Our deep experience in the legal market makes this program uniquely useful to those who are seeking to gain and
apply effective project management skills in the legal arena.
Not exact matches
This is the first study to
apply a treatment that has been shown to be successful in other populations to individuals with MS.. This
project may provide important evidence showing that this strategy can be
effective for improving social functioning in the community, workplace, and at home, and enhance quality of life for people with MS.
«In this study we
applied the method to bacterial 16S sequencing but since the generation of these libraries is easy, flexible and cost
effective — no fancy fluidics equipment or chemical synthesis of specific barcodes is needed — we are currently
applying the assay in a number of other
projects.
The
project, which is dedicated to the notion that great teaching can be learned, features videos that show Harvard instructors using highly
effective, evidence - backed teaching moves, which can be adapted and
applied across a variety of educational settings.
Collaborate with architects and educators from around the world to
apply principles of
effective pedagogy and design to physical learning environment
projects.
This basic structure
applies to the majority of instruction; it is integral to, and the prerequisite for,
effective project - and problem - based learning.
This professional learning serves the Distinguished Principals and the
project in two ways: first, it supports them in becoming strong,
effective coaches responsible for growing the next generation of Distinguished Principals; and second, it prepares them to eventually
apply for the Master Principal credential once that credential is developed with our partner states and districts.
During
project implementation,
effective financial control on and supervision of
project partners are
applied.
To this end, the study team identified technologies that could use the available approved CDM methodologies — many of which have already been
applied successfully to
projects in other developing regions — to both reduce GHG emissions and support energy development in the region via additional energy supply or more cost -
effective use.
By
applying project management principles in the delivery of legal services, we can ensure that clients receive the most efficient and
effective service from the very outset.
This certification training bundle is a proven pathway to the agile scrum certification, through eight hours of training content delivered online through each course, you'll learn the key concepts behind agile and scrum, and how they're
applied to
projects to ensure timely, efficient and cost -
effective solutions.
• Versatile, innovative and process - oriented Senior - level IT professional with proven record of accomplishment of
applying appropriate, practical technology / mix technologies in developing cost -
effective project applications.
Business Process Analyst Resume objective 4: To work efficiently at the position of a Business Process Analyst and
apply my professional experience of planning of
projects and business operations to attain cost -
effective production.
Proficient in
applying technical knowledge and
project management skills to complex and construction and renovation tasks, while providing high - quality team collaboration and facilitating
effective issue resolution.
If an individual is
applying for this position, a
project analyst resume template helps him to design his own resume in an
effective manner.
The candidate should
project the suitability of his or her candidature by quoting the relevant education obtained and how he or she will be the best candidate to
apply the skills needed to perform the job in an
effective manner.
Programmer Analyst and / or Technical Manager (or similar role), to where I can
apply my skills from a wide array of experiences so that I may assist organizations with achieving
project fulfillments and / or resolve any unexpected negative impacts in the most
effective manner.
Globeop Financial Services, LLC (Harrison, NY) 2005 — 2007 Manager Enterprise Infrastructures Group • Designed and implemented disaster recovery system for Reuiter's Kondor 3.0 on Solaris 10 and Sybase 12.0 — 15.0 • Installed, configured, and managed Reuiter's Kondor 3.0; Solaris 10 (LDOMS, ZFS, RAID, ZOANS, CONTAINERS); AIX 4.3 - 5.3, Red Hat Enterprise — RHEL 3.0 — 4.0, Sybase 12.0 — 15.0, Oracle 10g, MYSQL 2.7.1, Sun One Directory Server (LDAP), SUN IDM, Solstice Disk Suite, Sun Cluster 3.0 - 3.2, Veritas Storage Foundation 4.1 — 5.0, Veritas Cluster Server, Veritas NetBackup 5.0 — 7.0, Storage Array A1000 — A3500, EMC SAN, HITACHI SAN, 3 PAR, Brocade switch 40K, Cisco switch 6309, SSH, SSL, RSA encryption, Emulex LPFC, NaviSphere, EMC, and Power path • Automated processes utilizing shell scripts (Bourne, Korn, C Shell, Bash, AWK, SED and Perl) • Strong technical expertise in all major server technologies (SUN / HP / IBM / Linux / Microsoft) experiment in managing mission critical, low latency, high availability and clustered IT systems and familiar with FIX protocol • Performed massive installation of Solaris servers using both Jumpstart and Blade Logic and Red Hat using both PXE boot and BladeLogic servers to global distributed network of more than 2500 servers • Conducted disaster recovery tests • Managed and supervised four technicians ensuring continuity of service and efficient operations • Coordinated effort among Development, System, Networking, Application Support, Backup and recovery team to ensure maximum up time and
effective issue resolution • Planned & developed
projects, performed user acceptance tests, and
applied patches to repair bugs • Developed shell scripts for Bourne shell, Korn shell, C Shell, AWK, PL / SQL and PERL • Managed DNS, NIS, NIS +, LDAP, jump start, Send Mail, SFTP, FTP, HTTP, SSL, SSH, Telnet and HP Open View • Coordinated effort between Development, QA, Production, DR, Systems, DBA, Production Support and Network Administration, Applications group for
project completion ahead of time and under budget • Managed DNS, NIS, NIS +, DHCP, LDAP, SFTP, jumpstart, Apache, Tomcat, Websphrer and HP Open View.
Demonstrated history of
applying technical knowledge and
project management skills to complex language - related situations, while providing high - quality team collaboration and facilitating
effective issue resolution.
Professional Profile Utilize technology to drive the construction and renovation process, including both diagnostic and construction tools, equipment, and various media such as tile, drywall, wood, brick, flooring, wiring, plumbing, and fixtures Perform needs - based technical assessments to identify areas of concern while facilitating an
effective and timely solution to any construction issues
Apply technical knowledge and education to installation, maintenance, and repair tasks, focusing on the accurate and efficient completion of all assigned jobs Maintain a strong working knowledge of products, materials, construction techniques, equipment maintenance and use, and other relevant industry knowledge and trends Organize and manage construction and renovation process from initial consultation to job completion, while collaborating effectively with other staff, material and equipment vendors, and firm management Interact in a professional and
effective manner with customers utilizing polished introduction and explanatory skills, providing complete and accurate issue descriptions Provide complete support to other construction personnel and management with technical assistance, guidance, and successful collaboration Lead through example with consistent work ethic, attitude, and professionalism, while performing all construction and design tasks, supporting all
project management and execution tasks, and facilitating high - quality relationships with vendors, customers, and other interested parties Participate extensively in all continuing education and advanced technical training opportunities Address customer and staff queries and resolve them in an expedited manner Act as a liaison between clients, vendors, suppliers, construction team members, and management staff members
Good management practices consistently
applied and a strong implementation culture persistently pursued are the foundations of
effective project leadership...
The ATSIS Native Title Capacity Building
project is consistent with a capacity building approach as it aims to build capacity within NTRBs, addressing priority areas: corporate and cultural governance, management and staff development, native title technical training, collaborative training and research /
applied capacity building.7 While these areas are essential for the
effective operation of NTRBs, the capacity building program does not aim to build the capacity of the traditional owner group.
Effective Jan. 1, 2018, warranties previously offered only on newly constructed buildings now
apply to residential condominium conversion
projects (RCCPs)- for example warehouses or other types of industrial structures.