Automatic transmission specialist Antonov reports that its comparative studies of an electric vehicle equipped with its multi-speed transmission over eight different drive cycles suggest that the transmission delivers typically 10 %
better cycle efficiency than a single - speed solution.
Not exact matches
However, total factor productivity, which allows for changes in both labour and capital inputs into the production process, and is therefore a
better measure of
efficiency, is growing faster in the current recovery than in the corresponding phases of either of the two previous
cycles (Box 2).
Winemakers Share
Best Practices and Equipment That Contribute to
Efficiency in the Cellar: The first quarter is arguably one of the busiest periods in the annual
cycle for winemakers and their cellar teams.
«The overall sun - to - electricity
efficiency of the hydricity process, averaged over a 24 - hour
cycle, is shown to approach 35 percent, which is nearly the
efficiency attained by using the
best photovoltaic cells along with batteries,» Gençer said.
Elena Berger, 2011 - 12 Fellow in the Office of Energy
Efficiency and Renewable Energy (EERE), Office of International Affairs, said, «The tour allowed me to
better appreciate the significance of NREL as a lab that operates throughout the whole innovation
cycle, from basic R&D to commercialization.»
It demonstrated
good electrochemical properties and underwent 150 charge / discharge
cycles without any notable loss of
efficiency.
In order to study the different configurations of RWH, the following methodologies were used: exergy analysis and exergetic
efficiency analysis to determine resource consumption and
efficiency; life
cycle assessment (LCA) to identify environmental impacts; life
cycle costing (LCC) to find economic feasibility, and data envelopment analysis (DEA) to identify the frontiers of
best - practice towards sustainability.
The biggest change, however, is that the 4.0 L V - 6 has been replaced with an Atkinson -
cycle 3.5 L V - 6 with port and direct fuel injection for
better efficiency and more power.
On the flipside, thanks to the temporary high - compression
cycle,
efficiency is
better than ever before, seeing a 35 percent boost in combined MPG when compared to the outgoing QX50, and ostensibly the most efficient non-hybridized CUV in the segment with 27 combined mpg for the front - wheel - drive model.
Rated at 278 hp and 265 lb - ft of torque, it features direct and port injection, variable valve timing with intelligent wider intake — which means it uses the Atkinson
cycle at cruising speed for
better fuel
efficiency and switches back to Otto -
cycle when torque is necessary — and variable valve timing with intelligent exhaust.
The 1NR, 2NR, 3NR, 4NR, 5NR, 6NR, and 7NR engines have Dual VVT - i standard and the 8NR engine has VVT - iW, enabling it to operate in the Otto
cycle as
well as a modified - Atkinson
cycle to improve thermal
efficiency.
The turbocharged and direct - injection powerplant uses an innovative modification to the conventional four - stroke
cycle to offer an improved combination of power,
efficiency and responsiveness, delivering an impressive 184 horsepower and 221 lb - ft of torque, as
well as a respectable highway fuel economy of 27 mpg.
It uses the Atkinson
cycle for
better efficiency and lower emissions, and it's mated to either a standard six - speed manual or an available six - speed automatic.
The turbocharged 2.0 - liter I4 engine can switch between the Otto and Atkinson
cycles for
better efficiency (you can't tell when the switch is happening, of course), and its 241 horses pull quite
well under most driving conditions.
This mid-sizer's 2.5 - litre four - cylinder gasoline engine was modified to run on the Atkinson
cycle, which keeps the intake valves open longer for
better thermal
efficiency, making a modest 156 horsepower and 136 lb - ft of torque.
While a larger displacement Atkinson
cycle engine may offer less top - end horsepower than a traditional Otto internal combustion engine, its increased thermal
efficiency allows for strong acceleration and
better fuel economy, Saga said.
Furthermore, diesel already has high part - load
efficiency, much
better than gasoline Otto -
cycle engine, so, adding a hybrid drive train to a diesel won't improve
efficiency as much as adding hybrid to a gasoline engine.
The weight loss has also significantly helped the Maruti Suzuki Swift, improve its fuel
efficiency and as per the ARAI test
cycle, the petrol version now delivers 22kpl (improvement of 7 %) and the diesel 28.4 kpl (12 %
better).
Helping with its
efficiency and
cycle reduction targets it plans to improve from 70 % of
wells being drilled from existing pads to 85 % in 2014 in Eagle Ford.
Energy
efficiency and reducing reliance on coal for electricity generation not only reduces emissions of greenhouse gases, but also reduces emissions of fine particles which cause many premature deaths worldwide as
well as reducing other health impacts from the coal fuel
cycle.
The combined
cycle can take advantage of higher temperatures of the flue gases as
well and trough that reach a higher
efficiency.
Variation across gas plants is less, though still substantial, with the
best combined -
cycle plants having nearly twice the
efficiency (and hence roughly half the damages) of typical steam or centralized turbine plants, and lower damages even than the cleanest coal - fired plants.
They test the installed equipments and network for operational
efficiency throughout its life
cycle, handle software coding tasks; Also, they look after the installation, operational, maintenance and troubleshooting functions as
well.
HIGHLIGHTS •
Well versed with full lifecycle of the software design process • Unmatched talent in conducting systems analysis with a view to improving operations in application codes • Focused on effectively executing full cycle software development by writing well - designed, testable and efficient code • Demonstrated expertise in integrating new software components into fully functional software systems • Highly skilled in modifying existing software to correct errors with a view to help it adapt to new hardware or to increase its effici
Well versed with full lifecycle of the software design process • Unmatched talent in conducting systems analysis with a view to improving operations in application codes • Focused on effectively executing full
cycle software development by writing
well - designed, testable and efficient code • Demonstrated expertise in integrating new software components into fully functional software systems • Highly skilled in modifying existing software to correct errors with a view to help it adapt to new hardware or to increase its effici
well - designed, testable and efficient code • Demonstrated expertise in integrating new software components into fully functional software systems • Highly skilled in modifying existing software to correct errors with a view to help it adapt to new hardware or to increase its
efficiency
IT Project Manager — Professional Highlights Serve multinational corporations in a variety of technology based strategic planning and administration roles Offer expertise as a consultant, programmer, engineer, business analyst, and database administrator Lead technology projects for NASA, U.S. Customs, American Express, and General Electric Design and implement reporting, customer service, marketing, sales, and financial management software Responsible for network and database design, administration, and security Oversee enterprise - wide hardware and software upgrades resulting in increased
efficiency Minimize operational and manpower costs through effective technology solutions Serve as forecast budget analyst for Joint Project Management Operations at Kennedy Space Center Develop reporting application tool using crystal reports engine on CD throughout Kennedy Space Center and Cape Canaveral Air Station resulting in $ 500,000 savings on user licensing fees Create detailed project plan with
well - defined tasks, milestones, client sign - offs, test
cycles, and specifications which served to communicate project progress to management Develop visual basic application for financial banking Institution using crystal reports to reduce the company's response time resulting in initial reporting from 2 - 3 hours to just 45 seconds Oversee multimillion - dollar software implementation for Miami Air from a consultancy level Upgrade Great Plains software platform and administered security access for Miami internal databases Write over 200 SQL stored procedures from access databases for financial institutions Compose business correspondence and prepared statistical spreadsheet analysis for Kennedy Space Center Recognized by colleagues and superiors for outstanding job performance, reliability, and
efficiency Conduct surveys of operations to assess needs and identify high priority improvements Complete major product releases meeting very aggressive schedules and budgets Serve as a member of the International Cyber Threat Task Force Utilize fluencies in English, Portuguese, Arabic, French, and German to communicate with a diverse clientele Continually study emerging technologies and industry
best practices Perform all duties with positivity, professionalism, and integrity
This year, the conference will focus on technologies and
best practices to help the industry weather economic
cycles by improving
efficiencies and reducing costs.