Upon Owner request, all ditching or trenching shall be done either
by trenching using the double ditching method of trench construction whereby up to eighteen (18) inches of the topsoil will be separated from the balance of the dirt removed in making the ditch or trench, so that any
caliche, other rock or shale will be separated from any topsoil so removed, or
by the plowing method.