortly; the launch of the «Jamaica Avenue Streetscape
Improvements» study to determine the cost and scope of additional seating, increased plantings and improved pedestrian circulation in the area; and free public Wi - Fi on track by July in the Downtown Jamaica Corridor, the first area in Queens to h
Improvements» study to determine the cost and scope of additional seating, increased plantings and improved pedestrian circulation in the area; and free public Wi - Fi on track by July in the Downtown Jamaica Corridor, the first area in Queens to host LinkNYC.
To date, the initiative has invested $ 700 million in 176 parks and historic sites -
including installing 76 playgrounds, conserving 14,000 acres of buffer lands, rehabilitating 200 miles of trails, and beginning the
building or
improvement of 300 cabins and cottages and 30 nature and cultural centers.
While the bill will be sent to the Republican - led state senate for consideration, Heastie hailed the legislation as combating «ever - increasing rents» through measures that
include the repeal of vacancy decontrol and limiting rent increases associated with
building or apartment
improvements.
Suggested funding
includes $ 6.8 million for street and sidewalk
improvements throughout the city,
including the addition of more bicycle lanes, $ 1.5 million for property demolition, $ 1.3 million for new Sanitation and Parks equipment and millions more for
improvements to numerous city - owned
buildings.
The $ 22.8 million dollar plan
includes improvements to streets, sidewalks and
buildings while setting the wheels in motion for some all - new facilities.
To avoid costly problems in the future, ICA and other groups recommend a variety of policy
improvements,
including changing land use regulations in fire - and flood - prone areas, strengthening
building codes, and improving weather warning and modelling services.
Other recent and planned
improvements in neurological and neurosurgical services at NYU Lutheran
include building a new state - of - the - art neurointensive care unit; recruiting three neurointensivists,
including Dr. Frontera; and upgrading the neurointerventional radiology suite to provide the comprehensive team of neurointerventionalists the most state - of - the - art technology available.
The 43 percent court - ordered budget increase, from around $ 13 billion in operating expenditures to something approaching $ 19 billion (not
including some $ 9 billion over five years for
building improvements), is the largest school finance «adequacy» judgment ever awarded.
Successful Learners: School trips have the potential to lay strong foundations for encouraging successful learning and
building positive attitudes which subsequently lead to
improvements in achievement and motivation in all areas —
including academic.
In Kelly School, which is discussed in the book, these characteristics were
built through a set of interrelated organizational routines
including close monitoring of each student's academic progress, an explicit link between students» outcomes and teachers» practices, weekly 90 - minute professional development meetings focused on instructional
improvement, and the cultivation of a formal and informal discourse emphasizing high expectations, cultural responsiveness, and teachers» responsibility for student learning.
The school has developed
improvement measures,
including building solid community and business links and drawing in parents through «Inspire» afternoons.
Rashmi Watson says her school found that
including all staff in the
improvement model
built collective efficacy and a positive culture for everyone to thrive.
We found that
including all staff in an
improvement model
builds collective efficacy and a positive culture for all staff to thrive, and students to be the recipients of this positivity.
Importantly, it will tap into the strength of our faculty in early childhood,
including Professor Nonie Lesaux and Associate Professor Stephanie Jones, allowing us to
build a strong evidence base for preK program
improvement, policy, and advocacy.
for a school designated as
improvement / comprehensive, the plan shall, consistent with State law, also
include all of the actions set forth in section 6316 (b)(3)(A)(i - x) of the NCLB, 20 U.S.C. section 6316 (b)(3)(A)(i - x)(United States Code, 2006 Edition, Volume 13; Superintendent of Documents, U.S. Government Printing Office, Stop SSOP, Washington, DC 20402 - 0001; 2008; available at the Office of Counsel, State Education
Building, Room 148, Albany, NY 12234), in accordance with a written report by the school quality review team.
Strategies for
improvements across these indicators
include promoting community and family engagement, demystifying higher education access and procedures,
building mentoring and navigation supports throughout the higher education experience, and focusing on accountability for institutions in providing appropriate experiences and supports for young men of color.
Other leadership actions that nurture school turnarounds
include (1) sending a clear signal that dramatic change is urgently needed, (2) maintaining a consistent focus on improving instruction, (3) making visible
improvements quickly, and (4)
building a staff that is committed to the school's
improvement goals.
The Center
builds on work that began in the 1970's and has pursued methodological
improvements and new methods of analysis
including a software platform, CostOut, for estimating costs using the ingredients method.
The recommendations
include things like «
building state data repositories» and «creating reports using longitudinal statistics to guide systemwide
improvements.»