Sentences with phrase «backup generator system»

Not exact matches

And there is some somewhat alarming language that talks about, and I'll just quote «the IAEA tells us the earthquake triggered a power failure at the Fukushima Daiichi unit 2 nuclear power plant, and then when a backup generator also failed, the cooling system was unable to supply water to cool the reactor.
The system enables large - bore, multi-cylinder engines used in trains, pipelines, backup diesel generators and other fields to run efficiently while producing lower levels of harmful emissions than they do currently.
Regardless, FIFA requires its stadiums to be equipped with backup power supplies such as generators and uninterruptible power supply systems (UPS) that can provide electricity for up to three hours.
4 slide out rooms, all electric coach, full rear bath and a side half bath, heated tile floor, full body paint, Onan 10kw diesel generator on a slide out tray, 3 ducted roof a / c units with a heat pump, fireplace, stackable washer and dryer, automatic leveling jacks, backup camera with side vision cameras, fireplace, dishwasher, leather swivel chair, air comfort king bed, in motion satellite dish, residential refrigerator with an icemaker, power inverter, navigation system, dinette with 4 chairs, attic fans, exterior TV, 3 interior TV's, exterior metal slide out storage tray, heated power mirrors, vacuum system, power windshield shades, aluminum wheels, air horns, Michelin tires, fiberglass exterior roof, factory made cabinets and exterior doors, much more!!!
It's described as an «off - grid home solar system in a box,» and it could be a much safer option for home backup power than a gas generator.
Companies get paid a lot of money to crank up operations when there's too much power in the system and to turn off consumption and fire up their backup generators when there's too little.
Beyond about 5 % of installed wind and solar capacity backup generators and / or storage is required — with considerable impact on system costs.
Development of high voltage direct current cables and transmission systems — Although initial loss of electricity of DC cables is higher than for AC, there is no incremental loss of electricity as the length of the cable increases, making it possible to build offshore wind farms in very windy areas and transmit the energy over vast distances to areas with poor wind regimes, and to combine wind generators from different areas to reduce the impact of low - wind days and the need to use backup hydrocarbons on those days
At a certain point, the required devices are so much bigger than the personal versions that the language used to describe them moves from solar charger to solar «generator,» and these larger systems could be a viable alternative to a gas generator for backup / emergency power or for off - grid use.
Small - scale energy storage, the technology used in solar - plus - storage systems, can also be charged with electricity from the grid to provide backup power without the use of a diesel - powered backup generator.
The facility is ISO 27001 - certified for its physical and environmental controls, and includes critical environmental control features such as backup generators, state - of - the - art fire suppression and water - detection systems.
Tags for this Online Resume: commercial electrician, electrical foreman, lutron lighting control tec, generator controls, ups / backup systems, 480 volt transformers, commercial electrician / foreman
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction
a b c d e f g h i j k l m n o p q r s t u v w x y z