Virginia Winder of Benedictine College, Andrew Gregory of Bowling Green State University, Lance McNew of Montana State University, and Brett Sandercock of Kansas State University monitored prairie - chicken leks, or mating sites, before and
after turbine construction and found that leks within eight kilometers of turbines were more likely to be abandoned.
Virginia Winder of Benedictine College, Andrew Gregory of Bowling Green State University, Lance McNew of Montana State University, and Brett Sandercock of Kansas State University monitored prairie - chicken leks, or mating sites, before and
after turbine construction and found that leks within eight kilometers of turbines were more likely to be abandoned.
Not exact matches
The Smoky Hills site — the Meridian Way Wind Power Facility near Concordia — was developed into a wind energy site, which gave researchers the opportunity to observe greater prairie chickens before, during and
after wind
turbine construction.
After wind
turbine construction, they found an increased rate of lek abandonment at sites within eight kilometers of the
turbines as well as a slight decrease in male body mass.
With a patent - pending design featuring durable
construction, a unique hinged flip that won't break off (
after only a few uses), drip - proof cap, and novel «
turbine» strainer to break up the protein clumps, the Animal Shaker Cup works just as good as it looks.
The proponents say that «The
turbines will be situated on previously cleared farm land and have minimal environmental impact during and
after the
construction phase.
Where renewable energy has yet been proven at all to reduce CO2
after the entire production system, the
construction, the access roads and the power cabling, the high maintenance and the final disposal of the
turbines is added up.
After six years of
construction, the first of the Reventazón dam's five
turbines was synchronized and expected to be connected...
The meeting was put together
after RES proposed the
construction of approximately 100 or more wind
turbines in L'Anse Township on Weyerhaeuser property combining a total -LSB-...]
1) A review of the European and other wind
turbine siting criteria and existing studies of the prevalence of noise problems
after construction;
Unfortunately, some of the
turbines developed significant faults shortly
after construction was completed and costly repairs were necessary.