Please join PHCA members Sean Misskelley and Katy Hollbacher for a tour and special presentation on this Passive House project, which features Advanced
Framing wall construction, SIPS roof, triple - pane windows, heat recovery ventilation, a mini-split heat pump, and solar PV and water heating.
Not exact matches
Those increases could impact what developers pay for steel used to
frame buildings, rebar that goes into reinforced concrete structures, studs for interior
framings and aluminum casements for curtain
walls, among other
construction materials.
THE BUILDING The method of
construction consisted of reduced level excavations, pad foundations, steel
frame with pre-cast concrete floors and various façades, such as brick, render and curtain
walling.
In 2005, the artist opened lesser new york in her Williamsburg loft, which was a response to Greater New York (2005) but it was lesser; it was a greater response to the lesser limits of the art world that she saw reflected in PS1's concurrent survey; this lesser exhibit / installation was organized under the auspices of a «fia backström production,» a lesser production of curated ephemera such as press releases, invites, posters, and so on culled from found materials and the work of a greater local network of friends and peers; the lesser aesthetics of dejecta, pasted directly onto the
walls, reflects a greater decorative pattern, not unlike Rorschach images of a lesser art industry itself within a critique of a greater institutional relationship to art production; as such, the lesser display of curated ephemera (from nonartists and artists alike) not only comments on the greater vortex of art and capital, but also serves as a lesser gesture toward something like a memorial
wall, not unlike a collection of posters on the greater Berlin Wall, or a lesser improvisational 9 - 11 wall, or, more recently, a greater Facebook wall, or the lesser construction wall surrounding the Second Avenue gas explosion in the East Village, all pointing to a lesser memorial for the greater commodified institution of art consumption; whereas in Backström's lesser new york each move repels consumption by both the lesser value of the pasted paper and its repetition, which dispels the greater value of precious originals; so the act of reinstalling lesser new yorkten years later at Greater New York — the very institution that rejected her a decade earlier — speaks to the nefarious long arm of Capitalism that can morph into an owner of its own critique; so that lesser new york is greater than its initial critique, greater than a work of institutional critique: it is a continuous institutional relationship, a lesser critique that keeps on giving in its new contexts; the collective spirit of artists working together playfully is lesser, whereas the critique of how artists can imagine working alongside the institution is greater, or vice versa; the lesser gesture of a curated mixed - media installation in one's home with no clear identification and no commercial validity becomes untethered when it is greater, and this particular lesser becomes greater in the Greater New York (2015) context; still, the instabilities of the organizing systems by Backström continue to put pressure on both the defining features of art production in both the lesser context and the decade - later greater one; further, the greater question of what constitutes an art as a lesser art becomes a dizzying conundrum when the greater art institution frames the lesser to be greater, when the lesser is invested in its lesser relationship to the grea
wall, not unlike a collection of posters on the greater Berlin
Wall, or a lesser improvisational 9 - 11 wall, or, more recently, a greater Facebook wall, or the lesser construction wall surrounding the Second Avenue gas explosion in the East Village, all pointing to a lesser memorial for the greater commodified institution of art consumption; whereas in Backström's lesser new york each move repels consumption by both the lesser value of the pasted paper and its repetition, which dispels the greater value of precious originals; so the act of reinstalling lesser new yorkten years later at Greater New York — the very institution that rejected her a decade earlier — speaks to the nefarious long arm of Capitalism that can morph into an owner of its own critique; so that lesser new york is greater than its initial critique, greater than a work of institutional critique: it is a continuous institutional relationship, a lesser critique that keeps on giving in its new contexts; the collective spirit of artists working together playfully is lesser, whereas the critique of how artists can imagine working alongside the institution is greater, or vice versa; the lesser gesture of a curated mixed - media installation in one's home with no clear identification and no commercial validity becomes untethered when it is greater, and this particular lesser becomes greater in the Greater New York (2015) context; still, the instabilities of the organizing systems by Backström continue to put pressure on both the defining features of art production in both the lesser context and the decade - later greater one; further, the greater question of what constitutes an art as a lesser art becomes a dizzying conundrum when the greater art institution frames the lesser to be greater, when the lesser is invested in its lesser relationship to the grea
Wall, or a lesser improvisational 9 - 11
wall, or, more recently, a greater Facebook wall, or the lesser construction wall surrounding the Second Avenue gas explosion in the East Village, all pointing to a lesser memorial for the greater commodified institution of art consumption; whereas in Backström's lesser new york each move repels consumption by both the lesser value of the pasted paper and its repetition, which dispels the greater value of precious originals; so the act of reinstalling lesser new yorkten years later at Greater New York — the very institution that rejected her a decade earlier — speaks to the nefarious long arm of Capitalism that can morph into an owner of its own critique; so that lesser new york is greater than its initial critique, greater than a work of institutional critique: it is a continuous institutional relationship, a lesser critique that keeps on giving in its new contexts; the collective spirit of artists working together playfully is lesser, whereas the critique of how artists can imagine working alongside the institution is greater, or vice versa; the lesser gesture of a curated mixed - media installation in one's home with no clear identification and no commercial validity becomes untethered when it is greater, and this particular lesser becomes greater in the Greater New York (2015) context; still, the instabilities of the organizing systems by Backström continue to put pressure on both the defining features of art production in both the lesser context and the decade - later greater one; further, the greater question of what constitutes an art as a lesser art becomes a dizzying conundrum when the greater art institution frames the lesser to be greater, when the lesser is invested in its lesser relationship to the grea
wall, or, more recently, a greater Facebook
wall, or the lesser construction wall surrounding the Second Avenue gas explosion in the East Village, all pointing to a lesser memorial for the greater commodified institution of art consumption; whereas in Backström's lesser new york each move repels consumption by both the lesser value of the pasted paper and its repetition, which dispels the greater value of precious originals; so the act of reinstalling lesser new yorkten years later at Greater New York — the very institution that rejected her a decade earlier — speaks to the nefarious long arm of Capitalism that can morph into an owner of its own critique; so that lesser new york is greater than its initial critique, greater than a work of institutional critique: it is a continuous institutional relationship, a lesser critique that keeps on giving in its new contexts; the collective spirit of artists working together playfully is lesser, whereas the critique of how artists can imagine working alongside the institution is greater, or vice versa; the lesser gesture of a curated mixed - media installation in one's home with no clear identification and no commercial validity becomes untethered when it is greater, and this particular lesser becomes greater in the Greater New York (2015) context; still, the instabilities of the organizing systems by Backström continue to put pressure on both the defining features of art production in both the lesser context and the decade - later greater one; further, the greater question of what constitutes an art as a lesser art becomes a dizzying conundrum when the greater art institution frames the lesser to be greater, when the lesser is invested in its lesser relationship to the grea
wall, or the lesser
construction wall surrounding the Second Avenue gas explosion in the East Village, all pointing to a lesser memorial for the greater commodified institution of art consumption; whereas in Backström's lesser new york each move repels consumption by both the lesser value of the pasted paper and its repetition, which dispels the greater value of precious originals; so the act of reinstalling lesser new yorkten years later at Greater New York — the very institution that rejected her a decade earlier — speaks to the nefarious long arm of Capitalism that can morph into an owner of its own critique; so that lesser new york is greater than its initial critique, greater than a work of institutional critique: it is a continuous institutional relationship, a lesser critique that keeps on giving in its new contexts; the collective spirit of artists working together playfully is lesser, whereas the critique of how artists can imagine working alongside the institution is greater, or vice versa; the lesser gesture of a curated mixed - media installation in one's home with no clear identification and no commercial validity becomes untethered when it is greater, and this particular lesser becomes greater in the Greater New York (2015) context; still, the instabilities of the organizing systems by Backström continue to put pressure on both the defining features of art production in both the lesser context and the decade - later greater one; further, the greater question of what constitutes an art as a lesser art becomes a dizzying conundrum when the greater art institution frames the lesser to be greater, when the lesser is invested in its lesser relationship to the grea
wall surrounding the Second Avenue gas explosion in the East Village, all pointing to a lesser memorial for the greater commodified institution of art consumption; whereas in Backström's lesser new york each move repels consumption by both the lesser value of the pasted paper and its repetition, which dispels the greater value of precious originals; so the act of reinstalling lesser new yorkten years later at Greater New York — the very institution that rejected her a decade earlier — speaks to the nefarious long arm of Capitalism that can morph into an owner of its own critique; so that lesser new york is greater than its initial critique, greater than a work of institutional critique: it is a continuous institutional relationship, a lesser critique that keeps on giving in its new contexts; the collective spirit of artists working together playfully is lesser, whereas the critique of how artists can imagine working alongside the institution is greater, or vice versa; the lesser gesture of a curated mixed - media installation in one's home with no clear identification and no commercial validity becomes untethered when it is greater, and this particular lesser becomes greater in the Greater New York (2015) context; still, the instabilities of the organizing systems by Backström continue to put pressure on both the defining features of art production in both the lesser context and the decade - later greater one; further, the greater question of what constitutes an art as a lesser art becomes a dizzying conundrum when the greater art institution
frames the lesser to be greater, when the lesser is invested in its lesser relationship to the greater.
Hagen emphasises this difference in level by making a self - supporting
construction in metal space
frames — structures formed by interlocking struts — that forms an L - shape, jutting out from the first - floor space and meeting the
wall of the lower main space at an angle.
Meant to appear roughly cut, jagged and haphazard, the
construction of «The Cutters» (2007 — 2010) is as intentional and meticulous as the draped - canvas
framing of the hollow - core door on the rear
wall.
The impact of these interactions on her art is readily apparent in her «painting
constructions» such as Sphinx (1962), a chaotic diorama, which preserves the rectangular space of the
frame and its presentation hanging on a
wall but expands into space, providing a capsule in which to assemble objects from everyday life, linked and layered together with string and smears of paint.
engineered lightweight timber
frame construction (FSC Certified) Warmcell cellulose fibre insulation external
wall and roof cladding varies (options include timber, corten steel, fibre cement, rubber, aluminium, zinc) aluminium & timber composite windows by Velfac internal doorset by Sunfold rooflight (optional extra) by The Rooflight Company Energy Label A + rated kitchen appliances sanitaryware by Duravit; fittings by Hansgrohe stainless steel drainage pipes and fittings by Blucher LED / low energy lighting by Philips electric underfloor heating by DEVI photovoltaic panels (optional extra); solar water heating (optional extra) whole house ventilation by Vent - Axia (optional extra) wood burning fireplace by M Design linoleum / cork flooring by Forbo; timber flooring by Junkers; carpet / plant fibre flooring by Crucial Trading solvent / VOC free paint and varnish by Ecos Organic Paints bike storage by Cycloc
The level of vapor control required on the interior side of
framed walls with typical fibrous cavity insulation (fibreglass, rockwool, or cellulose) is determined based on DOE climate zone of
construction (see climate map).
«Because it was split level, it had to have a retaining
wall along the back, and if it was going to be any other
construction type, timber
frame or block
wall, a concrete retaining
wall would have had to go in there.
Part 2 -
Construction details that your plan should cover Trailer Foundation
Wall Framing Sheathing Windows And Door Rough Openings Roof
Framing and Sheathing Skylights Doors Siding Trim Work Install Roofing Rough Plumbing Insulate Install Major Appliances Flooring
Walls Kitchen Bathroom Sleeping Loft Main Room
RV trailers may also have this issue as the materials they use are not going to be the same as your home
construction, such as wood
frame 2 × 4
walls with insulation and fire suppressing
wall panels.
This
construction uses 2» XPS rigid insulation against the concrete foundation and a 2x4
framed wall with R - 13 unfaced fiberglass insulation in the stud space.
This
construction uses 2 layers of 2» foil - faced polyisocynaurate insulation against the concrete foundation and a 2x6
framed wall with R - 19 unfaced fiberglass insulation in the stud space.
The thickness of
walls depends on the U-values required which in turn is greatly dependant on the performance of the insulation, the type of
construction (whether concrete or timber
frame), overall design, orientation, compactness and so forth.
1 Oscar Baldry getting down to work in the old newsagent's shop; 2 laying Kingspan and Ecotherm insulation in the ground floor of the old shop; 3 first floor metal web joist detailing, with membrane behind the joists for airtightness; 4 ground floor
walls feature 50 mm Xtratherm internal insulation; 5 this is followed inside by an Intello vapour control barrier and a further 25 mm Xtratherm; 6 the new timber
frame first - floor twin - stud
walls and roof rafters are of a fully breathable
construction and full - filled with Warmcel cellulose insulation; 7 holes in the timber -
frame where the Warmcel insulation was pumped in; 8 a pro clima Intello membrane on the inside of the first - floor
walls and roof; 9 and finally, 50 mm Thermafleece (sheep wool) lined service cavity to the interior.
By contrast, the new timber
frame first - floor
walls and roof are of a fully breathable
construction consisting of a twin - stud
wall filled with Warmcel cellulose (recycled newspaper) insulation.
(clockwise from left) The building's oak
frame under
construction and exposed in the finished home; the make - up of the external
walls thermal layers coming together with structural insulated panels, studded out externally to include 100 mm of Metac; beneath 80 mm Gutex wood - fibre boards
This
construction uses 2x4
framed wall offset 2.5» from concrete with 6» open cell low density spray foam (R - 21) between and behind the stud
wall.
Vinyl interior
wall coverings are not exclusive to masonry or concrete
wall systems and are also used with wood
frame construction.
House Plans are fully integrated
construction drawing sets that include floor plans,
framing plans and
wall framing elevations, exterior elevations, building and
wall sections, and mechanical and electrical plans.
Wall and Ceiling
Framing Building
Construction Trades Technology Certificate Willing to relocate: Anywhere
• Perform needs - based technical assessments to identify areas of concern while facilitating an effective and timely solution to any
construction issues • Ability to organize and manage
construction and renovation process from initial consultation to job completion, while collaborating effectively with other staff, material and equipment vendors, and firm management • Experienced in Wood replacement, roof material and skylight installation, commercial
framing, tilt up,
Frame wall, steel studs and wood
framing, Semi Retrofit, lay outing, Patio cover, patio decks, cantilevered deck, concrete repairs, fencing wood, block and wrought iron.
Accurately calculating number of metal studs and tracks required for
framing walls or ceilings prior to
construction
frame new commercial
walls with commercial material, Install drywall, Repair drywall new and remodeling
construction
Professional Experience SMC
Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and
construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million
construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal
framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the
construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the
construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain
wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior
walls on 3 sides of the building and install complex new curtain
wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
constructionconstruction
Draw pictures, bring small photos, or cut little pictures found in magazines, and glue them to
construction paper, creating a «picture
frame», and glue or tape these
framed pictures to the
walls.
Amenities: Street Lights, Boathouse: No Dock Or Boathouse, Cooling Source: Electric, Cooling Type: Central, Kitchen Equipment: Dishwasher, Kitchen Equipment: Garbage Disposal, ES Bus: Yes, Patio, Out Building, Fees Include: None, Fireplace Location: Family Room, Fireplace Type: Factory Built, HS Bus: Yes, Hardwood Floors,
Wall - to - wall Carpet, Walk - in Closet, Kitchen: Solid Surface Counters, List Type: Exclusive Right To Sell, Lot Description: Level Lot, Lot Size: 2 - 1 Acre, MS Bus: Yes, Photo Available: YES, Ownership: Fee Simple, Photo: Broker Will Provide Photo, Parking: Parking Pad, Parking: 2 Car, Rooms: Great Room, SQFT Source: Public Record, State: GA, Share Address with Public Websites: Yes, Include in Auto - Valuation Models: Yes, Allow additional comments: Yes, Share with Public Websites: Yes, Water: Public Water, Equipment: Fire, Amenities: Pool, Cable In Street, Wet Bar, Energy Related: Thermo, Energy Related: Water Heater - gas, Kitchen: Breakfast Area, Kitchen: Walk - in Pantry, Lot Description: Wooded, Lot Description: Private Backyard, Fireplace Type: Gas Starter, Heating Source: Gas, Date Of Possession: Negotiable, Parking: Detached, Parking: Garage, Foyer - Entrance, Rooms: DR - Separate, Rooms: Office, Laundry Type: Room, Showing Instructions: Appt Owner, Style: Traditional, Swift Entry: Yes, Water: Sewer Connected, Construction: Frame, Kitchen Equipment: Refrigerator, Lot Description: Cul De Sac, Rooms: Sun Room, Acreage Source: Public Record, Garden Area, Accessibility: Garage Van Access, Amenities: Tennis Courts, Basement: Crawlspace, Market Code: Available, Rooms: Dining Room Seats 12 +, Stories: Over 2 Stories, Parking: Rear Entrance, Amenities: Walk To Shopping, Heating Type: Other (See Remarks), Amenities: Clubhouse, Equipment: Satellite Dish, source: RETS, Skylight, Special Conditions: Agent Owned, Hot Tub, Accessibility: 32» Doors, Area: FUN1, Elementary School: GA, High School: GA, Middle School: GA, High School: Fulton County, Middle School: Fulton County, Elementary School: Fulton Co
Wall - to -
wall Carpet, Walk - in Closet, Kitchen: Solid Surface Counters, List Type: Exclusive Right To Sell, Lot Description: Level Lot, Lot Size: 2 - 1 Acre, MS Bus: Yes, Photo Available: YES, Ownership: Fee Simple, Photo: Broker Will Provide Photo, Parking: Parking Pad, Parking: 2 Car, Rooms: Great Room, SQFT Source: Public Record, State: GA, Share Address with Public Websites: Yes, Include in Auto - Valuation Models: Yes, Allow additional comments: Yes, Share with Public Websites: Yes, Water: Public Water, Equipment: Fire, Amenities: Pool, Cable In Street, Wet Bar, Energy Related: Thermo, Energy Related: Water Heater - gas, Kitchen: Breakfast Area, Kitchen: Walk - in Pantry, Lot Description: Wooded, Lot Description: Private Backyard, Fireplace Type: Gas Starter, Heating Source: Gas, Date Of Possession: Negotiable, Parking: Detached, Parking: Garage, Foyer - Entrance, Rooms: DR - Separate, Rooms: Office, Laundry Type: Room, Showing Instructions: Appt Owner, Style: Traditional, Swift Entry: Yes, Water: Sewer Connected, Construction: Frame, Kitchen Equipment: Refrigerator, Lot Description: Cul De Sac, Rooms: Sun Room, Acreage Source: Public Record, Garden Area, Accessibility: Garage Van Access, Amenities: Tennis Courts, Basement: Crawlspace, Market Code: Available, Rooms: Dining Room Seats 12 +, Stories: Over 2 Stories, Parking: Rear Entrance, Amenities: Walk To Shopping, Heating Type: Other (See Remarks), Amenities: Clubhouse, Equipment: Satellite Dish, source: RETS, Skylight, Special Conditions: Agent Owned, Hot Tub, Accessibility: 32» Doors, Area: FUN1, Elementary School: GA, High School: GA, Middle School: GA, High School: Fulton County, Middle School: Fulton County, Elementary School: Fulton Co
wall Carpet, Walk - in Closet, Kitchen: Solid Surface Counters, List Type: Exclusive Right To Sell, Lot Description: Level Lot, Lot Size: 2 - 1 Acre, MS Bus: Yes, Photo Available: YES, Ownership: Fee Simple, Photo: Broker Will Provide Photo, Parking: Parking Pad, Parking: 2 Car, Rooms: Great Room, SQFT Source: Public Record, State: GA, Share Address with Public Websites: Yes, Include in Auto - Valuation Models: Yes, Allow additional comments: Yes, Share with Public Websites: Yes, Water: Public Water, Equipment: Fire, Amenities: Pool, Cable In Street, Wet Bar, Energy Related: Thermo, Energy Related: Water Heater - gas, Kitchen: Breakfast Area, Kitchen: Walk - in Pantry, Lot Description: Wooded, Lot Description: Private Backyard, Fireplace Type: Gas Starter, Heating Source: Gas, Date Of Possession: Negotiable, Parking: Detached, Parking: Garage, Foyer - Entrance, Rooms: DR - Separate, Rooms: Office, Laundry Type: Room, Showing Instructions: Appt Owner, Style: Traditional, Swift Entry: Yes, Water: Sewer Connected,
Construction:
Frame, Kitchen Equipment: Refrigerator, Lot Description: Cul De Sac, Rooms: Sun Room, Acreage Source: Public Record, Garden Area, Accessibility: Garage Van Access, Amenities: Tennis Courts, Basement: Crawlspace, Market Code: Available, Rooms: Dining Room Seats 12 +, Stories: Over 2 Stories, Parking: Rear Entrance, Amenities: Walk To Shopping, Heating Type: Other (See Remarks), Amenities: Clubhouse, Equipment: Satellite Dish, source: RETS, Skylight, Special Conditions: Agent Owned, Hot Tub, Accessibility: 32» Doors, Area: FUN1, Elementary School: GA, High School: GA, Middle School: GA, High School: Fulton County, Middle School: Fulton County, Elementary School: Fulton County
New Home
Construction Reviews typically follow strategic steps throughout the construction process including: Site preparation and Foundation / Basement construction, Rough Framing and Roofing with Rough - in of Plumbing, HVAC and Electrical, Insulation installation, Drywall / Interior wal
Construction Reviews typically follow strategic steps throughout the
construction process including: Site preparation and Foundation / Basement construction, Rough Framing and Roofing with Rough - in of Plumbing, HVAC and Electrical, Insulation installation, Drywall / Interior wal
construction process including: Site preparation and Foundation / Basement
construction, Rough Framing and Roofing with Rough - in of Plumbing, HVAC and Electrical, Insulation installation, Drywall / Interior wal
construction, Rough
Framing and Roofing with Rough - in of Plumbing, HVAC and Electrical, Insulation installation, Drywall / Interior
wall finishing.
While Chileans initially responded to the 1960 earthquake there, which hit 9.5, by tightening
construction codes and reinforcing concrete
frames with numerous reinforced concrete
walls, called shear
walls, their vigilance soon wore off in the face of cost - saving.
More than 30 BASF employees worked on various aspects of
construction, installing roofs, exterior
walls and exterior
frames for the homes.