Sentences with phrase «construction phase plan»

Key Issues A Construction Phase Plan is required on every construction project.
In particular, to ensure pre ‑ construction information is provided, the Construction Phase Plan is completed and the file presented at the end, if relevant.

Not exact matches

See conditions 57 to 59, which require Enbridge to conduct a pre-construction assessment of caribou habitat impacted by the project and conditions 51 and 191, which require Enbridge to prepare a construction phase and operations phase marine mammal protection plan.
An integrated platform provides clients with a single - source solution for every phase of occupying or owning a property: from strategic planning, site selection, design, construction and initial occupancy to ongoing cost - effective operations and dispositions.
This phase of the construction process helps determine what kind of building will be planned and built.
The projected $ 13.3 million cost for the construction phase of Wilmette's Lakefront Master Plan could jump by as much as $ 1.7 million, officials said.
Cleanup and construction work will begin by midsummer on the initial phase of the planned Elmwood Crossing redevelopment of the former Women & Children's Hospital site in Elmwood Village, now that the development team has received final city approval for the first building.
Also at 10:30 a.m., Monroe County Executive Cheryl Dinolfo will be joined by Seneca Park Zoo officials and representatives of local construction companies to break ground on the first phase of the zoo's master plan improvements, Lower Seneca Park, 2222 St. Paul St., Rochester.
Background: The City Department of Transportation is currently in the planning phase of a major rehabilitation of a 1.5 mile segment of the Brooklyn - Queens Expressway between Atlantic Avenue and Sands Street, and has warned that if construction is not finished by 2026 roughly 15,000 trucks will have to be redirected onto local streets each day.
The Erie County DSM provided all the necessary topographic survey, engineering design, drafting, easement acquisitions, permit and regulatory approvals, construction plans and specifications, as well as construction phase services / inspection for this project.
ERIE COUNTY, NY — The Erie County Department of Environment and Planning Division of Sewerage Management has announced that today is the official start of construction for Phase II of the Rush Creek Interceptor Project, which will involve the construction of sewers to collect wastewater from the Blasdell Wastewater Treatment Plant, three pumping stations, and three existing sewer overflows in the Blasdell area.
As part of its first phase of Second Avenue subway construction, the Metropolitan Transportation Authority is planning eight of these structures along a 34 - block stretch of the Upper East Side.
Table 1: Selection, Design & Construction of HSV - based Oncolytic Viruses Table 2: Selection, Design & Construction of Adenovirus - based Oncolytic Viruses Table 3: Selection, Design & Construction of Vaccinia Virus - based Oncolytic Viruses Table 4: Selection, Design & Construction of Vesicular Stomatitis Virus - based Oncolytic Viruses Table 5: Selection, Design & Construction of Newcastle Disease Virus - based Oncolytic Viruses Table 6: Selection, Design & Construction of Various Virus - based Oncolytic Viruses Table 7: Current Company - Sponsored Clinical Trials of T - Vec Table 8: Clinical Trials of ColoAd1 Table 9: Clinical Trials with JX - 594 Table 10: Clinical Trials with GL - ONC1 Table 11: Clinical Trials of CAVATAK (CVA21) Table 12: Clinical Trials with MV - NIS Table 13: Overview of Oncolytic Viruses by Development Phase & Virus Family Table 14: Profile of Approved and Marketed Oncolytic Viruses Table 15: Pivotal Study Design of Oncolytic Viruses in Late Stage Development Based on Previous Clinical Results Table 16: Approved Indications of Immune Checkpoint Inhibitors Table 17: Active Clinical Studies of Oncolytic Viruses in Combination with Immune Checkpoint Inhibitors (ICI) Table 18: Planned Clinical Studies of Oncolytic Viruses in Combination with Immune Checkpoint Inhibitors (ICI) Table 19: Active or Planned Clinical Studies of Oncolytic Viruses in Combination with Other Anti-Cancer Therapeutics Table 20: Pattern of Transgenes in Oncolytic Viruses in Relation to Development Phase Tables 21a and 21b: Indications and Frquency and Way of Administration of Oncolytic Viruses in Active and / or Positive Completed Clinical Studies Table 22: Small and Medium Pharma & Biotech as Partner for Regional Co-Development of Oncolytic Viruses Table 23: Immuno - Oncology Portfolio of Major Pharma & Biotech with Interest in Oncolytic Viruses Table 24: Interests of Major Pharma & Biotech in Oncolytic Viruses Table 25: First Generation Oncology Virus Companies and their Sources of Technology Table 26: Second Generation Oncology Virus Companies and their Sources of Technology Table 27: Third Generation Oncology Virus Companies and their Sources of Technology Table 28: Fourth Generation Oncology Virus Companies and their Sources of Technology Table 29: Grants, Credits & Donations Table 30: Financing by Venture Capital, Private Equity and Other Private Placements Table 31: Collaboration & Licensing Agreements Table 32: Companies Listed on Stock Exchange & Offerings Table 33: Mergers & Acquisitions
After an initial plan drafted in 2004 which laid the framework of a two - year phase (2005 - 2006) during which we conducted feasibility tests prior to the construction of the Institute, the second phase was prepared by a strategical plan elaborated in late 2006.
Schools included in the second phase of the programme can now begin developing plans for refurbishment, with completed construction expected to be around by September 2017.
As of January 2015, 16 schools from the first phase were open and operating, while 55 remained under construction, and the remaining schools fully involved in planning and development stages.
As of January this year, 16 schools from the first phase were open and operating, while 55 are under construction, with the remaining schools fully involved in planning and development stages.
Building Hope has led «20 in 10» partner schools in developing their architectural plans, identifying appropriate locations, securing project financing, and managing design and construction phases.
We assist corporations, government entities, developers and nonprofit agencies with all phases of school design, planning, development, financing, construction, operations and curricula.
A board - approved phasing plan for bond projects is being implemented by the district's Facilities Planning and Construction (FPC) Division.
costs» means amounts substantially all of which are paid by, or for the account of, an obligor in connection with a project, including the cost of» (A) development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, permitting, preliminary engineering and design work, and other preconstruction activities;» (B) construction, reconstruction, rehabilitation, replacement, and acquisition of real property (including land relating to the project and improvements to land), environmental mitigation, construction contingencies, and acquisition of equipment; and» (C) capitalized interest necessary to meet market requirements, reasonably required reserve funds, capital issuance expenses, and other carrying costs during construction
Spring Mountain's plan — already in the construction phase — is to expand, increasing the total track distance to 14.5 miles.
Project management plan consists of several phases including initiation, planning and design, execution and construction, monitoring and controlling systems.
NTR delivered its first net profit since 2008, it also indicated continued profitability for the current year, the share price is trading near a 4 year high, the construction - phase 150 MW Osage wind project was sold for USD 60 million post year - end, the annual report was accompanied by a new Shareholders Communications Policy & a useful Explanatory Guide, while Rosheen McGuckian (the CEO) has been out courting the press & talking about NTR's new expansion plans.
Following a rigorous two - year planning phase, construction began in 2005 with an ambitious project to reclaim 62 million cubic meters of land from the Arabian Gulf.
WHILE WE WORK operates as a storyteller and as a score that oscillates between the liveness and the memory of Agora's work in relation to their building — a space in constant mutation, where working phases and changes of plans are part of its daily construction, as well as the multiple informations, stories and rumours that have been circulating.
An immersive environment by James Turrell, indoor light - and - poetry projections by Hoosick Falls artist Jenny Holzer and music spaces centered around the instrumentation and mindset of the late composer and community - music innovator Gunnar Schonbeck are among the long - term installations being planned for Building 6 in MASS MoCA's Phase III construction, which is being funded with a $ 25.4 million state grant announced in August and an aimed - for $ 30 million in private capital of which roughly $ 13.5 million has been raised.
Dams Simultaneous with the hundreds of millions of dollars being invested in highways, several major hydroelectric dams are in the planning or initial construction phase.
The Passive House Institute has provided comprehensive support throughout the planning phase and will continue to do so during the building's construction.
I worked closely with them through the planning, design and construction phases.
(21) «Construction of the first cell in the expansion plan (Phase I) was completed and approved for use by the Ohio EPA in December of 2000 at cost of $ 3,300,000.
There are five planned CCS projects in the UK but none has reached the construction phase, let alone started operating.
The Renewable Energy Leasing Process — BOEM's renewable energy program occurs in four distinct phases: (1) planning and analysis, (2) lease issuance, (3) site assessment, and (4) construction and operations.
Five of the six projects are still in the planning phase, with one project listed as under construction.
SkyPower FAS Energy is committed to work closely with both governments for the planning, financing, and construction of 3,000 MW of utility - scale solar PV energy projects for the Nigerian power grid, which are expected to reach commercial operation in phases starting in 2015.
The agency expects the construction plan will consist of four, two - year phases, ensuring completion of the build - out in 8 years — or by 2028, to be followed by 25 years of operation.
He has created and negotiated tailored suites of contracts covering all facets of execution of a number of different mega-projects, from conceptual design and bid phases through to construction and commissioning, and has provided strategic advice to major owners and contractors on the planning, coordination and performance of significant projects.
13.3 (1) Despite section 100 of the Act, if an owner developer is in compliance with the dates for the beginning of construction of each phase as set out in the Phased Strata Plan Declaration or amended Phased Strata Plan Declaration, the strata corporation established by the deposit of a phased strata plan may not pass a resolution under that section until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner devePhased Strata Plan Declaration or amended Phased Strata Plan Declaration, the strata corporation established by the deposit of a phased strata plan may not pass a resolution under that section until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner develoPlan Declaration or amended Phased Strata Plan Declaration, the strata corporation established by the deposit of a phased strata plan may not pass a resolution under that section until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner devePhased Strata Plan Declaration, the strata corporation established by the deposit of a phased strata plan may not pass a resolution under that section until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner develoPlan Declaration, the strata corporation established by the deposit of a phased strata plan may not pass a resolution under that section until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner devephased strata plan may not pass a resolution under that section until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner developlan may not pass a resolution under that section until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner developer.
(2) Despite any provision of the Act, if an owner developer is in compliance with the dates for the beginning of construction of each phase as set out in the Phased Strata Plan Declaration or amended Phased Strata Plan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner devePhased Strata Plan Declaration or amended Phased Strata Plan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner develoPlan Declaration or amended Phased Strata Plan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner devePhased Strata Plan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner develoPlan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner devephased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner developlan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner developer:
Working closely with Proskauer's team of estate planning and administration lawyers, Jonathan litigates undue influence claims, will and trust contests, inheritance disputes, breach of fiduciary duty claims, trust construction and modification actions, and similar probate and trust matters through all phases of dispute resolution.
From creating technical drawings and advising on materials and construction procedures to working closely with technicians and engineers and driving achievement of client objectives, I have proven success in facilitating and leading all phases of construction project design and planning.
A construction manager will oversee these construction projects from the planning phase up to the stage of completion.
Supervise new construction projects including quarters, office space and all phases of construction, remodeling, planning, and management activities.
Coordinated with clients to plan and consult architectural construction projects in both design and build phases.
Architectural managers are present at construction sites to monitor and ensure that every phase of construction is in accordance with building plan and set deadline.
Contributed to diverse range of projects in design and planning phases, as well as preparing construction drawings, contract documents, and landscape detailing, plans, and schedules.
Project Manager — Whitehawk Ranch Development Company 1990 - 2003 Oversaw entire construction project for Whitehawk Ranch Development Company that is a 956 - acre phased planned unit community located 38 miles north of Truckee, CA in the Feather River area of Plumas County.
• Ensured smooth and efficient execution of the construction plan up till the mechanical detailing phase • Coordinated construction stages, resources and equipment availability and quality assurance, acting as liaison among subcontractors and company executives • Implemented state issued safety guidelines related to building construction • Reviewed and approved field action memos (FAMs) for subcontractors
Carpenter's Helper, Quality Installations LLC, Sedona, AZ — 6/2000 -3 / 2004 • Maintained cleanliness and safety of work area • Installed doors, windows, and a variety of flooring types in over 100 homes and businesses • Demolished interior walls in accordance with construction safety standards • Assisted in all phases of construction, from planning to finishing • Inventoried materials and equipment, putting in orders when necessary • Installed and repaired sheetrock, ceilings, and trusses
• Assisted Project Assistant with planning and scheduling construction timelines and ensuring that those timelines were adhered to throughout each phase of construction.
a b c d e f g h i j k l m n o p q r s t u v w x y z