ISO New England president Gordan van Welie said «coal and oil power plants rarely run most of the year, but they are still needed during extreme weather events.
ISO New England CEO Gordon van Welie said the operator conducted the study «as a logical extension of our responsibility to ensure power system reliability in New England.
An ISO New England study found that as the fuel mix shifted toward natural gas, regional emissions dropped 91 percent for sulfur dioxide and 56 percent for nitrogen oxide (as well as 22 percent for carbon dioxide) between 2006 and 2015.
In ISO New England, a third of generation is coming from fuel oil today.
Brutal cold weather across portions of the country is altering the power mix for some electric grids, with oil leading over gas in ISO New England and coal doing the same in PJM.
Differences in ISO New England's net forecast for 2018 are influenced by updates to its energy efficiency and distributed solar forecasts.
Following ISO New England's January release of its initial draft fuel security study, a broad cross-section of the region's electricity stakeholders — including environmental groups, consumer advocates, and power companies — cried foul.
Going forward, these trends will be increasingly important to follow and capture in future forecasts by ISO New England.
Looking forward in CELT 2018, ISO New England estimates that over the next decade, annual demand for electricity will decline by 0.86 percent per year, on average (see Figure 1).
One glaring example: ISO New England assumed the region would build less renewable energy than New England's state laws currently mandate, by over a thousand megawatts.
While the corrected study results are good news, we remain concerned that ISO New England continues to cite its now - debunked original findings and isn't incorporating the newest study results into its work.
As with annual energy consumption, ISO New England's forecasts for peak summer demand have steadily declined, with CELT 2018 forecasting that New England's peak demand for electricity will be below 2004 levels by 2027 (on a weather - normalized basis).
By 2027, ISO New England forecasts that the six New England states will use less electricity (on an annual basis) than at any point since 1996.
Finally, it is important to note that ISO New England's forecasts make no explicit assumptions regarding the future electrification of other sectors, including heating (via high - efficiency heat pumps) or the transportation sector (via electric vehicles).
State agencies, electric utilities, advocacy organizations, and ISO New England itself use the forecast to estimate future demand for electricity.
By 2027, ISO New England forecasts that winter peak demand will be lower than in any winter since the early 1990s.
However, ISO New England's estimates of future distributed solar and energy efficiency continue to have known deficiencies, including problematic assumptions regarding the discounting of state policy requirements, future technology costs trends for both solar and efficiency measures, disappearance of tax credits, and other state - specific incentives.
In fact, for winter 2018/2019 (December through March), ISO New England forecasts a winter peak demand of 650 MW less than it did one year ago — a reduction roughly equivalent in size to the Pilgrim nuclear power plant in Plymouth, MA.
We further note that previous suggestions by the ISO that renewable energy could exacerbate fuel security problems in the region have been thoroughly debunked — by ISO New England itself.
Each year, ISO New England receives and relies upon an analysis of regional, and state - level, macroeconomic indicators from Moody's Analytics, who forecast changes to the region's gross domestic product, employment, housing stock, and population.
As other regional grid operators, such as PJM, look to evaluate fuel security, they should also ensure that they avoid ISO New England's mistakes.
We also filed a second set of comments together with the Massachusetts Attorney General's Office, Conservation Law Foundation, and others, that provides FERC with a new report from Synapse Energy Economics that clearly explains the results of ISO New England's recent updated analysis.
ISO New England estimates more days like this can be expected in the spring and fall.
ISO New England's comments to FERC are based on a recent analysis the ISO undertook of «fuel security risk» in the region, which it defined as «the possibility that power plants won't have or be able to get the fuel they need to run.»
For several years, NRDC and others have raised concerns about ISO New England's forecasts of future renewable energy and energy efficiency, which consistently and often substantially undervalue and under - predict clean energy resource growth.
ISO New England's analysis reveals that in winters to come fuel insecurity will plague the region.
The hostility to pipelines is so pervasive in the northeast that ISO New England takes that bleak view that «no new incremental gas infrastructure will be built to serve power generation.»
Sadly, ISO New England's message has gone unheeded and insidious laws and regulations continue to harm the region.
Instead we are now being warned by ISO New England that in future winters utilities will be unable to meet demand during bouts of frigid weather.
On Jan. 23, ISO New England CEO Gordon van Welie testified before the Senate Energy and Natural Resources Committee that, «when it gets cold the region does not have sufficient gas infrastructure to meet demand for both home heating and power generation.»
Henry Yoshimura is the Director of Demand Resource Strategy for ISO New England where he is responsible for integrating distributed energy resources (energy efficiency, demand response, distributed generation) into the New England wholesale electricity market.
At ISO New England, he worked with industry stakeholders to develop the market design and rules allowing New England to be the first region to integrate distributed energy resources into the Forward Capacity Market.
NEO - ISO New England North East Massachusetts Zone Off - Peak Calendar - Day 5 MW Day - Ahead LMP Futures
When Gordon Van Wiele, chief executive of ISO New England — in charge of transmission in the six - state region — unfurls a map of the land there, large ovals show the location of the best wind sites: Vermont near the Quebec border and eastern Maine spilling over into New Brunswick.

Not exact matches

The new standard is referred to as ISO 9001:2000 but is often still referred to simply as ISO 9000.
An organization was required to demonstrate to an accredited registration body that its quality management system met the requirements of the new ISO 9001:2000.
As it happens, I'm currently in Madrid as part of the Canadian delegation to an International Standards Organization working committee that is drafting a new Anti-Bribery Management Systems standard (ISO 37001).
«ISO 9000 — A plus for airports: consultant Steve Irwin offers reasons why airports can benefit from a new standard.»
A new joint International Dairy Federation (IDF) / International Organization for Standardization (ISO) Standard (ISO 19344 IDF 232) has just been released to provide a method for the quantification of lactic acid bacteria by flow cytometry in fermented products, starter cultures, and probiotics used in dairy products...
This new facility has a rated production capacity of more than 17,000 tons annually and received its ISO: 17025:2005 FSMS certification last year.
SafeThe recently CE marked TM5 now incorporates the new ISO / TS 15066 guidelines on safety in collaborative robots systems, which covers four types of collaborative operation:
Short - Run Packaging Firm SoOPAK Accentuates Customer Service and Quality With Its New ISO 9001:2008 Certification
During his presentation, «The Coffee Journey,» Brett Anderhub of Rekerdres & Sons Insurance, covered the perilous movement from farm to cup (who knew that the concept of General Average is actually in the Bible), while Jack Steijn, chair of ISO and CEN committees on sustainable and traceable cocoa and co-founder of Equipoise, a consultancy for sustainable commodities, talked about the new ISO Standards for sustainability that will be issued in 2018, and whether or not sustainable practices that are being used in cocoa production can be applied to coffee.
ISO: Volunteers for Allentown's new before - school program (July 26, 2011): In Pennsylvania, the Allentown School District is implementing a before - school breakfast, tutoring and fitness program called «Start Your Day Right.»
New red - green electoral alliances, a turn to ecosocialism and a deepening of the US International Socialist Organization's rethink on feminism were key features of the ISO's well - attended Socialism 2014 conference in Chicago.
In New York, the ISO's Brian Jones is Hawkins» running partner for the race, running for lieutenant governor.
ISO - New England's...
The New York Independent Systems Operator (ISO) recently released a proposal, aimed at getting wholesale energy markets to reflect the state's aggressive decarbonization goals.
Our global network of Laboratories for Personalized Molecular Medicine are CLIA / CAP accredited, New York State licensed in the US, and ISO 15189 / DAkkS certified in Germany.
All of the fee - for - service and research and development activities of the Mouse Clinical Institute have been certified under the new French Standard NF X50 - 900 and the International Standard ISO 9001:2008 in the following areas:
a b c d e f g h i j k l m n o p q r s t u v w x y z