Not exact matches
Construction is underway for a new
phase of development at the 650 - acre Westcott Venture Park site, located
between Aylesbury and Bicester.
The publication today
of the 211 - mile northern
phase two route
of HS2, follows the confirmation a year ago
of HS2's 140 - mile southern
phase one route
between London and Birmingham, which starts
construction in four years and opens to passengers in 13 years.
Parliament approved the $ 17 million loan
between government and HSBC bank
of the United Kingdom for the
construction of the first
phase of the project.
Background: The City Department
of Transportation is currently in the planning
phase of a major rehabilitation
of a 1.5 mile segment
of the Brooklyn - Queens Expressway
between Atlantic Avenue and Sands Street, and has warned that if
construction is not finished by 2026 roughly 15,000 trucks will have to be redirected onto local streets each day.
This initial
phase, which is funded with the TIFIA Loan, includes (i) the
construction of two reversible lanes with associated exit / entrance ramps
between Valley View Lanes and Turbeville Road; (ii) the
construction of managed lanes from south
of IH35E — IH635 interchange to Valley View Lane; (iii) reconfiguration and rehabilitation
of general purpose lanes from IH635 to Corinth Parkway; (iv) the
construction of direct connectors to Sam Rayburn Tollway; (v) the reconfiguration and / or widening
of general purpose lanes and the
construction of an additional general purpose lane in each direction from Sam Rayburn Tollway to US380; (vi) the
construction, reconstruction, widening or rehabilitation
of various frontage roads, interchanges, and bridges; (vii) the
construction of a collector - distributor system
between President George Bush Turnpike and Sam Rayburn Tollway; (viii) the
construction of a new bridge and re-purposing
of the existing bridge over Lake Lewisville; and (ix) associated mitigation projects.
Construction of a new barge landing area and elevated bridge and boardwalks will improve visitor and employee safety by reducing the risk
of human - bear conflicts; provide safe and dependable access for the
phased relocation
of facilities and park concession operations; protect and enhance key park resources in the Brooks River area, including brown (grizzly) bears, salmon and trout, and cultural resources; improve visitor experience in the area; and connect infrastructure utilities
between the Valley Road Administrative Area and the north side
of Brooks River.
After World War 2, in a new
phase of economic expansion for San Miguel, the locomotives came back into use, this time to help with the
construction of the road from the fort
of San Brás to Calheta,
between 1948 and 1954.
WHILE WE WORK operates as a storyteller and as a score that oscillates
between the liveness and the memory
of Agora's work in relation to their building — a space in constant mutation, where working
phases and changes
of plans are part
of its daily
construction, as well as the multiple informations, stories and rumours that have been circulating.
Construction soon will commence on the first
phase of the Hudson Highlands Fjord Trail, an off - road route
between Beacon and Cold Spring that will provide safe access to trails in Hudson Highlands State Park Preserve.
That's because FF is drawing a distinction
between «
Phase 2
of Stage 1» to construct a smaller facility so the company can begin production
of its first vehicle, the FF91, «as soon as possible,» and «Stage 2»
of the manufacturing project, which involves the
construction of a 3 - million - square - foot facility.
LIBERTY, Mo. — A joint venture
between Action Pact, Liberty Hospital and Healthy Living Centers
of America has completed
Phase II
construction at Norterre, a continuing care retirement community (CCRC)...