NDR German public television reported on the damaged Adwen M5000 turbine at the 60MW Alpha
Ventus offshore North Sea wind farm off the northern coast of Germany.
The failure of retaining bolts led to a nacelle casing falling off an Adwen M5000 turbine at the 60MW Alpha
Ventus offshore wind farm in the German North Sea, according to the project's co-operator EWE.
Tomorrow, slipped quietly in an off election, Mainers get to vote on the $ 50 million dollar bond to be used to help fund the Aqua
Ventus offshore wind project.
German television has broadcast images of the damaged Adwen M5000 turbine at the 60MW Alpha
Ventus offshore wind farm in the German North Sea.
The annual yield of the 60MW Alpha
Ventus offshore wind farm exceeded expectations in 2012 by 15.3 %, pumping 267.8 GWh of power into the German grid.
Not exact matches
Nevertheless, the reliable power yield generated by Alpha
Ventus shows that power generation from
offshore wind farms is on the right way.
There are 15 operational floating foundation
offshore wind demonstration projects, but only the 6 MW Aqua
Ventus project being tested by the University of Maine is in U.S. waters, DOE reported.
Dutch outfit C -
Ventus Offshore Wind Services has won a four - year contract from Innogy to carry out subsea works at the 295MW Nordsee Ost
offshore wind farm in the German North Sea.
Even in the fledgling US
offshore area, a maiden floating project, the 12MW Aqua
Ventus, off Maine, is inching ahead.
The operator of the 60MW German
offshore wind test field Alpha
Ventus is preparing to exchange the nacelle of an Adwen AD 5 - 116 turbine, part of which for still unknown reasons fell into the North Sea in early April.