For something that the wind industry
keeps telling us is as rare as hen's teeth, the unshackling of 10 tonne blades (euphemistically called «component liberation»), the total collapse of 200 - 300 tonne
turbines and the spontaneous
combustion of
turbine generators (and the 1,000 litres of highly toxic gear and hydraulic oil that slosh around inside the -LSB-...]