Sentences with phrase «switch support planned»

That wasn't it for their announcements, however, as they have significant Switch support planned for the future.

Not exact matches

Two Perth - based resources companies are planning to switch sectors with the acquisition of cancer - based biotechnology firms, with one planning a backdoor listing and the other seeking support for an IPO.
Webfaction — I started my little blog with Bluehost but then discovered that I needed a different hosting plan, so with the advice of my tech support, I switched to WebFaction.
Smith discussed plans to convince Chairman 1 to switch his loyalties, and City Councilman Dan Halloran also discussed bribing the chairman to get him to support Smith, prosecutors said.
The promotion of Ms Thornberry is a clear sign Mr Corbyn plans to switch Labour's policy on nuclear weapons to supporting disarmament.
Your personal help and feedback via the support tickets and changes to my plan were extremely valuable to me and totally won me over early on when i needed help and you switched me to reverse dieting.
You can email support (at) holisticsquid.com to switch over to the paleo meal plan.
Konami's plan to support their Nintendo Switch launch title Super Bomberman R begins today with the release of a free content patch.
As expected, after the Nintendo Switch presentation came a lot of questions about the Switch and the 3DS and Reggie said Nintendo would continue to support it, as they have a number of first party games headed to it this year and now Nintendo of America have stepped forwards to divulge some of their 3DS plans:
Rocket League developer Psyonix has shared a new update on the support for the Nintendo Switch version of the game confirming some of the upgrades that they are planning...
In many of Global Action Plan's programmes students deliver «pitch to switch» presentations to their head teacher and other senior staff to encourage them to support their cause; students can be powerful and convincing advocates.
They switched to a block schedule to better support students» plans.
Also, if you're lifestyle becomes better able to support it, you can switch to a different payment plan later.
We don't have any plans to support the Nintendo Switch but if we do, then we'll be sure to announce it and anyone that already answered a survey (Kickstarter only allows sending of one survey per backer, they're weird like that) can just message us if they want to change their preferred platform and I'll put a note on their backer profile (Kickstarter at least allows us that).
With Capcom recently announcing that the plan to increase support for the Nintendo Switch in 2018 and beyond, Kotaku UK has published a piece detailing what these titles could be.
- when the team learned that Switch would support Unity, they began the process of bringing the game over - it was planned early on to get the game onto Switch within a month of it launching - by Fall 2016, Unity's optimization progressed, and error messages that previously appeared with I Am Setsuna stopped - by the end of fall last year, the team was finished with pre-submission to Nintendo - I Am Setuna was the first title to enter this process - a meeting with Unity was suddenly held, and it was decided that I Am Setsuna would end up becoming a launch title - Nintendo asked for the developers to finish the master version that year if possible - the team was able to port quickly due to Unity, as well as the lack of online / vs features & modest hardware requirements - having a good grasp on specs also made work come together quickly - setting various aspects such as the app's icon, languages, etc. was said to be very simple - there was also good compatibility for titles that have / planned to have multi-platform support on home and portable consoles
Suppose it does, it's not clear exactly how Capcom plans to support the Switch.
Nintendo plans to ship two million Nintendo Switch consoles by the end of the fiscal year (ie through March), supporting their plan for a March launch.
Finally, the Wall Street Journal's Takashi Mochizuki asked about the Nintendo Switch version, to which Square Enix responded that support is still planned but they can't say if it will be released on the same date.
Square Enix has said they plan to port and bring as many games as they can to the Switch and they are using Unreal 4 for games like Kingdom Hearts 3 so this could potentially be good news for the Switch in terms of receiving similar AAA game support to Xbox One and PS4.
Currently, there is also a long list of 3rd party support planned for the console with the likes of Activison, Electronic Arts and Square Enix all partnering with Nintendo to create content for the Nintendo Switch.
Some of his suggestions for local planning initiatives include: Preserve wetlands by passing local wetlands protection laws; maintain biodiversity in the Hudson Valley by protecting sensitive lands through land acquisition; refrain from building in flood plains; require all new building to be «green» and sustainable and, ideally, change local building codes to require LEED certification; switch all public and government buildings to energy suppliers that provide wind and solar options as alternatives; implement smart growth communities by keeping construction in areas that are already developed thus preserving green corridors; and support cap - and - trade laws to decrease CO2 levels.
It seems some individuals who don't wish to install the desktop player or switch browsers - riegelstamm included - plan to take their music streaming elsewhere if Spotify doesn't restore Safari support.
That has a global 4G LTE modem, promising carrier support in more than 140 countries and regions, along with Apple SIM to make switching cellular data plans more straightforward.
Tags for this Online Resume: Network Support, Networking, Support, Microsoft Windows, IBM, UTM's administration, Security, Active Directory, Certificate Authority, Citrix, VMware, Exchange Server, Switches administration, VOIP phone systems administration, SAN administration, Managing Backup and Disaster Recovery, Microsoft PowerShell, Manage information systems team of technicians, Budget planning and monitoring, Experience with routing protocols
Tags for this Online Resume: Support, Planning, Cisco, Multiprotocol Label Switching, Audit, Border Gateway Protocol, Ethernet, Gateway, Integrate, Label Distribution Protocol, Juniper, BGP, MPLS, CISCO, CCIE
Tags for this Online Resume: Professional Services, SAN (Storage Area Network), Scheduling, Services, Structured Query Language, Support, Technical Support, Automation, Computer Analyst, Distribution, Infrastructure Planning, Service Recovery, Based Omaha, NE, World - Wide Travel from Omaha, NE, Relationship Management, Client Loyalty, Technical Project Management, Quality Assurance, Process Improvements, Risk Management, Mitigation, System Security, Data Integrity, Information Assurance, Staff Development, Mentoring, Employee Engagement, Cost - Containment, Streamlining Operations, Continuous Quality Improvement, Benchmarking, Emerging Technologies, Management Information Systems, Network Administration, Project Life Cycle, Software Development Life Cycle, Agile, Scrum, Real Time Data, Remote Systems Access, Microsoft Project, Visio, LAN, Networking, Cisco Routers / Switches, wireless, SSIS, Microsoft IIS web applications, SSL certificates, XSLT template Modification, SQL Tracing, Power Shell, Data Warehousing, Team builder
Smartronix (CA & MD) 08/2004 — 12/2008 S6 Information Systems Coordinator • Serve as Section Chief and Contract Lead at the MCNOSC providing overall support for the MCNOSC IT Systems • Manage the network, servers, switches, applications, and information and infrastructure security • Utilize DoD applications for network scanning and remediation of the classified and unclassified networks • Develop plans, procedures, and policies to directly support and defend the MCNOSC Network from security threats • Oversee the MCNOSC's PKI (public key infrastructure) and integration with the MCNOSC services with the coordination of recovery strategies with the Alternate Network Operations and Security Center (AltNOSC) • Determine minimum processing requirements for recovery site and provide guidance for recovering infrastructure processing • Provide technical input to the Contingency of Operations (COOP) Plan ensuring all activities, resources and procedures required to recover critical IT infrastructure processing are accurate • Manage the day to day support of the MCNOSC Infrastructure, supervising a team of IT service contractors • Perform complex repairs, upgrades, hardware configuration, and end user training • Serve as project manager for the transition and deployment of the MCNOSC's NMCI plan • Oversee the planning and build out of the network and MCNOSC's new Headquarters and Operations Center • Coordinate with local contractors to ensure timely delivery of the network • Design and coordinate the build out of the MCNOSC Internal Data Center, Server Room, and Testing Lab • Coordinate the movement to the MCNOSC's newly built Operations Center and Head Quarters • Install cabling, servers, racks, environmental controls, a / v systems, and other technical equipment • Develop the MCNOSC IT Lifecycle management for the LAN and other IT devices • Serve as project manager for the MCCDC (Marine Corps Combat Development Center) Studies and Analysis Division and the MCCLL (Marine Corps Center for Lessons LearPlan ensuring all activities, resources and procedures required to recover critical IT infrastructure processing are accurate • Manage the day to day support of the MCNOSC Infrastructure, supervising a team of IT service contractors • Perform complex repairs, upgrades, hardware configuration, and end user training • Serve as project manager for the transition and deployment of the MCNOSC's NMCI plan • Oversee the planning and build out of the network and MCNOSC's new Headquarters and Operations Center • Coordinate with local contractors to ensure timely delivery of the network • Design and coordinate the build out of the MCNOSC Internal Data Center, Server Room, and Testing Lab • Coordinate the movement to the MCNOSC's newly built Operations Center and Head Quarters • Install cabling, servers, racks, environmental controls, a / v systems, and other technical equipment • Develop the MCNOSC IT Lifecycle management for the LAN and other IT devices • Serve as project manager for the MCCDC (Marine Corps Combat Development Center) Studies and Analysis Division and the MCCLL (Marine Corps Center for Lessons Learplan • Oversee the planning and build out of the network and MCNOSC's new Headquarters and Operations Center • Coordinate with local contractors to ensure timely delivery of the network • Design and coordinate the build out of the MCNOSC Internal Data Center, Server Room, and Testing Lab • Coordinate the movement to the MCNOSC's newly built Operations Center and Head Quarters • Install cabling, servers, racks, environmental controls, a / v systems, and other technical equipment • Develop the MCNOSC IT Lifecycle management for the LAN and other IT devices • Serve as project manager for the MCCDC (Marine Corps Combat Development Center) Studies and Analysis Division and the MCCLL (Marine Corps Center for Lessons Learned)
Regional IT Manager • Manage HQ infrastructure team and Asia information technology team, leading 11 staff in the servicing of over 800 users and 9 offices with responsibility for global infrastructure architecture and global network and focus groups • Drive global standardization firm - wide within networks, storage, backup, servers, computers and other critical hardware • Utilize cross-regional focus groups to connect functional experts between sites, establishing roadmaps, creating annual project plans and delivering global projects • Define incident management and change management processes, working with application teams for full implementation • Create datacenter in ShenZhen technology center to support ASIC team, software team, firmware team, hardware team and sales and FAE teams • Manage high volume of acquisitions and IT integrations on a global scale, including the CSR integration preparation (2011), the Microtune integration (2010), the Letitwave integration in France (2008) and the Emblaze Semiconductor in Israel (2004) • Supervise and lead numerous technology refresh projects including the global Exchange 2010 upgrade, the global MPLS network upgrade, the network switch upgrade, a global firewall project and internet bandwidth upgrade • Execute critical operations functions and projects including global wireless technology management, network monitoring, the global SSL VPN project, the management of Microsoft licenses and the e-mail gateway • Support critical business continuity tasks, including the development of a low - cost Oracle ERP system DR solution, server virtualization, E-mail DR and Perforce DR • Lead cost - saving and expense management endeavors including the build - up of a Quintum VoIP gateway globally to utilize traditional PBX gateway and the build - up of near - line archive storage with de-duplication techsupport ASIC team, software team, firmware team, hardware team and sales and FAE teams • Manage high volume of acquisitions and IT integrations on a global scale, including the CSR integration preparation (2011), the Microtune integration (2010), the Letitwave integration in France (2008) and the Emblaze Semiconductor in Israel (2004) • Supervise and lead numerous technology refresh projects including the global Exchange 2010 upgrade, the global MPLS network upgrade, the network switch upgrade, a global firewall project and internet bandwidth upgrade • Execute critical operations functions and projects including global wireless technology management, network monitoring, the global SSL VPN project, the management of Microsoft licenses and the e-mail gateway • Support critical business continuity tasks, including the development of a low - cost Oracle ERP system DR solution, server virtualization, E-mail DR and Perforce DR • Lead cost - saving and expense management endeavors including the build - up of a Quintum VoIP gateway globally to utilize traditional PBX gateway and the build - up of near - line archive storage with de-duplication techSupport critical business continuity tasks, including the development of a low - cost Oracle ERP system DR solution, server virtualization, E-mail DR and Perforce DR • Lead cost - saving and expense management endeavors including the build - up of a Quintum VoIP gateway globally to utilize traditional PBX gateway and the build - up of near - line archive storage with de-duplication technologic
Globeop Financial Services, LLC (Harrison, NY) 2005 — 2007 Manager Enterprise Infrastructures Group • Designed and implemented disaster recovery system for Reuiter's Kondor 3.0 on Solaris 10 and Sybase 12.0 — 15.0 • Installed, configured, and managed Reuiter's Kondor 3.0; Solaris 10 (LDOMS, ZFS, RAID, ZOANS, CONTAINERS); AIX 4.3 - 5.3, Red Hat Enterprise — RHEL 3.0 — 4.0, Sybase 12.0 — 15.0, Oracle 10g, MYSQL 2.7.1, Sun One Directory Server (LDAP), SUN IDM, Solstice Disk Suite, Sun Cluster 3.0 - 3.2, Veritas Storage Foundation 4.1 — 5.0, Veritas Cluster Server, Veritas NetBackup 5.0 — 7.0, Storage Array A1000 — A3500, EMC SAN, HITACHI SAN, 3 PAR, Brocade switch 40K, Cisco switch 6309, SSH, SSL, RSA encryption, Emulex LPFC, NaviSphere, EMC, and Power path • Automated processes utilizing shell scripts (Bourne, Korn, C Shell, Bash, AWK, SED and Perl) • Strong technical expertise in all major server technologies (SUN / HP / IBM / Linux / Microsoft) experiment in managing mission critical, low latency, high availability and clustered IT systems and familiar with FIX protocol • Performed massive installation of Solaris servers using both Jumpstart and Blade Logic and Red Hat using both PXE boot and BladeLogic servers to global distributed network of more than 2500 servers • Conducted disaster recovery tests • Managed and supervised four technicians ensuring continuity of service and efficient operations • Coordinated effort among Development, System, Networking, Application Support, Backup and recovery team to ensure maximum up time and effective issue resolution • Planned & developed projects, performed user acceptance tests, and applied patches to repair bugs • Developed shell scripts for Bourne shell, Korn shell, C Shell, AWK, PL / SQL and PERL • Managed DNS, NIS, NIS +, LDAP, jump start, Send Mail, SFTP, FTP, HTTP, SSL, SSH, Telnet and HP Open View • Coordinated effort between Development, QA, Production, DR, Systems, DBA, Production Support and Network Administration, Applications group for project completion ahead of time and under budget • Managed DNS, NIS, NIS +, DHCP, LDAP, SFTP, jumpstart, Apache, Tomcat, Websphrer and HP Open View.
a b c d e f g h i j k l m n o p q r s t u v w x y z