Not exact matches
That store opening schedule translates into about $ 150 million of
additional retail
capacity (circa $ 80 million on a food - only basis) in each market — we allocate 50
per cent of that impact (higher than market share) to IGA retail.»
When an organization uses its Google Grant at full
capacity (spends its entire grant) for two months, it is eligible to apply for Google Grantspro, which is an
additional $ 30,000
per month of AdWords.
Global estimates for 2020 show a projected 400 to 600
additional gigawatts of PV
capacity as the costs of PV energy are expected to drop by almost 10 percent
per year.
Mr Stokes told The Educator increasing schools»
capacity to accomodate students would be a priority, as the state's population is expected to grow by 28
per cent over the next 20 years, with an
additional 164,000 public school students in NSW by 2031.
An
additional shift will help facilitate production of these new vehicles at the Sunderland plant, which will have its
capacity expanded to 550,000 units
per year.
Per the IRS, the credit is equal to $ 2,500 plus an
additional $ 417 for each kilowatt hour of battery
capacity in excess of 5 kilowatt hours.
Automobili Lamborghini SpA now has
additional quality checks during the production of the Huracán in Sant «Agata to make sure she adheres to the strict tolerances required, in fact the assembly of this new V10 model is a lot more efficient compared to the Gallardo production... once the assembly line is fully operational a total of 13 Huracán
per day can be built... with over 700 orders of this car in one month I'm sure the entire
capacity will be required to keep up with demand.
The slate sports a 7.9 - inch IPS display with a resolution of 2048 x 1536 at a pixel density of 326 pixels
per inch (ppi) and comes with either 16 GB or 64 GB of internal storage
capacity, a microSD card slot for
additional memory of up to 128 GB, an 8 - megapixel rear camera, as well as a 5 - megapixel front shooter.
In total, the new routes and
additional flights represent the addition of over 65,000 extra seats, taking the total number of seats on sale from London Stansted to over 875,000 - a
capacity increase of eight
per cent.
Additional guests beyond room
capacity will incur a fee of $ 25
per person
per night.
The growth has been driven by new routes and increased
capacity to a very wide range of destinations, including the new route to Beijing with Hainan Airlines, one
additional Emirates Airbus A380
per day flying to Dubai with Emirates, replacing a smaller Boeing 777 operation, coupled with increased
capacity being filled on short haul routes to Spain (37.5
per cent more passengers year on year), France (up 28.5
per cent), Italy (up 30.1
per cent) and Poland (up 63.6
per cent).
This, together with service enhancements introduced earlier this year, will bring more than 1,200
additional train trips
per week to the whole network, increasing passenger carrying
capacity by about 3 million weekly passenger journeys.
At Stansted, a near eight
per cent drop in seats offered produced a similar drop of 7.2
per cent in passengers, while in Scotland
additional capacity helped to produce an overall increase of 6.6
per cent in passengers travelling to and from Europe.
Additional guests over double occupancy adds $ 15
per guest,
per night up to the cottage or room
capacity.
Triple occupancy: same rate
per person as in double occupancy; maximum one
additional bed
per cabana, limited
capacity.
The
additional aircraft takes yearly
capacity on Wizz's low - fare routes from London Luton to 7.4 million seats, representing 23
per cent growth year - on - year.
TransCanada Corporation, on behalf of the Keystone Pipeline partnerships (Keystone) between TransCanada and ConocoPhillips, plans to expand the still - to - be-completed Keystone crude oil pipeline system project (earlier post) to provide
additional capacity of 500,000 barrels
per day... Read more →
The reduction in emissions of carbon dioxide
per new unit of non-hydro «renewable»
capacity falls off rapidly as
additional «renewable»
capacity is added to an electric grid because
additional fossil fuel sources must be kept in «spinning reserve» in case the wind dies or the sun goes under a cloud unless hydro is available.
In some cases, the Conergy operations and maintenance service has overachieved the plant's performance ratio, yielding
additional revenues of over 230 thousand pesos
per installed megawatt
capacity annually.
The current rate of addition of
capacity for solar and wind combined amounts to
additional generation 25.7 TW / h
per year.
Block size (Daily transaction
capacity): 8 MB currently, scalable to 32 MB without
additional forks (2,000,000 to 8,000,000 transactions
per day.
This production line currently has the
capacity to make an
additional 60,000 units of 6th Gen OLED panels
per month, but lack of orders from Apple and Chinese handset makers could delay production at this line for up to 6 months.