The TEPCO operators
of the stricken nuclear
power plant — a minimal staff
of 50 as all non-essential personnel have been evacuated — now face a balance
between venting the steam building up in the reactor (since the main danger for a widespread release
of radioactive material is steam
bursting the thick steel container holding the reactor) and keeping any radioactive materials inside the
power plant itself.