Sentences with phrase «approved test report»

Please click here for our full FDA - approved test report for our mini dippers.
Please click here for our full FDA - approved test report for our food containers.
Please click here for our full FDA - approved test report for our vinyl - free lunch bags tested for CPSIA section 101 (a)(2).

Not exact matches

I've heard varying reports on what people are actually doing with it — the most common is served with cheese and crackers as an appetizer (this method has been me - tested and wholeheartedly approved), but I've also heard that it's been mixed with Dijon mustard for a marinade, and I've even gotten a report or two that it's been used in a grown - up version of a classic PB&J.
The AP reported Cuomo had come closer than he ever had to deciding whether to approve limited test wells.
Some said they also kept tabs on officials involved in drug testing: 55 schools (70 percent) reported monitoring senior and mid-level officials responsible for hiring and firing, and 62 of them (81 percent) said they kept an eye on members of so - called institutional review boards, who approve human research proposals.
In October, Congress approved a conference report attached to the U.S. Department of Interior's appropriations bill that cited expanded leasing in the Arctic Ocean, including seismic testing and exploratory drilling, and called for independent scientific analysis before the agency proceeds.
Because both drugs are approved for use by the Food and Drug Administration, physicians have tested the combination with patients, resulting in anecdotal reports of significantly improved pain management, Dr. White said.
Each proposed field test or environmental release of a gene - drive modified organism should be subject to robust ecological risk assessment before being approved, the report says.
The Master Cleanse has been tested and approved since 1940 by millions of people all around the world and is constantly reported as the most successful diet of its type.
For instance, schools taking kids with scholarships funded through Florida's tax credit program must be approved by the state, meet teacher - qualification requirements, and administer either state exams or nationally norm - referenced tests and share the results with a researcher contracted by the state to report on scholarship students» progress.
The Senate education committee last week approved a bipartisan bill to reauthorize Head Start that would expand eligibility for the federal preschool program, tighten accountability for local grantees, and abolish the National Reporting System, a federal test given to all 4 - and 5 - year - old Head Start pupils.
The new report did not capture a precise measure on what proportion of tests were required by teacher evaluation, but it does point out that many states have put in place new assessments «to satisfy state regulations and laws for teacher and principal evaluation driven by and approved by U.S. Department of Education policies.»
Last week, Stephen Sawchuk reported that delegates to this year's NEA Representative Assembly approved a resolution which directs the union to draft model legislative language that would prevent districts from punishing students who opt out of standardized tests.
In 2007 they approved funding for the first public Waldorf methods high school, in the Sacramento Unified School District; and (3) Three key findings on urban public schools with Waldorf methods: (a) In their final year, the students in the study's four California case study public Waldorf - methods elementary schools match the top ten of peer sites on the 2006 California test scores and well outperform the average of their peers statewide; (b) According to teacher, administrator and mentor reports, they achieve these high test scores by focusing on those new three R's — rather than on rote learning and test prep — in a distinct fashion laid out by the Waldorf model and (c) A key focus is on artistic learning, not just for students but, more importantly perhaps, for the adults.
At its meeting on Wednesday, the State Board of Education approved, with suggestions for changes, a draft of the report, which districts will send home within two months after students take the new test.
In the Austin Daily Herald, Solvejg Wastvedt reports that the U.S. Department of Education has approved Minnesota's ESSA plan, under which the state «will evaluate schools on five factors: state test scores, how many students move up a level on state tests, graduation rates, progress for students learning English and school attendance.»
In addition to misleading and lying to parents about their right to opt their children out of the testing madness, parents in a series of communities are now reporting that school children who have been opted out of the testing are being forced to remain in the testing rooms, despite the fact that this bullying tactic violates the SBAC testing protocol, testing regulations that were approved and distributed by the State Department of Education.
In the Austin Daily Herald, Solvejg Wastvedt reports that the U.S. Department of Education has approved Minnesota's ESSA plan, under which the state «will evaluate schools on five factors: state test scores, how many students move up a level on state tests, graduation rates, progress...
Also Wednesday, the Assembly Education Committee approved a bill that would prohibit the use of this year's test scores in measuring teachers and schools, and prohibit the creation of a school report card for the 2014 - 15 school year.
The EPA has approved sales of BMW diesel models for the 2017 model year after a delay due to unspecified testing logistics last month, Reuters reports.
The report, based on survey results from Parent Tested Parent Approved (PTPA) Media Inc., showed an exponential growth in children's ebook consumption just in the last three years, with Kobo's children's sales increasing tenfold in that time and the American Publisher's Association stating a 200 % increase in children's sales.
The report, based on survey results from Parent Tested Parent Approved (PTPA) Media Inc., showed an exponential growth in children's ebook consumption just in the last three... [Read more...]
POC: Susan King Scope and Purpose: The Testing Coordinator is responsible for providing exam access for applicants approved to take the exam, providing the exam access information to the proctors, and reporting exam results.
Once approved, the sample may be sent to OptiGen for free testing, and a report will be sent to the owner.
In the earlier history of the case, the DVGW refused to recognise a test report drawn up by an Italian certification firm because the DVGW had not approved this firm as one of its testing laboratories (see para 10).
The insurance company will review the report and then may approve or deny something (testing, exams, injections, surgery, return to work status, and so on) based on this report.
Architect's Certificate For projects constructed or substantially renovated within one year prior to closing, we require an architect's certificate (signed and under seal) certifying completion of the entire project in accordance with the approved plans and specifications and the recommendations contained in any pre-construction soil test report.
¥ Collaborated with other managers on new project designs ¥ Maintained telephony systems at various locations ¥ Prepared detailed project assessments including cost projections ¥ Performed site inspections and prepared related reports as requested ¥ Ensured compliance with quality assurance procedures ¥ Prepared project life cycle assessments ¥ Approved overtime pay on a per project basis ¥ Monitored national and international market infrastructures ¥ Tested new designs prior to full implementation ¥ Provided staff training on telecom procedures and project specifics ¥ Ensured project completion according to predetermined timeline ¥ Prepared maintained and reviewed project cost reports.
Trained in (ISO 13845) for Medical devices, (FDA QSR) Quality System Reports, (ATP) Approved Test Plan, (AQL) Acceptance Quality Level, (RGA) Return Goods Authorization, (NCR) Non-Conformance Report, (CAPA) Corrective and Preventive Action, (QSP) Quality System Procedure and (QWI) Quality Work Instructions
Reviewed and approved structural test plans and reports (for improvements, thoroughness, and clarity) for FAA / FAR (Federal Acquisition Regulations) certification of seats, lavatories, galleys, space integrated carts, electrical payloads equipment and other payloads commodities
• Adept at seeking approvals surrounding physician schedules to utilize and accommodate additional time or approved changes in schedules and appointments • Track record of scheduling post-operative visits by actively following up on patients and providing them with necessary reminders • Competent in ensuring that all pre-operative testing is scheduled and carried out and that test reports are obtained prior to scheduling of surgical procedures
Created and approved documentation related to Software Quality Assurance including test plans, test scripts, test reports, risk analysis, and design of experiments focusing on software requirements.
Oversee all aspects of test plans, reports and test scripts documenting customer requirements and note project risk assessments from design reports and developer's test results, compared and approved requirements developing test cases to realize risk levels.
Excel Logistics (Memphis, TN) 7/2004 — 1/2006 Business Analyst • Analyzed business problems, determined cause and nature, and provided innovative solutions • Oversaw implementation of system and process solutions ensuring effective and timely resolution • Identified WMS system modifications, prepared development cost estimates, and determined timeline • Prepared acceptance test plans for WMS systems and assisted in installation and operation • Met internal and external compliance requirements including GxP and SOX for WMS systems • Approved the documentation of key deliverables including plans, protocols, reports, and change controls to ensure contents met business and regulatory requirements • Developed and managed requirement process flows • Reviewed audit reports and responded to findings
a b c d e f g h i j k l m n o p q r s t u v w x y z