After the air barrier is complete, but before the drywall is up, we will
conduct another blower door test to make sure that the building's airtightness is below the Passive House retrofit standard of 1 ACH50.
Not exact matches
The President's Sustainability projects included post-consumer composting in dining halls, occupancy sensors in vending machines, a solar tracker for research on the roof of the North Campus residence halls, and a
blower door for physics students to
conduct home energy audits.
With the help of Gary Nelson of the Energy Conservatory in Minneapolis, we were able to
conduct a first series of
blower door tests.
No
blower door test or sub-assembly air tightness tests were
conducted on the UCC test house.