Sentences with phrase «use this project administrator»

Use this Project Administrator job description template as part of your hiring process to attract qualified candidates for your open positions.

Not exact matches

Both schools use Project Re-ED's «Re-Education» principles, developed by renowned psychologist, educator and university administrator Nicholas Hobbs, as the basis for their methods of reaching out to students.
Patterson, and administrators Kendall Parrott and Linda Hudson, admitted to using Park District credit cards and other accounting tricks to pay for shopping trips, home improvement projects and other personal expenses.
The letter, addressed to EPA Region 2 Administrator Judith Enck, comes as the state seeks to use money from a fund that has been in the past used to pay for water and sewer improvement projects.
On Thursday, FHWA Acting Administrator Brandye Hendrickson sent a letter to DOT Acting Commissioner Paul A. Karas and New York State Thruway Authority Acting Executive Director Matthew J. Driscoll, notifying them that the federal government would be withholding an estimated $ 14 million from the nearly $ 1 billion it provides New York each year for use on such projects as bridge and highway improvements.
Project 2061 surveyed principals from Green Ribbon Schools to learn more about their use of energy data — one of many times Project 2061 involved feedback from educators and administrators in the development of the curriculum outline.
He has organized several projects on research integrity and scientific misconduct, including more than a dozen workshops for university administrators, bench scientists, post-docs and graduate students and the production of a series of case studies on video for educational use.
Edward Krug, Ph.D., Volunteer Advisor and past Project Director, NSF grant Dr. Krug is both an educator and basic science researcher using emerging analytical technologies to study early heart development and the administrator overseeing postdoctoral policies at Medical University of South Carolina (MUSC).
In these case studies of four high schools implementing multidisciplinary demonstration projects, self - reports, surveys, and interviews of students, faculty, and administrators were used to identify successful implementation practices and obstacles.
Museum administrators also plan to use the school's model to bring in more visitors and let them touch and learn about their collections, and the city is about to launch one of the largest river - revitalization projects ever undertaken in the namesake Grand River.
Industry: Elearning Company size: 51 - 200 Level: CXO Focus: Program and Project Management Experience using the software: More than 1 year as User, Administrator, Member of the deployment / customization team, Member of the procurement team
Industry: Information Technology and Services Company size: 1,001 - 5,000 Level: Senior Focus: Program and Project Management Experience using the software: More than 1 year as User, Administrator, Member of the deployment / customization team, Member of the procurement team
Industry: Elearning Company size: 1 - 10 Level: Manager Focus: Program and Project Management Experience using the software: More than 1 year as Administrator, Member of the deployment / customization team, Member of the procurement team
«In the 21,000 - student Syracuse city school system in New York, which was recently accepted into the Strategic Data Project for this school year, administrators hope to use data uncovered by Harvard researchers to gather information on key performance indicators.»
Industry: Machinery Company size: 51 - 200 Level: Manager Focus: Program and Project Management Experience using the software: More than 1 year as Administrator
«Conclusive evidence has shown the benefits of class sizes of 1:15, especially in the primary grades,» says Charles M. Achilles, a professor of educational administration at Eastern Michigan University, in Small Classes, Big Possibilities, an article he penned for The School Administrator: «Since the early, 1980s, a large - scale project in Indiana, a major experiment in Tennessee, numerous smaller studies and evaluations of projects that use low adult - to - student ratios have found that youngsters in small classes (1:15 or so) as compared to youngsters in larger classes
Industry: Health, Wellness and Fitness Company size: 5,001 - 10,000 Level: Manager Focus: Program and Project Management Experience using the software: More than 1 year as User, Administrator
By using a web - based project management system, an administrator or principal of a school can better collaborate with teachers over education - related matters without the need to physically meet them.
Technology Integration, Projects Mark Top Administrators Work Two administrators named the 2009 Outstanding Young Educators by ASCD are successfully using data, technology, project - based learning, and parent involvement to help transform their schools and inspire their students and teachers.
Industry: Education - Higher Company size: 1 - 10 Level: Manager Focus: Program and Project Management Experience using the software: 6 - 12 months as Administrator, Member of the deployment / customization team
Industry: Information Technology and Services Company size: 1,001 - 5,000 Level: Manager Focus: Program and Project Management Experience using the software: 6 - 12 months as Administrator
Over three years, the Best Foot Forward project researchers, led by Professor Thomas Kane, surveyed hundreds of teachers and administrators and thousands of students on the use of video in the classroom.
RFK Project SEATBELT inspires young people to find that courage and gives teachers, administrators, and parents tools they can use to help.»
In this workshop, a collaborative effort of the National Literacy Project (NLP), Seminole County (FL) Public Schools, and the National Literacy Design Collaborative (LDC), teachers, district and school administrators, and instructional coaches learned to use the LDC Framework to help students meet career - and college - readiness standards.
In addition, to provide support in critical areas, the project also developed a series of web - based tools and resources teachers and administrators could use to support their implementation of Science IDEAS.
For the project described in this paper, the decision to use lesson study as a professional development model was agreed upon during discussions with teacher and administrator representatives.
The DLR Group architectural firm uses a software program to help schools create an extensive database so administrators can anticipate and prepare financially for when repair and construction projects will be necessary.
Project Tomorrow's Speak Up survey, 1 which polled more than 300,000 students, parents, and administrators about 21st - century skills and technology use in school, found that students are increasingly discontented with rules that limit their access to technology at school and prohibit them from using the tools and devices they use outside school, such as cell phones, e-mail, and text messaging.
We worked with the Illinois State Action for Educational Leadership Project at Illinois State University to provide training in the use of our Leadership Performance Planning Worksheet tool for mentoring program directors, university faculty, and state administrators.
The Alaska Staff Development Network has used our Online Coaching Modules to provide professional development and resources for coaches who support principals statewide as part of the Alaska Administrator Coaching Project.
Election - to - Work agreements have been used in a variety of school districts around the nation, including in New Haven, to promote pilot projects that lengthen the school day or year or outline duties and obligations that administrators and teachers have beyond those in the standard contract.
The California Department of Education is offering a free training session in San Diego County for educators to learn strategies for using the new Charter Schools Best Practices Project, a new initiative to strengthen charter schools across the state by providing teachers and administrators access to hundreds of online resources to aid their work.
The interview and artifactual data used for this study were gathered from teachers and administrators in four «demonstration» districts that were involved in a standards - based professional development initiative within the MELAF project.
The California Department of Education is offering a free training session in Los Angeles County for educators to learn strategies for using the new Charter Schools Best Practices Project, a new initiative to strengthen charter schools across the state by providing teachers and administrators access to hundreds of online resources to aid their work.
In five years, the project trained and coached more than 300 teachers and administrators to use the strategies that can assist schools in beginning the difficult process of total restructuring.
ST. LOUIS, Mo. — Deputy Federal Transit Administrator Therese McMillan today joined Missouri and Illinois officials to kick off the Eads Bridge Rehabilitation Project, which will repair and restore the historic, 138 - year old bridge and ensure safe and efficient light rail service for thousands of people who use the bridge to cross the Mississippi River every day.
They warn pension administrators to avoid using past returns to project future pension returns.
Requires the EPA Administrator to establish an Independent Offsets Integrity Advisory Board to make recommendations to the EPA Administrator for use in promulgating and revising regulations on the types of offset that should be eligible for compliance purposes and on methodologies for evaluating offset projects.
«If the Administrator lists forestry or other relevant land management - related offset projects as eligible offset project types under section 733, the Administrator, in consultation with appropriate Federal agencies, shall promulgate regulations for the selection and use of species in such offset projects --
Directs the Administrator to: (1) establish a carbon dioxide allowance trading program; (2) promulgate regulations relating to offsets produced by agricultural sequestration practices; (3) establish a reserve of carbon dioxide allowances to be allocated to new affected units and to a clean coal technology reserve; and (4) allocate a specified amount of carbon dioxide allowances to certain units; and (5) promulgate regulations that provide for the issuance, certification, and use of offset allowances (and early reduction allowances) for greenhouse gas reduction or sequestration projects.
Also it was reported that the European Central Bank (ECB) want to impose tighter controls on the exchange of virtual currencies; A group of banks in Hong Kong are developing a system that uses blockchain tech to share information about mortgage valuations; In a new SEC filing, State Street is now listed as the administrator and transfer agent for the Winklevoss Bitcoin Trust, a proposed bitcoin ETF; India's biggest IT services firm Tata IT is working on over 100 blockchain projects — these articles and many more on our Facebook page.
Acted as process improvement program administrator and facilitated projects using Zip, the citywide process improvement methodology, to promote efficiency, increase revenue and reduce costs.
CONTRACT ADMINISTRATOR / COORDINATOR: Set - up job folders, forms and files with details / project... Computer experience and the ability to use Microsoft Office suite.
Steve Busby Network / Administrator / Electrical Engineer 802 Bella Vida Blvd. Orlando, Florida [email protected] 321.917.7249 407.207.1757 PROFESSIONAL SUMMARY: • Provide Documentation, Instructions, Drawings, Customer Oversight and Configs; built Templates for Routers / Switches / Firewalls, Parts List and Project Schedule using VISIO, Maximo, MS Project, Excel, Access, Power Point and Word.
SUMMARY OF EXPERIENCE As a Senior Project Manager and an Architectural Contract Administrator, Robert Duncan has the reputation of successfully completing various projects using the following criteria and procedures: * Managing various and multiple multi-million dollar construction projects and contracts from start to completion, using successful tracking of records, development of strong and functional relationships betwee...
PROFESSIONAL SUMMARY * Over 7 + years of IT Experience as an oracle database administrator, participating in System Analysis, Designing, Testing Development & Support of Oracle 9i, 10g, 11g and 12c in Production, Staging, and Development environments * Prepared documentation of projects for Functional Requirement Spec (FRS), Use case Spec, ER - Diagram, test plan, test scripts and test Cases.
Electronic Data Systems, Advanced System Engineer (Denver, CO) 11/1985 — 3/1999 • Implement computer database engineering objectives for a data processing administrator • Install Vantive and Oracle databases for clients • Manage system tests, Oracle 7.3.4 / Sybase 4.9.2 database administration, import / exports, Oracle PL / SQL scripts • Serve as assistant Oracle database administrator for CLMS team • Develop Visual Basic / GUI applications and C batch programs in Vantive • Perform team leadership role in construction phase of COBOL II project • Create request for proposal document and high - level requirements • Develop technical lead of General Motors Fleet Volume using IMS / DB2 / TELON / COBOL II, system test, UAT and implementation • Develop IMS / DB2 / PL1 on - line system, coordinate system test and UAT, and serve as technical leader of Experimental System
City Group (New York, NY) 1995 — 1997 Consultant — Unix Administrator • Senior System Administrator in for Solaris and Aix environment and application development area • Systems included Sun Ultra Enterprise 450, 420R, 4500, and 6500 running on Solaris 2.5.1, 2.6 and Aix 4.3.2 • Development environment composed of mostly Sun equipment including Sun StorEdge A5200, A5100, D1000 arrays using Veritas and SDS volume managers • Backed up systems with Legato Networker using BoxHill, Qualstar, and Sun StorEdge L9 tape stackers • Utilized Jrun, WebSphere, WebLogic, Actuate Report Server, iPlanet, and Netscape Enterprise • Senior Unix SA solely responsible for the application development area supporting Solaris, Aix and Linux platform • Performed massive installation of Solaris servers using Jumpstart to global distributed network • Installed new and trial software, maintained server stability, backed up system using Legato Networker, debugged system problems such as network connectivity, and packaged developers» software released to production • Project work involved getting specification from users, recommending appropriate system, submitting purchase order to purchasing, ensuring arrival of new system, building the system to Sotheby's standard, and installing necessary software for the user • Built and configured IBM and Sun servers installing Aix 4.0 and Solar 2.5 - 2.6 operating system and Oracle 7 • Performed backup and Recovery using ADSM and Tape backup • Automated disk monitoring and routine tasks utilizing Bourne Shell scripting and cronjobs • Served as liaison between vendors on resolving hardware and software issues • Monitored servers using Tivoli Storage Software • Trained and mentored Junior systems Administrators and operators
IT Project Manager — Professional Highlights Serve multinational corporations in a variety of technology based strategic planning and administration roles Offer expertise as a consultant, programmer, engineer, business analyst, and database administrator Lead technology projects for NASA, U.S. Customs, American Express, and General Electric Design and implement reporting, customer service, marketing, sales, and financial management software Responsible for network and database design, administration, and security Oversee enterprise - wide hardware and software upgrades resulting in increased efficiency Minimize operational and manpower costs through effective technology solutions Serve as forecast budget analyst for Joint Project Management Operations at Kennedy Space Center Develop reporting application tool using crystal reports engine on CD throughout Kennedy Space Center and Cape Canaveral Air Station resulting in $ 500,000 savings on user licensing fees Create detailed project plan with well - defined tasks, milestones, client sign - offs, test cycles, and specifications which served to communicate project progress to management Develop visual basic application for financial banking Institution using crystal reports to reduce the company's response time resulting in initial reporting from 2 - 3 hours to just 45 seconds Oversee multimillion - dollar software implementation for Miami Air from a consultancy level Upgrade Great Plains software platform and administered security access for Miami internal databases Write over 200 SQL stored procedures from access databases for financial institutions Compose business correspondence and prepared statistical spreadsheet analysis for Kennedy Space Center Recognized by colleagues and superiors for outstanding job performance, reliability, and efficiency Conduct surveys of operations to assess needs and identify high priority improvements Complete major product releases meeting very aggressive schedules and budgets Serve as a member of the International Cyber Threat Task Force Utilize fluencies in English, Portuguese, Arabic, French, and German to communicate with a diverse clientele Continually study emerging technologies and industry best practices Perform all duties with positivity, professionalism, and inProject Manager — Professional Highlights Serve multinational corporations in a variety of technology based strategic planning and administration roles Offer expertise as a consultant, programmer, engineer, business analyst, and database administrator Lead technology projects for NASA, U.S. Customs, American Express, and General Electric Design and implement reporting, customer service, marketing, sales, and financial management software Responsible for network and database design, administration, and security Oversee enterprise - wide hardware and software upgrades resulting in increased efficiency Minimize operational and manpower costs through effective technology solutions Serve as forecast budget analyst for Joint Project Management Operations at Kennedy Space Center Develop reporting application tool using crystal reports engine on CD throughout Kennedy Space Center and Cape Canaveral Air Station resulting in $ 500,000 savings on user licensing fees Create detailed project plan with well - defined tasks, milestones, client sign - offs, test cycles, and specifications which served to communicate project progress to management Develop visual basic application for financial banking Institution using crystal reports to reduce the company's response time resulting in initial reporting from 2 - 3 hours to just 45 seconds Oversee multimillion - dollar software implementation for Miami Air from a consultancy level Upgrade Great Plains software platform and administered security access for Miami internal databases Write over 200 SQL stored procedures from access databases for financial institutions Compose business correspondence and prepared statistical spreadsheet analysis for Kennedy Space Center Recognized by colleagues and superiors for outstanding job performance, reliability, and efficiency Conduct surveys of operations to assess needs and identify high priority improvements Complete major product releases meeting very aggressive schedules and budgets Serve as a member of the International Cyber Threat Task Force Utilize fluencies in English, Portuguese, Arabic, French, and German to communicate with a diverse clientele Continually study emerging technologies and industry best practices Perform all duties with positivity, professionalism, and inProject Management Operations at Kennedy Space Center Develop reporting application tool using crystal reports engine on CD throughout Kennedy Space Center and Cape Canaveral Air Station resulting in $ 500,000 savings on user licensing fees Create detailed project plan with well - defined tasks, milestones, client sign - offs, test cycles, and specifications which served to communicate project progress to management Develop visual basic application for financial banking Institution using crystal reports to reduce the company's response time resulting in initial reporting from 2 - 3 hours to just 45 seconds Oversee multimillion - dollar software implementation for Miami Air from a consultancy level Upgrade Great Plains software platform and administered security access for Miami internal databases Write over 200 SQL stored procedures from access databases for financial institutions Compose business correspondence and prepared statistical spreadsheet analysis for Kennedy Space Center Recognized by colleagues and superiors for outstanding job performance, reliability, and efficiency Conduct surveys of operations to assess needs and identify high priority improvements Complete major product releases meeting very aggressive schedules and budgets Serve as a member of the International Cyber Threat Task Force Utilize fluencies in English, Portuguese, Arabic, French, and German to communicate with a diverse clientele Continually study emerging technologies and industry best practices Perform all duties with positivity, professionalism, and inproject plan with well - defined tasks, milestones, client sign - offs, test cycles, and specifications which served to communicate project progress to management Develop visual basic application for financial banking Institution using crystal reports to reduce the company's response time resulting in initial reporting from 2 - 3 hours to just 45 seconds Oversee multimillion - dollar software implementation for Miami Air from a consultancy level Upgrade Great Plains software platform and administered security access for Miami internal databases Write over 200 SQL stored procedures from access databases for financial institutions Compose business correspondence and prepared statistical spreadsheet analysis for Kennedy Space Center Recognized by colleagues and superiors for outstanding job performance, reliability, and efficiency Conduct surveys of operations to assess needs and identify high priority improvements Complete major product releases meeting very aggressive schedules and budgets Serve as a member of the International Cyber Threat Task Force Utilize fluencies in English, Portuguese, Arabic, French, and German to communicate with a diverse clientele Continually study emerging technologies and industry best practices Perform all duties with positivity, professionalism, and inproject progress to management Develop visual basic application for financial banking Institution using crystal reports to reduce the company's response time resulting in initial reporting from 2 - 3 hours to just 45 seconds Oversee multimillion - dollar software implementation for Miami Air from a consultancy level Upgrade Great Plains software platform and administered security access for Miami internal databases Write over 200 SQL stored procedures from access databases for financial institutions Compose business correspondence and prepared statistical spreadsheet analysis for Kennedy Space Center Recognized by colleagues and superiors for outstanding job performance, reliability, and efficiency Conduct surveys of operations to assess needs and identify high priority improvements Complete major product releases meeting very aggressive schedules and budgets Serve as a member of the International Cyber Threat Task Force Utilize fluencies in English, Portuguese, Arabic, French, and German to communicate with a diverse clientele Continually study emerging technologies and industry best practices Perform all duties with positivity, professionalism, and integrity
The project was intended to gain insight into the issue of over-representation (or racial disproportionality) from the perspective of the child welfare community, including agency administrators, supervisors, and direct service workers, and to describe the strategies child welfare and child - welfare serving agencies use to meet the needs of children and families of color in the child welfare system.
a b c d e f g h i j k l m n o p q r s t u v w x y z