Here's an essay from Botkin reflecting on ways to move toward a sustained expansion of clean energy technology
after generations of energy policies shaped by abundant supplies of coal and oil and disregard for their indirect impacts.
Not exact matches
A PERTH company is a step closer to commercialising a new form
of renewable
energy power
generation after being recognised as a leading low - carbon innovator.
Instead, a private consortium
of investors, including investment bank Goldman Sachs and private equity firm Kohlberg Kravis Roberts & Co., purchased the power
generation company and last week changed its name to
Energy Future Holdings Corporation
after withdrawing eight
of the planned applications.
After a timid start, the approval
of the «Law 20/25» in 2013 — which set a target
of 20 percent nonconventional renewable
energy (NCRE) generation by 2025 — triggered a boom in NCRE, according to data from the Chilean Association of Renewable Energy (A
energy (NCRE)
generation by 2025 — triggered a boom in NCRE, according to data from the Chilean Association
of Renewable
Energy (A
Energy (ACERA).
These two well - known stories speak to the youthful entrepreneurial
energy that has helped young people from each
generation launch businesses either right out
of school or soon
after.
I would liken the predicament more to a Faustian bargain in which humanity has been granted supernatural power through the bounty
of divine
energy stored in fossil fuels; and
after a few
generations of blissful consumption, the devil has returned for his due.
They are approaching the theoretical limiting efficiency
of 33 % and achieve cost parity with fossil fuel
energy generation after a payback period
of 5 - 7 years.
Japan says its focus will be promotion
of energy efficiency «at the same level as the significant
energy efficiency improvement
after the oil crisis», as well as «maximum introduction
of renewable
energy, promotion
of high efficiency in thermal power
generation, and utilization
of nuclear power
generations whose safety is approved».
The Ontario Ministry
of Energy, in its latest progress report on commitments issued shortly after COP21, prioritized the involvement of First Nation and Métis communities in new generation and transmission projects, as well as in conservation and community energy planning initia
Energy, in its latest progress report on commitments issued shortly
after COP21, prioritized the involvement
of First Nation and Métis communities in new
generation and transmission projects, as well as in conservation and community
energy planning initia
energy planning initiatives.
Requires FERC to: (1) issue to each generator
of renewable electricity a REC for each megawatt hour
of renewable electricity generated
after December 31, 2011; (2) issue three RECs for each megawatt hour
of renewable electricity generated by an existing distributed renewable
generation facility; and (3) review the effect
of issuing three RECs and to reduce such number for any given
energy source or technology to ensure that such number is no higher than is necessary to make such facilities using such source or technology cost competitive with other sources
of renewable electricity
generation.
Just weeks
after the solar industry installed the one millionth system in Germany, the country's solar trade association announced that the technology accounted for 3 %
of total
energy generation in 2011 — increasing 60 % over 2010 to 18.6 terawatt - hours (18.6 billion kilowatt - hours.)
In 2014, 21 countries, including the United States, generated a total
of about 69 billion kWh
of electricity from geothermal
energy.1 The Philippines was the second - largest geothermal electricity producer
after the United States, at about 10 billion kWh
of electricity, which equaled approximately 14 %
of the Philippines» total electricity
generation.
After a long and cloudy winter we are now observing surplus
energy generation, which will offset the winter - use
of electricity.
After energy consumption is reduced to a minimum, onsite renewable
energy generation, likely PV in the majority
of cases, would complete the balance.
Researchers from the University
of Tennessee wrote: «The evidence that consumers increase
energy consumption
after being exposed to conservation calls, yet no reduction in
generation is observed over critical superpeak hours, is consistent with an emergent body
of work in environmental economics exploring the unintended consequences
of various policy actions.»
Tier 1 RECs are derived from the
energy production
of megawatt - hour (MWh) by RES - eligible electric
generation sources which first entered commercial operation on or
after January 1, 2015.
Previously, solar power plants had depended on back up
energy plants powered by carbon emitting fuels because a solar system's peak
generation hours do not coincide with the utility's peak load hours
after 5 p.m. Low sunlight meant low
energy generation, and this challenge scaled back the environmental benefits
of solar plants.
The ongoing saga
of the conversion
of Ontario Power
Generation's (OPG) Thunder Bay 300 - MW coal plant took another twist on Budget Day, May 1, 2014, as
Energy Minister Bob Chiarelli used his hammer to force a contract between the Ontario Power Authority and the OPG in respect to the allowable cost recoveries
after conversion.
This is a bill for
energy independence
after a devastating oil spill, a bill to hold polluters accountable, a bill for billions
of dollars to create the next
generation of jobs, and a bill to end America's addiction to foreign oil.»
While another
of Finkel's recommendations - a Clean
Energy Target (CET) to replace the Renewable
Energy Target (RET)
after 2020 - would incentivise new low emissions
generation, it also contains a controversial caveat.
Australia's chief scientist Dr Alan Finkel has recommended that
after 2020, wind and solar projects should be required to pair with
energy storage capacity or dispatchable
generation plants to enhance the security
of the power system.
After the restructuring, RWE will own even larger shares
of conventional
generation in Germany, which gives this company more market power and political weight when discussing the future
of energy production in Germany
On the other hand, based on measurements (for example the Perry curves in this posting as well as others in his book), I am quite certain that a substantial portion
of the LWIR
energy emitted from the Surface ultimately,
after a number
of absorption and re-emission transactions, does make its way back down and that some
of that downwelling LWIR is due to layers above the initial, first -
generation extinction level.
Building type: 1950s solid wall brick house, east - west orientation, detached (91sqm extended to 125sqm) Location: Nottingham Budget: Approx # 200k including extensions, full refurbishment, full and internal fit - out, garage rebuild, landscaping Space heating demand Before: 458 kWh / m2 / yr according to EPC at time
of purchase
After: 24kWh / m2 / yr (PHPP) Heat load Before: not known
After: 10 W / m2 Primary
energy demand (PHPP) Before: not known After: 81 kWh / m2 / yr Primary energy demand (measured) Before: 330 kWh / m2 / yr After: 81 kWh / m2 / yr Energy performance certificate (EPC) Before: E 39 After: B90 (predicting space and water heating total of over 13,000 kWh / yr compared with actual value of 5,345 kWh in 2013) Measured total energy consumption Before: 275 kWh / m2 / yr (Apr 2010 - Mar 2011) After: 56 kWh / m2 / yr (Jan - Dec 2013), not including PV use or gener
energy demand (PHPP) Before: not known
After: 81 kWh / m2 / yr Primary
energy demand (measured) Before: 330 kWh / m2 / yr After: 81 kWh / m2 / yr Energy performance certificate (EPC) Before: E 39 After: B90 (predicting space and water heating total of over 13,000 kWh / yr compared with actual value of 5,345 kWh in 2013) Measured total energy consumption Before: 275 kWh / m2 / yr (Apr 2010 - Mar 2011) After: 56 kWh / m2 / yr (Jan - Dec 2013), not including PV use or gener
energy demand (measured) Before: 330 kWh / m2 / yr
After: 81 kWh / m2 / yr
Energy performance certificate (EPC) Before: E 39 After: B90 (predicting space and water heating total of over 13,000 kWh / yr compared with actual value of 5,345 kWh in 2013) Measured total energy consumption Before: 275 kWh / m2 / yr (Apr 2010 - Mar 2011) After: 56 kWh / m2 / yr (Jan - Dec 2013), not including PV use or gener
Energy performance certificate (EPC) Before: E 39
After: B90 (predicting space and water heating total
of over 13,000 kWh / yr compared with actual value
of 5,345 kWh in 2013) Measured total
energy consumption Before: 275 kWh / m2 / yr (Apr 2010 - Mar 2011) After: 56 kWh / m2 / yr (Jan - Dec 2013), not including PV use or gener
energy consumption Before: 275 kWh / m2 / yr (Apr 2010 - Mar 2011)
After: 56 kWh / m2 / yr (Jan - Dec 2013), not including PV use or
generation.
[9] The merger would mean «increased emissions from coal - fired
generation» with an increase
of 9.5 million MWH
of coal - fired
generation over the first five years
after the merger... and would also result in the creation
of a dominant procurer
of renewable
energy that would limit the pool
of renewable
energy developers.