Sentences with phrase «after building and construction»

Not exact matches

But after crunching some Department of Energy data, Surace estimates that the construction and operation of buildings — heating; cooling; lighting; the manufacture of cement, drywall, and glass — produce 52 percent of global greenhouse gas emissions.
Belmont - based property developer and construction company Diploma Group plans to build a $ 35 million, nine - storey residential apartment building in Scarborough, after buying two adjoining blocks of land along West Coast Highway.
After the U.S. elections, prices for copper and iron ore, used in building and construction projects, surged amid hopes for increased infrastructure spending.
It ended up as that city's second - highest, after Willis Tower, and in a flashback to his old ways he personally guaranteed $ 40 million on a Deutsche Bank construction loan to build it.
Two years after the Berlin games, however, when the Nazis were building the German embassy in Washington D.C., they awarded the construction contract to Avery Brundage; and Brundage later became a leader of the America First Committee, which contained many sympathizers for Hitler's Germany.
A building might be necessary in some extreme cases, but construction should commence only after careful consideration of the missional and theological ramifications.
The construction of the shoe is built for speed and it stiffened up a bit after several slower miles, leaving my foot a bit sore afterwards.
The Argentinian left Bilbao in 2013 after his contract was not extended by the club following disputes with the board and a physical confrontation with one of the construction crew building the new San Mames stadium next door to the club's old ground.
ROCKAWAY PARK — The head of the failed city - run Build It Back program should be fired or resign after the controversial rebuilding debacle proved to be a «boondoggle» of bureaucratic red tape and poor construction work, a local elected official said.
Construction began in 1909 on the first three buildings: Draper, Husted and Hawley halls, after the previous location on Willett Street burned down.
Among the questions: what is working, and not working, in the Build it Back program, the mayor's reaction to a report that a family he visited in the Arverne section of Rockaway is «getting close» to losing faith in the mayor, the scope / number of people still directly affected by Sandy, whether his weekend trip to Pennsylvania involved a meeting with the consultants running the Build it Back program, whether he stands by statements he made during a September visit to Far Rockaway's St. Mary Star of the Sea, whether the Bloomberg administration allocated enough money to housing from the first tranch of federal assistance, whether he agrees with Oddo's idea of acquiring land for redevelopment, the role of Michael DeLoach in Build it Back, whether New Yorkers should be concerned that they may lose desirable options under Build it Back after de Blasio completes his review and issues on elevation of existing structures v. new construction.
For deciding to no longer build its Headquarters particularly after all the pre construction activities were completed and competing contractors had submitted their bids, GNPC stands to attract claims from different companies whose services have been engaged in the pre-construction stages.
A Plattsburgh construction company secured a $ 10.4 million state contract to build the new Schenectady train station less than two months after one agency declared the vendor «non-responsible» and removed it from a project at the Harriman State Office Building Campus in Albany.
After initially settling on a site on the Buffalo Niagara Medical Campus to house AMRI, officials from Fort Schuyler abruptly abandoned that plan in the fall of 2013 in favor of a building under construction by Louis Ciminelli's company, LPCiminelli, and owned by his brother Paul's firm, Ciminelli Real Estate.
UPDATED, 12:04 p.m., March 23: The city Department of Buildings ordered Joseph Chetrit to stop work at the Hotel Chelsea late Friday night, in response to a construction incident that knocked out gas, heat and hot water at the property — and a day after City Council Speaker Christine Quinn demanded an immediate shutdown of construction.
But a week after they went up, the Building and Construction Trades Council put up a billboard of a different sort eight blocks to the south, displaying the slogan «New York City is a UNION TOWN!
The Building and Construction Trades Council is going after Alma Realty for allegedly sidestepping its promise to hire union labor on its Astoria Cove...
After two years in the making the Chartered Institute of Building has published the world's first contract specifically aimed at the management of time in complex construction and engineering projects.
The head of the failed city - run Build It Back program should fire or resign, after the controversial rebuilding debacle proved to be a «boondoggle» of bureaucratic red tape and poor construction work, according to Queens Councilman Eric Ulrich, who is mulling a run for NYC mayor next year.
After years of delays and stagnation, construction is now moving forward at a dizzying pace, as 3,500 workers each day build two skyscrapers, a train station, a memorial and a museum.
The Building and Construction Trades Council is going after Alma Realty for allegedly sidestepping its promise to hire union labor on its Astoria Cove megaproject.
After they failed to agree on paying construction workers a prevailing wage for buildings with 15 or more units, the tax abatement program expired, and the governor has yet to announce a program to take its place.
EDC projects construction would cost $ 250 million and last 18 months, after which the building would be the third - tallest on the block, behind Zeckendorf Towers and the Consolidated Edison Building, and open for business sometime in the middle building would be the third - tallest on the block, behind Zeckendorf Towers and the Consolidated Edison Building, and open for business sometime in the middle Building, and open for business sometime in the middle of 2020.
A three - mile - long levee had been built next to the river; a landfill partly in the river's floodway (as defined in 1995) had expanded; parts of the floodplain had been built up with construction fill; and development along three small tributaries of the Meramec had destroyed riparian borders, so that they became torrents after a rain but no longer flowed continuously.
Clare Reimers of Oregon State University in Corvallis, which is managing the construction project, says «The plan is for a staggered build with hulls two and three starting 1 and 2 years after hull one, respectively.»
It was by far the best deal I've seen after much searching especially including the build materials, construction and features.
Because the alignment of a state's student achievement tests is notoriously low to that state's content standards despite ESEA requiring that they be highly aligned, my students and I developed a test construction algorithm that uses the SEC to build aligned assessments rather than just to measure the degree of alignment of an assessment to its content standards after the fact.
Renovation work will begin after the end of this school year, and the building must be vacated by mid-summer so construction can begin.
Set to be the most powerful vehicle to be built in China, work is due to start on the construction of Polestar's new Chinese factory any day now with completion due in 12 months and the first Polestar 1 set to be built 12 months after that.
-- If final regulations have not been issued pursuant to this section, for new construction or alterations for which a valid and appropriate State or local building permit is obtained prior to the issuance of final regulations under this section, and for which the construction or alteration authorized by such permit begins within one year of the receipt of such permit and is completed under the terms of such permit, compliance with the Uniform Federal Accessibility Standards in effect at the time the building permit is issued shall suffice to satisfy the requirement that facilities be readily accessible to and usable by persons with disabilities as required under section 303, except that, if such final regulations have not been issued one year after the Architectural and Transportation Barriers Compliance Board has issued the supplemental minimum guidelines required under section 504 (a) of this Act, compliance with such supplemental minimum guidelines shall be necessary to satisfy the requirement that facilities be readily accessible to and usable by persons with disabilities prior to issuance of the final regulations.
This comes after Jeep squared away a $ 280 million partnership with Jaguar Land Rover's parent company, the India - based Tata, to build an assembly plant in Ranjangaon, India for the construction of the Compass, Renegade, and upcoming compact A-segment Jeep.
San Francisco's Panama - Pacific International Exposition 1915, celebrating the completion of the Panama Canal and the rebuilding of San Francisco after the 1906 earthquake, resulted in the construction of the Palace of Fine Arts located near the Golden Gate Bridge - and the great Crystal Palace built for the first world exposition in London stood proudly until 1936, when it was destroyed by fire.
Existing manufactured homes built after June 15, 1976 that fail to conform to the Manufactured Home Construction Safety Standards, as evidenced by affixed certification labels (e.g., data plate and HUD certification label) and / or lack a permanent foundation as required in HUD's Permanent Foundations for Manufactured Housing Guide or homes that are installed or were occupied previously at another site or location.
Existing manufactured homes built after June 15, 1976 that fail to conform to the Manufactured Home Construction Safety Standards, as evidenced by affixed certification labels (e.g., data plate and HUD certification label) and / or lack a permanent foundation as required in HUD's Permanent Foundations for Manufactured Housing Guide.
After a major catastrophe such as a hurricane or tornado, construction costs may rise suddenly because the price of building materials and construction workers increase due to the widespread demand.
Buleleng is planning to build a facility second international airport after the Ngurah Rai international airport, located in the district of Buleleng, North Bali, exactly in Gerogak, Pemuteran.Diadakan village meetings with the various elements of the people of Bali to discuss the construction of the Airport, from various parties and local community also thinks, an -LSB-...]
In 1999 construction of the MV Mermaid I began in Bangkok, where she was built by an experienced and highly professional team and completed after two years.
Hand - built from brick, cement, and iron by the great paleo - artist Benjamin Waterhouse Hawkins, these architectural constructions were the first dinosaur models ever put on public display, only a few years after the term «dinosaur» itself was coined, in 1842, by Hawkins» scientific overseer, the anatomist Richard Owen.
Combining the building times of all five projects, you have about 7 - 10 hours of construction (which is more interesting than you think) and after that some of the minigames for the projects are a blast!
The title of the exhibition points to a pre-Christian legend that says that the Achaemenid King and Egyptian Pharaoh Xerxes had the strait at Hellespont punished with 300 lashes, after bridges that had been built on his order were destroyed by a storm shortly after construction.
After Czechoslovakia formed as an independent state, it was decided that the building of Rudolfinum would become the seat of the new parliament, and the construction modifications affected not only the gallery but also the concert wing of the building.
After talking to construction experts and sifting through New York City filings, she estimates the building cost $ 20 million, half of that offset by the sale of Sperone Westwater's previous space in the Meatpacking District:
The 10,000 - square - foot exhibition area is to be spread over the fifth and sixth floors of H Queen's, a 24 - story «gallery and lifestyle tower» under construction in the bustling Central district, and will open shortly after the building is completed.
After eight years of renovation and a construction of a new building next to the old one, the museum has reopened in September of 2012.
But Cooper Union's president, Jamshed Bharucha, who arrived after construction was completed, said that the discussion about the building was a red herring, and that the real problems date to at least the 1970s.
After further discussions about whether to relocate the contemporary art museum to an Amsterdam park, a new jury eventually awarded Benthem Crouwel Architects the renovation and construction contract for their design for the new building, referred to as «The Bathtub».
Less than four months after proposing the construction of a solar farm to the Massachusetts Executive Office of Transportation, Solarflair Energy and Westboro 21 South Street Inc. are jut about finished building the Milk Street solar farm — a 240 - kilowatt (KW) photovoltaic (PV) solar energy installation in Westboro Massachusetts.
Owners Bill and Sue Thomas started the business after years of doing restoration construction, refurbishing old materials and buildings.
After the implementation of the IGCC via local construction codes it will be interesting to see if more buildings will become LEED - certified since building owners and designers will be mandated to follow a process similar to the rating system, or whether there will be less demand for LEED certification since most buildings will have to follow similar mandates anyway.
After decades of demonstrations and protests against the building of an enormous hydroelectric dam at Belo Monte in the lush Brazilian rainforest, the government has finally given approval to begin construction.
a b c d e f g h i j k l m n o p q r s t u v w x y z