In the Unit 1 power block area,
boilermakers continue to weld the interconnecting boiler pipe and wall panels.
Unit 2 In the Unit 2 power block area,
boilermakers continue welding the interconnecting boiler pipe and wall panels.
Not exact matches
In early betting, a majority of tickets are on the
Boilermakers but the line
continues to climb.