Not exact matches
Engineering construction contractor Primero
Group has entered into the final
stages of its contract to build the domestic gas meter station at Chevron's Wheatstone
project.
A joint venture between Viento
Group and indigenous - owned Kimberley Pipelines has been awarded a $ 9.8 million pipeline construction works contract for the first
stage of Fortescue Metals
Group's North Star magnetite
project in the Pilbara..
A subsidiary of Spanish - controlled CIMIC
Group will build the final
stage of the $ 1.12 billion Northlink WA roads
project, with the state government awarding the last unassigned portion of work today.
Fortescue Metals
Group has awarded Perth - based Intellect Systems, a subsidiary of Resource Development
Group, a control and engineering services contract for the first
stage of its North Star magnetite
project in the Pilbara.
A visual of an idea with succinct requirements tends to be shared more across
groups, thereby, increasing early -
stage comprehension of a new idea or
project.
The second
stage of the
project has focused on sharing these experiences — both amongst the various
groups involved and to other
groups currently facing forced evictions — through an international exchange event held in Istanbul, one of the participating cities, in February 2010.
In the West Brighton section of Staten Island, small
groups of people walk across the street from the
project buildings into the parking lot of New Hope Community Church, where they dodge basketballs whizzing by before congregating in a beautifully renovated building that was a
staging area for an underground pit bull fighting ring up until a few years ago.
To achieve this design -
stage accreditation, the
project is assessed using a system of environmental measures
grouped by management, health and well - being, energy, transport, water, materials, waste, land use and ecology, pollution, and innovation.
Tot Hacks serial is a collaborative
project by
group of moms sharing tips, we call them tot hacks, to help other parents survive different
stages of development with toddlers, including so - called «Terrible Two's» and «Tempting Three's».
CHELSEA — The City Planning Commission set the
stage Monday for the a seven - month - long public review process for the controversial Chelsea Market expansion
project, which is expected to pit pro-business supporters and neighborhood opposition
groups.
The DNA Repair Research
Project is still in its early
stages, but members of the
group are committed to helping in the fight against cancer.
The first
stage of SHRC's Joint Initiative is underway, as each working
group is determining how Article 15 is relevant to its area of activity and developing
projects aimed at contributing to the clarification and promotion of the right to the benefits of scientific progress.
Each
group meets regularly to discuss and critique member
projects at all
stages — from pitching to editors to final revisions.
The NIH Director's New Innovator award is designed specifically to support a small
group of creative scientists at an early
stage of their career with an emphasis on innovative, high - impact
projects, according to the NIH website.
In fact, radical collective
projects of the late»60s represented a crucial
stage for the avant - garde cinema of that era; see, for example, Chris Marker's Medvedkin
Group, also founded in 1968.
While 21st - century pedagogy puts
group projects and collaborative learning at center
stage for students, these cooperative habits have not yet assumed such a prominent role for teachers.
The beginning of units and the final
stages of
projects are either times when we work as a unified class, or times when students and
groups focus on specific, clearly defined tasks.
We have recognised that as theatre
projects were developed it was evident that schools and youth
group leaders often didn't have the knowledge or experience of how to
stage a successful show.
When the dancers and I visit
groups at their sites in the early
stages of the
project, we regularly see young people doubting themselves, the process and the
project.
Students from throughout the school move in and out of the
project, but a core
group of about twenty have been involved from cleanup through to the final design
stage, which has taken two years so far.
The Portakabin
Group is now at the final design
stages for four further primary school rebuild
projects in the PSBP batch for Surrey and Kent — Riverview Church of England Primary School in West Ewell, St Bede's Church of England Junior School near Woking, Aylesham Primary School in Canterbury, and Priory Fields Primary School in Dover.
Because the target
group for this
project was early preservice teachers, we designed an interactive video activity that drew heavily from the video annotation approach but changed it because the video annotation approach may be more sophisticated than necessary for early -
stage teacher education students.
The finalists will take the
stage and pitch their solutions to a distinguished panel of judges that includes Jennifer Rudolph Walsh (head of the Literary Department at William Morris Endeavor), David Steinberger (CEO of The Perseus Books
Group and Chairman of the National Book Foundation), Stephen Evans (Director SilverLake Capital), and others.The winning
project will receive a $ 10,000 prize and the opportunity to pitch their idea at a breakfast meeting with Ari Emanuel, Co-CEO of William Morris Endeavor.
don't nobody knock message boards: i participate in three which are absolute mustard: given the right kind of people and enough mutual association, they are the best way to swap ideas and even cooperate on
projects (case in point: the TMF banking board successfully
staged a fight against the Irish minister of finance to defend a bond widely held by its members — including legal action and political lobbying): there is something about the mechanism of general conversation in a small
group of like - minded friends that can really take off
Originally
staged at the Queens Museum of Art, Reyes's Hammer
Project will include a
group of sculptures — including Drone Dove and Colloquium — and several paintings on Tyvek that graphically portray political, social, and environmental issues being faced by our world today.
In 2009, after ten years of marketing work at large museums in DC he moved into the realm of curating,
staging a variety of solo, duo and small -
group shows for the Evolve Urban Arts
Project.
The
project brings together a
group of directors and playwrights recognized for their diverse approaches to
staging across various identifications of class, race, gender, sexuality, ethnicity, and ability, among others, to collaborate with a resident company of actors chosen by them for this
project.
The
project brought together a
group of directors and playwrights recognized for their diverse approaches to
staging across various identifications of class, race, gender, sexuality, ethnicity, and ability, among others.
Stemming from the concept of algorithmic citizenship introduced by artist James Bridle's Citizen Ex
project, this
group exhibition gives center
stage to the work of artists from countries as varied as Ghana, Kuwait, China, Lebanon, Austria and South Africa, all the while reflecting the influence of US - based «computerized processes» over information, aspirations and concerns.
He has participated in numerous
group exhibitions including
Project Los Altos (off - site show in Silicon Valley,
staged by San Francisco Museum of Modern Art, 2013); both Taipei and Sydney Biennials (2010); the Whitney Biennial, New York (2002) and the Venice Biennale (1999, 2013).
The Inivators (Iniva's youth advisory board) are a
group of individuals who are in the early
stages of their creative careers who collaborate with professional artists to realise
projects in response to Iniva's public programme.
In 2014 she
staged solo exhibitions of photographs and sculptures, routinely curated all - female
group shows, put out major editorial and commercial
projects, made a monograph, and recently began...
At the ICA the collaboration is represented by
groups of ceramic objects while at BALTIC there will be a workshop
staged with Paweł Althamer, which echoes this strand in his
project.
Spring Season supported by VEON Samsung Hannah Barry Eleanor and Bobby Cayre Lina Condes Pilar Corrias, London Shelly Fox Aarons and Phillip Aarons Christina Gee - Kryca Gladstone Gallery Alexander Mason Hankin Rena and Scott Hoffman Bernard l. Lumpkin and Carmine D. Boccuzzi Maurice Marciano Kimiya Minoukadeh Fondazione Sandretto Re Rebaudengo Fundación Almine y Bernard Ruiz - Picasso para el Arte Graham Steele and Ulysses de Santi Jed Walentas Jonathan Wood Special
Projects supported by Blake and Michael Daffey Jim and Jennifer Esposito JMCMRJ Sorrell Foundation The Rothschild Foundation Lily Safra Kate and John Storey Platinum Corporate Benefactors AECOM Bloomberg CHANEL Goldman Sachs My Beautiful City
Stage One Weil, Gotshal & Manges Gold Corporate Benefactors COS Laurent - Perrier Silver Corporate Benefactors Gallowglass Health and Safety Veritas Event Services Bronze Corporate Benefactors Casone DP9 Fin Fellows Graham Foundation Maxx Mail USA Peroni Nastro Azzurro Riva1920 SDS Limited Site Engineering Surveys Ltd (SES) The Technical Department Vitra Founding Corporate Members American Express Bloomberg Brookfield Canary Wharf
Group Citi Foster + Partners Harrods The Kirsh Foundation and Wendy Fisher Linklaters LLP William Hare
Group Limited Annual Corporate Member The Paul E. Singer Foundation Associate Corporate Members CBRE Grants INCA Productions The Communications Store Travers Smith Digital
Projects supported by Bloomberg Connects Education Programme supported by Arts Council England The Ernest Cook Trust David Fawkes and family Alexandra Garrison Batia and Idan Ofer Gilberto Pozzi The Sackler Trust And kind assistance from The Royal Borough of Kensington and Chelsea Exhibition Programme supported by Amelie von Wedel, Wedel Art Air de Paris, Paris Art Mentor Foundation Lucerne Bloomberg Philanthropies Candy and Michael Barasch Charles Booth - Gibbon, Paragon Hesta Ltd., Switzerland - Bechtler Family Roberta Benteler Galerie Gisela Capitain Cologne Chaos CHOI&LAGER Gallery DLD Media GmbH Nicoletta Fiorucci ForYourArt Isabelle Georgeaux and Patrick Healy Goethe - Institut Google Cultural Institute Graham Foundation for Advanced Studies in the Fine Arts Gumuchdjian Architects The Hayden Family Foundation The Henry Moore Foundation Joseph Hage Aaronson LLP rodolphe janssen, Brussels David Kordansky Gallery, Los Angeles LUMA Foundation Mulberry Office for Contemporary Art Norway Petzel Gallery, New York Carlos, Francesca and Joel Pinto Galerie Eva Presenhuber, Zurich and New York Frances Reynolds Ruth and Richard Rogers Ringier Collection, Switzerland Marco Rossi - Torino Royal Norwegian Embassy in London Fundación Almine y Bernard Ruiz - Picasso para el Arte Melanie and Michael Sherwood Sotheby's Julia Stoschek Foundation e.V. Düsseldorf Laura and Barry Townsley Victoria Miro Gallery Vionnet Morten Viskum Collection YouTube David Zwirner
allow students from across key
stage 3 or individual year
groups to work in teams to create and deliver the
Project, by allocating areas of the school, aspects of recycling, or functions (e.g. research, promotion, monitoring) to each
group.
Five protesters face charges after a
group of people
staged a noisy disruption at Vancouver hearings into the Northern Gateway pipeline
project.
Through ceremony, the
group asked permission from the Creator and Holy Nations before implementing its five -
stage plan, which began with construction of the Rosebud
project and aims to expand to 150 megawatts (MW) each of wind power on 20 reservations.
From an early
stage, the Association of Polar Early Career Scientists (APECS) has been a key ECR partner of WCRP, particularly of its Core -
Project on Climate and Cryosphere (CliC), connecting active
groups of early career scientists with WCRP.
Working
Group on Baseline for CDM / JI
Project, 2001: Technical Procedures for CDM / JI
Projects at the Planning
Stage, Interim Report to Ministry of the Environment, Government of Japan, Tokyo, Ministry of the Environment, pp. 70.
Groups like the Global CO2 Initiative have
projected that the market for CO2 utilization will be worth billions of dollars in the near future, and investors, including Evok Innovations, have begun to fund early -
stage companies in this space.
The
group has already raised # 239,600 in contributions and / or pledges — but they are pushing hard because about half are still pledges at this
stage, and they need # 245,000 in actual funds by May 9th to complete the
project on time.
If China completes all of the coal - fired
projects that are currently in the works or in the planning
stage, the country would blow through its carbon budget for limiting global warming to two degrees Celsius by 2036, the
group added.
Lauren Bates has been meeting with
groups with an interest in our
project on developing a coherent approach to the law as it affects persons with disabilities, but at a different
stage of that
project, compared to Mark's consultations on the POA.
As one of the leading
groups of construction and engineering lawyers our highly experienced specialist lawyers can advise you on every
stage of your
project from inception and choice of procurement, through the tender process, complex contractual negotiations, contract management, dispute avoidance and (if necessary) formal dispute resolution.
Represented the IFC, the African Development Bank
Group, export credit agencies and commercial lenders on the Bujagali Hydropower
Project in Uganda, lead lawyer for the financing
stage of the transaction
In April 2016 Keza announced the closure of the
project, which was at the
stage of beta testing, despite the initial funding of $ 357,000 from Boost VC and Digital Currency
Group.
• Coordinated effort between Development, QA, Production, DR, System, DBA, Production - support, Network Administration, Applications
group and vendors for project completion ahead of schedule under budget • Incorporated new technologies with legacy systems to improve performance and reduce cost • Experienced in incorporating leading open source tools: nagios, mysql, tomcat, apache, wikis, etc. • Performed broad range of UNIX Systems, Net - Working and SAN Administration tasks for large financial and networking clients such as HSBC Bank USA, Deutsche Bank, Citi Group, ISO.com, GE Corporate Treasury, Globeop Financial Services, LLC., Sothebys.com, Church Pension Group, and Verizon Partners Solutions • Provided project leadership for managing technical resources, client / server issues, vendors, senior management reviews and hands - on technical expertise • Designed and deployed iPlanet Web / Directory server Architecture for the purpose of authentication and Widows 2000 active Directory compatibility • Prepared estimates and diagrams for the new secured Development Environment comprised of Cisco routers, local directors, hubs, Sun servers, firewalls for deployment, staging and production • Developed one to one disaster recovery using Bourne Shell scripting for Reuters» Kondor 3.0 on Solaris 8 • Minimized website down time through careful monitoring of Sotheby's Web Vision to Amazon by using FTP servers to manage high volume uploads which optimized online trading functionalities • Directed installation, configuration, and security of multiple online global auction sites • Automated operations, disk space monitoring, and backups using Bourne and Korn Shell scripting • Developed standard operating procedure for IP multi-pathing, Emulex LPFC, HBAs, EMC Power path, Navisphere, and installed JASS on new built se
group and vendors for
project completion ahead of schedule under budget • Incorporated new technologies with legacy systems to improve performance and reduce cost • Experienced in incorporating leading open source tools: nagios, mysql, tomcat, apache, wikis, etc. • Performed broad range of UNIX Systems, Net - Working and SAN Administration tasks for large financial and networking clients such as HSBC Bank USA, Deutsche Bank, Citi
Group, ISO.com, GE Corporate Treasury, Globeop Financial Services, LLC., Sothebys.com, Church Pension Group, and Verizon Partners Solutions • Provided project leadership for managing technical resources, client / server issues, vendors, senior management reviews and hands - on technical expertise • Designed and deployed iPlanet Web / Directory server Architecture for the purpose of authentication and Widows 2000 active Directory compatibility • Prepared estimates and diagrams for the new secured Development Environment comprised of Cisco routers, local directors, hubs, Sun servers, firewalls for deployment, staging and production • Developed one to one disaster recovery using Bourne Shell scripting for Reuters» Kondor 3.0 on Solaris 8 • Minimized website down time through careful monitoring of Sotheby's Web Vision to Amazon by using FTP servers to manage high volume uploads which optimized online trading functionalities • Directed installation, configuration, and security of multiple online global auction sites • Automated operations, disk space monitoring, and backups using Bourne and Korn Shell scripting • Developed standard operating procedure for IP multi-pathing, Emulex LPFC, HBAs, EMC Power path, Navisphere, and installed JASS on new built se
Group, ISO.com, GE Corporate Treasury, Globeop Financial Services, LLC., Sothebys.com, Church Pension
Group, and Verizon Partners Solutions • Provided project leadership for managing technical resources, client / server issues, vendors, senior management reviews and hands - on technical expertise • Designed and deployed iPlanet Web / Directory server Architecture for the purpose of authentication and Widows 2000 active Directory compatibility • Prepared estimates and diagrams for the new secured Development Environment comprised of Cisco routers, local directors, hubs, Sun servers, firewalls for deployment, staging and production • Developed one to one disaster recovery using Bourne Shell scripting for Reuters» Kondor 3.0 on Solaris 8 • Minimized website down time through careful monitoring of Sotheby's Web Vision to Amazon by using FTP servers to manage high volume uploads which optimized online trading functionalities • Directed installation, configuration, and security of multiple online global auction sites • Automated operations, disk space monitoring, and backups using Bourne and Korn Shell scripting • Developed standard operating procedure for IP multi-pathing, Emulex LPFC, HBAs, EMC Power path, Navisphere, and installed JASS on new built se
Group, and Verizon Partners Solutions • Provided
project leadership for managing technical resources, client / server issues, vendors, senior management reviews and hands - on technical expertise • Designed and deployed iPlanet Web / Directory server Architecture for the purpose of authentication and Widows 2000 active Directory compatibility • Prepared estimates and diagrams for the new secured Development Environment comprised of Cisco routers, local directors, hubs, Sun servers, firewalls for deployment,
staging and production • Developed one to one disaster recovery using Bourne Shell scripting for Reuters» Kondor 3.0 on Solaris 8 • Minimized website down time through careful monitoring of Sotheby's Web Vision to Amazon by using FTP servers to manage high volume uploads which optimized online trading functionalities • Directed installation, configuration, and security of multiple online global auction sites • Automated operations, disk space monitoring, and backups using Bourne and Korn Shell scripting • Developed standard operating procedure for IP multi-pathing, Emulex LPFC, HBAs, EMC Power path, Navisphere, and installed JASS on new built servers
The Fence Friends
Project developed over six months and the
stages included: planning; purchase of materials; creation of working
groups to sand and paint undercoat of images and production of students» individual designs.
Second, a
project funded by the National Institute of Justice compared the effectiveness of a
stages - of - change / motivational interviewing (SOCMI) model of
group therapy with standard batterer treatment for batterers court - ordered to treatment.
In the study design and program development
stage, research team members and consultants, in conjunction with the Administration for Children and Families (ACF), decided upon the type of intervention to be tested and the specific target
groups for the
project.