Not exact matches
President Donald Trump's decision to impose tariffs on cheap imported
panels was intended to protect American manufacturing
jobs, but many in the solar industry have argued that tariffs will raise costs and trigger thousands of layoffs in the
installation end of the industry.
The electric
panel / fuse box actually caught on fire recently as a result of the poor
installation job that the 3rd - party installer did when they hooked up the heated seats.
Of course, these
panels needed someone to install them, creating new
job opportunities in the US and abroad and the pace of
installations quickly increased with competition, new market openings, and better
panels that snapped together.
Implement nation's largest solar power cash back program (also known as a feed - in tariff) that will increase solar
panel installations and create local
jobs; and
President Donald Trump's approval of a four - year tariff on imported solar
panels will raise costs, cut
installations, reduce
jobs and slow the decline in greenhouse gas emissions.
• Particularly effective in roofing, repairing, re-roofing and insulating pre-installed roofs for commercial projects in a timely, organized and team oriented manner • Specialized expertise in EPDM, TPO, PVC and shingling • Skilled in carrying out maintenance and repair of mechanical, electrical and other physical structures • Well - versed in painting of structures, performing carpentry work, repairing plumbing fixtures and woodwork • Excellent physical stamina, ability to climb a ladder, bend, stoop and work in confined spaces • Special talent for metal roofing construction including flashing, wall
panels, fascia and soffit • Apt at using various tools needed for cutting hammering and fastening roofing materials • Track record of completing projects in strict accordance with
job specifications, project layout and applicable safety guidelines • Profound skills in
installation of low sloped roof systems including TPO, BUR and bitumen • Proficient in carrying - out general roof repairs, exterior siding adjustments and HVAC
installation repairs • Particularly effective in removal and
installation of all types of commercial roof systems including slate, tile and asphalt • Well practiced in covering roofs with topping material including sheets, PVC and spray foam • Adept at utilizing manual and electric tools and maintaining the same in a functional order • Efficient in laying and adhering insulation with metal fasteners or binding adhesives • Expert in cutting stripes of flashing and fitting into angles formed by walls, vents and intersecting roof surfaces • Firsthand experience in carrying out regular preventive maintenance of pre-installed roofing systems • Substantial knowledge of various roofing systems and associated
installation protocols • Familiar with OSHA workplace safety guidelines • Excellent listening skills with profound ability to follow verbal and written instructions to book • Great attention to detail with proven skills in interpreting and implementing given drawings and blueprints with accuracy • Strong numeracy skills, apt at generating accurate cost estimations for given projects
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement,
installation of HVAC system with new boilers and ductwork, plumbing with Solar
panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain
job site and public safety allowing use of the convention center during ongoing construction