Sentences with phrase «as peak load»

Dr. William Acker, Executive Director of NY - BEST, said, «Energy storage technologies can provide multiple benefits to the electric grid and customers alike, such as peak load reduction, capacity, integration of renewable energy and resilience.
However, energy price arbitrage and other applications such as peak load reduction which could require multiple hours of storage may still be some way off from being economically viable in many cases, Regen found.
While the benefit - cost ratio «tends to increase as peak load is reduced, technical limits to the amount the peak load can be reduced with DR and energy efficiency resources limit how much of this benefit can be realized,» the report notes.
Wind, for example, you will find discussed in terms of energy needed, costs, energy produced, whether it can serve as peak load, base load, mini-generators, Liebig's Minimum, locations... etc..

Not exact matches

Given the makeup of Chicago's roster and its implementation of the triangle, this was probably Pippen's maximum offensive output, as he peaked in offensive load at 43 (96th percentile) while the Bulls posted a respectable +2.2 rORtg when healthy, better than any offense Michael Jordan led before Phil Jackson arrived.5
As a means to cut down on double - parking and disruptive deliveries, the city will also pilot banning curbside loading entirely during peak hours in a large swath of midtown — from 45th Street to 50th Street, between Sixth Avenue and Madison Avenue.
In the snatch lift as performed in competition, peak vertical bar velocity can reach 2.1 m / s (Garhammer, 1985; Okada et al. 2011) and the second pull is the fastest phase of the lift (Campos et al. 2006; Harbili, 2012; Korkmaz & Harbili, 2012; Akkuş, 2012; Harbili & Alptekin, 2014; Harbili, 2015), although peak vertical bar velocity is even higher with sub-maximal loads (Hadi et al. 2012).
Although peak velocity is less well - studied, linear barbell velocity reduces with increasing load (Suchomel et al. 2014a), as do the angular velocities of the hip, knee and ankle joints (Suchomel et al. 2014e).
This suggests that light loads in the mid-thigh pull are best for maximising power outputs, while heavy loads are best for maximising peak force production, as with many other weightlifting derivatives.
However, increases in muscle fascicle length are also likely dependent on the mechanical load incurred by the prime mover, as knee flexion (hamstring only) exercise seems to lead to greater adaptations in the hamstrings than hip extension (hamstring, gluteus maximus, and adductor magnus) exercise, even when muscle length at peak contraction is shorter (Bourne et al. 2016).
As the periods grow so does the cumulative stress load which is where the athlete does not fully recover from the training during the peak period of training volume for each period and why a recovery period.
As expected, mean concentric velocity and peak concentric velocity decreased with increasing relative load (15 — 90 % of 1RM).
Test of transfer (long - term): no trials have compared strength training using constant load vs. accommodating resistance on changes in sprinting ability, but if the band or chain resistance was set to produce a peak contract in the half or quarter squat bottom position, it might transfer as well or better than a full squat with constant load if the loading was challenging enough at that joint angle.
Dosage: Many clients take 2 capsules of Natural D - Hist 2 - 3 times per day for 10 days as a loading dose during peak allergy time and continue taking 1 - 3 capsules daily as a maintenance dose.
Are there peak periods, such as the start of the day or immediately after breaks and lesson changeovers when the system will be under particularly heavy loads?
Common - sense reforms to teacher pension systems, such as those discussed in Education Next by Robert Costrell and Michael Podgursky (see «Peaks, Cliffs, and Valleys,» features, Winter 2008), would have a similar effect of making the returns to teaching more front - loaded.
Having it operate at it's peak RPM & load all the time with no transmissions saves fuel, as well as recapturing much of the energy when braking; the new Jake Brake would be regenerative braking.
[30] As of mid-2015, peak electrical load is approximately 100 kW.
«Traditionally, consumers carry heavier debt loads between the ages of 40 and 60 as they are in their peak purchasing years,» said Becker in the release.
Since they were presumably going to operate as base load as opposed to peaker power, it's likely they were intending to sign long term contracts so that their incremental addition to the demand for coal would be absorbed not by creating an additional demand on the spot market but by identifying a fixed source with a standing order and putting a few American miners to work on a full - time basis.
As battery cars and plug - hybrids become more common the storage capacity and load - shifting (for charging) of the transportation fleet becomes very favorable in terms of load management — ditto the potential to use the fleet of parked batteries to assist during peak loads.
As long as solar is a relatively small part of the mix, it actually helps level the load curve, because demand is so much higher during the day than at night, and particularly if you have a lot of nuclear in the mix, solar will reduce the need for peaking generatioAs long as solar is a relatively small part of the mix, it actually helps level the load curve, because demand is so much higher during the day than at night, and particularly if you have a lot of nuclear in the mix, solar will reduce the need for peaking generatioas solar is a relatively small part of the mix, it actually helps level the load curve, because demand is so much higher during the day than at night, and particularly if you have a lot of nuclear in the mix, solar will reduce the need for peaking generation.
«Once you get customers thinking about peak load as a concept, then you can introduce a dynamic pricing program, which perhaps gets you deeper savings,» he said.
This is particularly relevant for power systems where the peak load is expected to increase at the same time as conventional power plants to be replaced by intermittent renewable power generation.
It reflects the changes in the demand for electricity resulting from a utility DSM program that is in effect at the same time the utility experiences its annual peak load, as opposed to the installed peak load reduction capability (i.e., potential peak reduction).
The call for tenders specifies the total amount of capacity required, the time lines for capacity establishment, the fuel options as defined in the Government's power plant establishment plan, the type of plant (base load, load following, peaking capacity), possible transmission constraints that have to be taken into account, and in certain cases a price cap, i.e. maximum average price that the new plant can be expected to earn throughout its economic life.
(Sec. 144) Requires: (1) each load - serving entity or state to determine and publish peak demand reduction goals for any load - serving entity that has an applicable baseline in excess of 250 megawatts; (2) the Secretary to develop a system and rules for measurement and verification of demand reductions; (3) such goals to provide that such entities will reduce or mitigate peak demand by a minimum percentage amount from the applicable baseline to a lower peak demand during 2012 and 2015; (4) such goals to provide that the minimum percentage reductions established as peak demand reduction goals shall be the maximum reductions that are realistically achievable with an aggressive effort to deploy Smart Grid and peak demand reduction technologies and methods; and (5) each load - serving entity to prepare a peak demand reduction plan that demonstrates its ability to meet applicable goals.
It is NOW that the supposed «greenhouse issues» should be removed, being unrealistic in the «inferences» they have presented to begin with, or there WILL be Uranium installed as the major backbone Peak Load generation fuel with the Metal Wire grid.
The load grew into the coal resources and offpeak prices were set by gas units who» se price delta was not as big compared to the peak value.
But not managed this will become a grid disruptive issue and for those that can't afford solar, will drive prices up as the smaller number of residual full - grid users pay more per user for the grid's gold plating derived from coping with peak air - con load a few times per year.
«Accordingly, as we concluded in D.P.U. 10 - 54, at 229 - 230, the Cape Wind facility will produce far greater benefits in terms of its: (1) contribution to narrowing the projected gap between supply and demand of renewable resources; (2) contribution to compliance with GWSA emission reductions requirements; (3) contribution to fuel diversity; (4) price suppression effects; (5) ability to act as a hedge against future fuel price increases and volatility; (6) contribution to system reliability; and (7) ability to moderate system peak load.
This finding will need to be reexamined as the results of higher - wind - penetration studies — in the range of 25 % to 30 % of peak balancing - area load — become available.
I believe renewable energy decisions should be made at State and local levels — looking for the «right fits» that make sense (i.e., peaking loads, as the Forbes article on Georgia discussed).
It is significant that both projects are in competitive wholesale markets where they can sell services such as frequency regulation, peak load shaving, or electric capacity (except in Texas, where the absence of a capacity market takes that revenue opportunity off the table).
That could mean that electricity demand in most U.S. regions will peak in the winter — not during the summer as it does now — if no efforts actively manage loads.
The rapid growth came as lawmakers wrestled with how to deal with the solar incentive policy, which required revision when rooftop solar capacity reached 3 % of peak load.
«An aggregated fleet of vehicles or chargers can act as a [demand response] resource, shifting load in response to price signals or operational needs; for example, vehicle charging could be shifted to the middle of the day to absorb high levels of solar generation and shifted away from evening hours when solar generation disappears and system net load peaks
While we can expect that PV will likely be cheaper in the future, solar updraft towers could provide an economically - viable alternative to «PV + energy storage» for peak load (as solar updraft towers can store thermal energy in the ground for night electricity production to greatly reduce intermittency at minimal additional cost).
A zero net energy building merges highly energy - efficient building construction, state - of - the - art appliances and lighting systems, and high performance windows to reduce a building's load and peak requirements and can include on - site solar water heating and renewable energy, such as solar photovoltaic, to meet remaining energy needs.
They are both dependable and flexible and unlike nuclear are capable of providing peak as well as base load.
The first sites, on buildings in the Riverside and San Bernardino counties, could be operational as early as August - not a moment too soon for the region's always beleaguered peak load capacity.
The fuel cell powers the electric motors and charges the batteries, and the batteries help to meet the peak power demands - such as when accelerating under load.
As a result of the high temperatures today, it is expected that the state's peak load will be 32,400 MWs, approaching the record set on July of 2013 of 33,955 MWs.
After testing several options over four years, BGE decided to offer the peak time rebate as its standard tariff for residential customers with smart meters, said Ruth Kiselewich, director of BGE's demand side management programs, during a presentation hosted by the Peak Load Management Associatpeak time rebate as its standard tariff for residential customers with smart meters, said Ruth Kiselewich, director of BGE's demand side management programs, during a presentation hosted by the Peak Load Management AssociatPeak Load Management Association.
As to loading software into memory constituting a violation of copyright, see MAI Systems Corp v. Peak Computer Inc (1993) 991 F. 2d 511 (defendant, who was not a licensee in relation to software, ran software and in doing so created copies of the software in memory; the person was purportedly authorised by a licensee to do so, but the licensee did not have the right to so authorise the defendant).
It features a peak power delivery of 15W (5V / 3A) which is in line with other standards, but Samsung seems to be quite conservative with its charging times — this is particularly evident when charging under load, as the charging rate becomes nearly linear, and has the slowest charging rate out of all devices we've tested for this article.
Regardless, for a system as high - powered as the PS4 is, it is pretty miserly with peak loads hitting 130 - 150 watts.
a b c d e f g h i j k l m n o p q r s t u v w x y z