Not exact matches
With the estimated
cost of the project
as high
as $ 12 billion, including
as much
as $ 10 billion for cement, the contract would likely be a huge win for a
local building company.
While the Deluxe staff on the tour are giving free presentations on many topics I've spoken and written about including Search Engine Optimization, Social Media Marketing,
building Web Sites and lots of others, my presentation for this tour is on «
local marketing» - how you
as a small business owner can easily use the Internet to * successfully * gain visibility and sales within a
local area at very little
cost.
The company hasn't said whether it prefers to
build downtown,
as it has at its current headquarters in Seattle, or will opt instead for a suburban office park — a decision that could have significant implications for the project's effect on
local housing
costs.
Tesla CEO Elon Musk recently said that the company is looking to start
building cars in China
as a way to offer its cars to those in the country, with a
local factory significantly cutting shipping
costs and removing the need for import fees.
Build an audience first, with higher - volume, lower -
cost content, including well - leveraged curation of
local media — and then invest in journalism
as the business grows and can support it.
Tax cuts always effect assets prices, regulations are estimated to account for up to 35 % of
building new construction
costs for homes in some locations and though federal deregulation may not impact
local regulations
as much it does have a multiplier effect on the economy just like a tax cut does and anticipation of an infrastructure plan the scale of this administration's, though it hasn't been passed, would also have an anticipatory effect on leading indicators like stocks and other commodities that raise
costs, which we have already seen.
But in the ninth century,
as the expense of financing all these churches and clergy became enormous, some
local governments began to excise additional taxes on the people, which went to help cover the
costs of maintaining the church
buildings and clergy.
Costs have been estimated at # 400 - 450 million, but could rise
as high
as # 800 million due to complexities in the
build on what is compact land footprint, and
local infrastructure requirements.
The report finds makes a list of recommendations for business, industry, professional bodies and government, namely: Construction businesses · Focus on better human resource management · Introduce and / or expand mentoring schemes · Boost investment in training · Develop talent from the trades
as potential managers and professionals · Engage with the community and
local education establishments Industry · Rally around social mobility
as a collective theme · Promote better human resource management and support the effort of businesses · Promote and develop the UK
as an international hub of construction excellence · Support diversity and schemes that widen access to management and the professions · Emphasise and spread understanding of the
built environment's impact on social mobility Professional bodies and institutions · Drive the aspirations of Professions for Good for promoting social mobility and diversity · Support wider access to the professions and support those from less - privileged backgrounds · Promote and develop the UK
as an international hub of construction excellence · Emphasise and spread understanding of the
built environment's impact on social mobility · Provide greater routes for degree - level learning among those working within construction Government · Produce with urgency a plan to boost the UK
as an international hub of construction excellence,
as a core part of the Industrial Strategy · Provide greater funding to support the travel
costs of apprentices · Support wider access to the professions and support those from less - privileged backgrounds · Place greater weight in project appraisal on the impact the
built environment has on social mobility The report is being formally launched at an event in the House of Commons later today.
But their survey of over 600
built environment professionals reveals that healthy placemaking sits on the periphery of UK housing, public health and placemaking policy and continues to be seen
as a
cost to
local development rather than an investment.
The public is perfectly comfortable with a major new hospital
costing significantly more to
build and operate than a new
local GP surgery, just
as they accept that the price of a new Aston Martin will be higher than that of a new Fiat 500.
This is not to mention other critical subheads such
as Local Travels & Transport Allowance,
Local & International Training
Costs, Maintenance of
Buildings (Offices & Barracks), Aircrafts, Marine Boats, Feeding of Detainees nationwide, Provisions of Uniform & Accoutrement, etc..
1649 - Home Office - The Home Office and Department for Communities and
Local Government will move into one
building in 2014
as part of continuing work to reduce
costs.
NYPD Commissioner James O'Neill sent a letter imploring the
local delegation to the House and Senate to get the city reimbursed for its ongoing protection of President Donald Trump «s eponymous tower — estimating the perimeter around the Fifth Avenue Xanadu currently
costs his department anywhere from $ 127,000 to $ 146,000 a day, and the FDNY an average of $ 4.5 million annually so long
as members of the First Family remain in the
building.
Building cities in a way that slows vehicle demand while delivering high accessibility could prove to be a low -
cost option for curbing greenhouse gas emissions,
as well
as a solution to pressing problems for policymakers like
local air pollution and poor public health.
With the more
cost effective alternatives to enterprise Learning Management System software, such
as WordPress web development tools and availability of free resources for setting up an education website, it is becoming easier for
local schools and individual tutors to
build a great site with minimum investments.
With continuous pressure on school and
local authority budgets, there continues to be a push for highly sustainable
buildings that deliver lower than usual energy
costs as well
as limiting the ongoing maintenance work that some
building types require.
Referred to
as «Austerity Schools» by some, the plans aim to reduce the
cost of new school
buildings by 30 per cent and will help
local authorities cut capital spending.
The Public
Buildings Cost Reduction Act of 2007 (S. 992) helps make federal buildings more energy efficient and cost effective, and includes $ 100 million dollars in EPA grants for local governments to make their buildings more energy efficient
Buildings Cost Reduction Act of 2007 (S. 992) helps make federal buildings more energy efficient and cost effective, and includes $ 100 million dollars in EPA grants for local governments to make their buildings more energy efficient as w
Cost Reduction Act of 2007 (S. 992) helps make federal
buildings more energy efficient and cost effective, and includes $ 100 million dollars in EPA grants for local governments to make their buildings more energy efficient
buildings more energy efficient and
cost effective, and includes $ 100 million dollars in EPA grants for local governments to make their buildings more energy efficient as w
cost effective, and includes $ 100 million dollars in EPA grants for
local governments to make their
buildings more energy efficient
buildings more energy efficient
as well.
One Planet Living principle Masdar Target ZERO CARBON 100 per cent of energy supplied by renewable energy — Photovoltaics, concentrated solar power, wind, waste to energy and other technologies ZERO WASTE 99 per cent diversion of waste from landfill (includes waste reduction measures, re-use of waste wherever possible, recycling, composting, waste to energy) SUSTAINABLE TRANSPORT Zero carbon emissions from transport within the city; implementation of measures to reduce the carbon
cost of journeys to the city boundaries (through facilitating and encouraging the use of public transport, vehicle sharing, supporting low emissions vehicle initiatives) SUSTAINABLE MATERIALS Specifying high recycled materials content within
building products; tracking and encouraging the reduction of embodied energy within material sand throughout the construction process; specifying the use of sustainable materials such
as Forest Stewardship Council certified timber, bamboo and other products SUSTAINABLE FOOD Retail outlets to meet targets for supplying organic food and sustainable and or fair trade products SUSTAINABLE WATER Per capita water consumption to be at least 50 per cent less than the national average; all waste water to be re-used HABITATS AND WILDLIFE All valuable species to be conserved or relocated with positive mitigation targets CULTURE AND HERITAGE Architecture to integrate
local values.
It also removes the control from the owners of the model and
costs a lot less; Architect Jeremy Nicholls of Cobourg, Ontario
built a model of his small town
as a way to fight City Hall
as part of a
local Architectural preservation society; developers» renderings always look pretty and are taken from the best vantage point, but it is much harder to pull one over when anyone can virtually walk around the
building at ground level.
Originally hailing from the UK, industrial designer - turned - natural - builder Jeffrey
built this geodesic dome cabin using recycled wood, earthen plaster and other various
local materials that he collected
as it became available, ultimately taking him two months and
costing only $ 200 for nails, screws and roofing material.
KEY ACHIEVEMENTS • Installed vinyl flooring over a large expanse of a commercial
building within the record time of weeks, in time for its opening date • Reduced materials transport
cost by 67 % by suggesting buying basic materials in bulk from a
local vendor • Reined in a massive floor installation project by assisting in project planning and making sound recommendations • Trained 52 apprentices to work
as flooring installers over a period of 4 years
ACHIEVEMENTS IN HVAC • Integrated a complex HVAC system into an already constructed commercial
building • Created a series of field surveys which reduced system assessment time by 50 % • Reduced per component
cost by 60 % by creating liaison with a
local pats supplier • Reined in a high performance HVAC project that spanned 13 months and ended up in being rated
as the «best designed HVAC system in the state» by the Home Floor magazine
• Coordinated effort between Development, QA, Production, DR, System, DBA, Production - support, Network Administration, Applications group and vendors for project completion ahead of schedule under budget • Incorporated new technologies with legacy systems to improve performance and reduce
cost • Experienced in incorporating leading open source tools: nagios, mysql, tomcat, apache, wikis, etc. • Performed broad range of UNIX Systems, Net - Working and SAN Administration tasks for large financial and networking clients such
as HSBC Bank USA, Deutsche Bank, Citi Group, ISO.com, GE Corporate Treasury, Globeop Financial Services, LLC., Sothebys.com, Church Pension Group, and Verizon Partners Solutions • Provided project leadership for managing technical resources, client / server issues, vendors, senior management reviews and hands - on technical expertise • Designed and deployed iPlanet Web / Directory server Architecture for the purpose of authentication and Widows 2000 active Directory compatibility • Prepared estimates and diagrams for the new secured Development Environment comprised of Cisco routers,
local directors, hubs, Sun servers, firewalls for deployment, staging and production • Developed one to one disaster recovery using Bourne Shell scripting for Reuters» Kondor 3.0 on Solaris 8 • Minimized website down time through careful monitoring of Sotheby's Web Vision to Amazon by using FTP servers to manage high volume uploads which optimized online trading functionalities • Directed installation, configuration, and security of multiple online global auction sites • Automated operations, disk space monitoring, and backups using Bourne and Korn Shell scripting • Developed standard operating procedure for IP multi-pathing, Emulex LPFC, HBAs, EMC Power path, Navisphere, and installed JASS on new
built servers
The Chasm Group, LLC and Chasm Institute, LLC (San Bruno, CA) 1997 — 2008 Business Operations Manager • Managed all daily operational tasks for leading multi-million dollar high - tech market strategy consultancy, while providing executive administration to C - level executives and venture capital partners • Developed and managed the firm's annual budget, proposing and implementing expense cuts, producing monthly reports and financial statements, and coordinating with CPA firm for accurate and timely filings • Oversaw all client relationship management efforts while cultivating new business efforts from concept to implementation, providing high - quality service in sales efforts while utilizing new lead tracking system • Negotiated and managed all contracts, stock grants, and financing arrangements, working closely with outside counsel to draft legal documents and resolve LLC - and proprietary - related issues • Led three office space
build - outs and two office relocations, managing all aspects of each process under aggressive timeline and budget expectations • Reduced firm telecom expenses by 22 % by streamlining IT objectives, including migration to VOIP phone system, software / hardware purchases, domain renewals, and outsourced technical support • Directed all phases of staff recruitment while creating and implementing all HR policies and programs, including comprehensive employee benefits plans • Supervised multiple administrative staff members, conducted performance appraisals and wage / salary surveys in comparison to incentive program guidelines, and maintained HR files in accordance with legal mandates • Produced all out - going client invoices in an accurate and timely fashion to increase, cash flow and reduce aging receivables, providing consistent attention to overhead
costs and vendor arrangements • Administered all company insurance policies, including E&O, general liability, bonds, partner life and disability, conducting annual benefits reviews and employee / company insurance audits • Obtained necessary certificates for consulting contracts while processing federal, state, and
local business reporting requirements to maintain licenses and incorporation status • Directed all marketing efforts and oversaw logistical aspects of national educational workshop series, utilizing sponsorship arrangements to offset production
costs • Transformed «brochure» website into a dynamic tool to better illustrate company opportunities through relevant case studies,
as well as maintaining all other promotional media, including press kits and video Association of California School Administrators (Burlingame, CA) 1993 — 1997 Issues and Planning Committee Coordinator • Executed all phases of event planning and implementation for a membership - driven organization including 23 state committees, 5 task forces, 6 strategic planning conferences, and a conference of 1,500 attendees • Focused on facility evaluations, bid requests, site visits, contract negotiations, and all pre - and post-conference planning processes • Produced statistical and financial reports, including budget projections and cost monitoring for developmental training efforts • Oversaw all participant - level responsibilities, including inquiries, eligibility, registration, correspondence, and billing statements • Managed all legal professional standards calls for Northern California regions, including the processing of attorney authorizations, the preparation of legal assistance letters, and liens on cause of action • Served as second point of contact for computer inquiries and troubleshooting efforts as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as well
as maintaining all other promotional media, including press kits and video Association of California School Administrators (Burlingame, CA) 1993 — 1997 Issues and Planning Committee Coordinator • Executed all phases of event planning and implementation for a membership - driven organization including 23 state committees, 5 task forces, 6 strategic planning conferences, and a conference of 1,500 attendees • Focused on facility evaluations, bid requests, site visits, contract negotiations, and all pre - and post-conference planning processes • Produced statistical and financial reports, including budget projections and cost monitoring for developmental training efforts • Oversaw all participant - level responsibilities, including inquiries, eligibility, registration, correspondence, and billing statements • Managed all legal professional standards calls for Northern California regions, including the processing of attorney authorizations, the preparation of legal assistance letters, and liens on cause of action • Served as second point of contact for computer inquiries and troubleshooting efforts as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as maintaining all other promotional media, including press kits and video Association of California School Administrators (Burlingame, CA) 1993 — 1997 Issues and Planning Committee Coordinator • Executed all phases of event planning and implementation for a membership - driven organization including 23 state committees, 5 task forces, 6 strategic planning conferences, and a conference of 1,500 attendees • Focused on facility evaluations, bid requests, site visits, contract negotiations, and all pre - and post-conference planning processes • Produced statistical and financial reports, including budget projections and
cost monitoring for developmental training efforts • Oversaw all participant - level responsibilities, including inquiries, eligibility, registration, correspondence, and billing statements • Managed all legal professional standards calls for Northern California regions, including the processing of attorney authorizations, the preparation of legal assistance letters, and liens on cause of action • Served
as second point of contact for computer inquiries and troubleshooting efforts as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as second point of contact for computer inquiries and troubleshooting efforts
as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as well
as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly
AS / 400 backup and report generati
AS / 400 backup and report generation