Provide
building cost estimates to Salesmen for remodeling projects ranging in size from $ 5K to $ 150K.
Base your home's
building cost estimates on your architectural plans, accurately estimate materials and labor needed, and lock in quotes for all materials.
After skewering the proposed system («one of the most expensive per mile and one of the slowest in the world»), Musk issued an open - source design challenge: a 28 - passenger solar - powered pod capable of levitating through a system of tubes almost at the speed of sound, with a one - way ticket price of $ 20 and a total
building cost estimated at $ 6 billion, less than a tenth of the budget for California's high - speed rail project.
Not exact matches
Important factors that could cause actual results to differ materially from those reflected in such forward - looking statements and that should be considered in evaluating our outlook include, but are not limited to, the following: 1) our ability to continue to grow our business and execute our growth strategy, including the timing, execution, and profitability of new and maturing programs; 2) our ability to perform our obligations under our new and maturing commercial, business aircraft, and military development programs, and the related recurring production; 3) our ability to accurately
estimate and manage performance,
cost, and revenue under our contracts, including our ability to achieve certain
cost reductions with respect to the B787 program; 4) margin pressures and the potential for additional forward losses on new and maturing programs; 5) our ability to accommodate, and the
cost of accommodating, announced increases in the
build rates of certain aircraft; 6) the effect on aircraft demand and
build rates of changing customer preferences for business aircraft, including the effect of global economic conditions on the business aircraft market and expanding conflicts or political unrest in the Middle East or Asia; 7) customer cancellations or deferrals as a result of global economic uncertainty or otherwise; 8) the effect of economic conditions in the industries and markets in which we operate in the U.S. and globally and any changes therein, including fluctuations in foreign currency exchange rates; 9) the success and timely execution of key milestones such as the receipt of necessary regulatory approvals, including our ability to obtain in a timely fashion any required regulatory or other third party approvals for the consummation of our announced acquisition of Asco, and customer adherence to their announced schedules; 10) our ability to successfully negotiate, or re-negotiate, future pricing under our supply agreements with Boeing and our other customers; 11) our ability to enter into profitable supply arrangements with additional customers; 12) the ability of all parties to satisfy their performance requirements under existing supply contracts with our two major customers, Boeing and Airbus, and other customers, and the risk of nonpayment by such customers; 13) any adverse impact on Boeing's and Airbus» production of aircraft resulting from cancellations, deferrals, or reduced orders by their customers or from labor disputes, domestic or international hostilities, or acts of terrorism; 14) any adverse impact on the demand for air travel or our operations from the outbreak of diseases or epidemic or pandemic outbreaks; 15) our ability to avoid or recover from cyber-based or other security attacks, information technology failures, or other disruptions; 16) returns on pension plan assets and the impact of future discount rate changes on pension obligations; 17) our ability to borrow additional funds or refinance debt, including our ability to obtain the debt to finance the purchase price for our announced acquisition of Asco on favorable terms or at all; 18) competition from commercial aerospace original equipment manufacturers and other aerostructures suppliers; 19) the effect of governmental laws, such as U.S. export control laws and U.S. and foreign anti-bribery laws such as the Foreign Corrupt Practices Act and the United Kingdom Bribery Act, and environmental laws and agency regulations, both in the U.S. and abroad; 20) the effect of changes in tax law, such as the effect of The Tax Cuts and Jobs Act (the «TCJA») that was enacted on December 22, 2017, and changes to the interpretations of or guidance related thereto, and the Company's ability to accurately calculate and
estimate the effect of such changes; 21) any reduction in our credit ratings; 22) our dependence on our suppliers, as well as the
cost and availability of raw materials and purchased components; 23) our ability to recruit and retain a critical mass of highly - skilled employees and our relationships with the unions representing many of our employees; 24) spending by the U.S. and other governments on defense; 25) the possibility that our cash flows and our credit facility may not be adequate for our additional capital needs or for payment of interest on, and principal of, our indebtedness; 26) our exposure under our revolving credit facility to higher interest payments should interest rates increase substantially; 27) the effectiveness of any interest rate hedging programs; 28) the effectiveness of our internal control over financial reporting; 29) the outcome or impact of ongoing or future litigation, claims, and regulatory actions; 30) exposure to potential product liability and warranty claims; 31) our ability to effectively assess, manage and integrate acquisitions that we pursue, including our ability to successfully integrate the Asco business and generate synergies and other
cost savings; 32) our ability to consummate our announced acquisition of Asco in a timely matter while avoiding any unexpected
costs, charges, expenses, adverse changes to business relationships and other business disruptions for ourselves and Asco as a result of the acquisition; 33) our ability to continue selling certain receivables through our supplier financing program; 34) the risks of doing business internationally, including fluctuations in foreign current exchange rates, impositions of tariffs or embargoes, compliance with foreign laws, and domestic and foreign government policies; and 35) our ability to complete the proposed accelerated stock repurchase plan, among other things.
Contractors routinely go back to their clients with demands for more money to cover unexpected complexities in the
building process; Gillam has set up rigorous risk - management systems to provide more accurate
cost estimates.
Based on Trump's 2017 budget request for $ 2.6 billion to plan, design and
build 75 miles of wall, Democratic Senator Claire McCaskill's office
estimated the per - mile
cost would be about $ 37 million, or nearly $ 67 billion for the entire 2,000 - mile border.
Gergawi said studies
estimated the technique could cut
building time by 50 to 70 percent and labor
costs by 50 to 80 percent.
Bombardier said it turned over the Delta sales contract but can not accurately
estimate the
cost and price of those planes because they are being
built and delivered in coming years.
Back when Verizon was thinking about getting into Canada, Bay Street analysts
estimated a nationwide network would
cost at least $ 1 billion to
build.
With the
estimated cost of the project as high as $ 12 billion, including as much as $ 10 billion for cement, the contract would likely be a huge win for a local
building company.
The report also describes a web of fees that have not been coordinated between city departments, so tangled that not even local architects, engineers, and developers can always accurately
estimate how much it will
cost to
build.
But
estimates for the
cost to
build a 360 - mile rail, which is in the middle of the range the company is targeting, have come in around $ 24 billion.
Trump's central campaign promise, as you know, is to
build a «big, beautiful, powerful wall» along the U.S. - Mexico border, which analysts at investment firm Bernstein
estimate could
cost anywhere between $ 15 billion and $ 25 billion, requiring 7 million cubic metres of concrete and 2.4 million tonnes of cement, among other materials.
The unique, «scavenger hunt» - like contest attracted an
estimated 1,300 individuals at participating locations who learned and then were quizzed about key investing topics: financial fraud,
building a nest egg, selecting financial advisers, and the
cost of investment fees.
But the
building cost had gone over budget by at least $ 130 million, and in order to pay for the remaining equipment, SolarCity would need to pony up an
estimated $ 200 million of its own, according to people familiar with the matter.
When that happens, the world will be watching, and not just for the promised sustainability — Quay Valley also plans to feature the world's first working Hyperloop,
built by Hyperloop Transportation Technologies at an
estimated cost of $ 100 million to $ 150 million.
In July 2014, B.C. Hydro defended that number, claiming «there are contingencies that are
built into the
cost estimate.
Richmond - based MHGroup, a biotechnology firm, has signed a memorandum of understanding with Vietnam's Minh Hung Group and the U.S.'s Avure Technologies, Inc. to
build a high - pressure processing (HPP) plant in Vietnam, which is
estimated to
cost US$ 22.03 million.
Tax cuts always effect assets prices, regulations are
estimated to account for up to 35 % of
building new construction
costs for homes in some locations and though federal deregulation may not impact local regulations as much it does have a multiplier effect on the economy just like a tax cut does and anticipation of an infrastructure plan the scale of this administration's, though it hasn't been passed, would also have an anticipatory effect on leading indicators like stocks and other commodities that raise
costs, which we have already seen.
In another he pillories the jerry - builder who scamps his foundations; and in yet another he notes the importance of drawing up an
estimate before operations begin: «Would any of you think of
building a tower without first sitting down and calculating the
cost, to see whether he could afford to finish it?»
DFP will be
built on 48 million square feet within DWSC, which is reported to be the world's largest wholesale hub occupying 550 million square feet that will be completed over a ten - year period with an
estimated cost of $ 8.2 bn.
Costs have been
estimated at # 400 - 450 million, but could rise as high as # 800 million due to complexities in the
build on what is compact land footprint, and local infrastructure requirements.
The
cost of the
building is
estimated at $ 11.2 million.
The new
building was
estimated to
cost between $ 4.5 million and $ 8.5 million, with completion about August 2015.
At a
cost estimated at about $ 3 million, according to Tayler, the plans to
build a leisure - style water park is the largest project the park district has tackled since opening the 90 - acre, $ 1.6 million Ron Beese Park on the south end of town in 1992.
That
building is
estimated to
cost $ 20 million.
Lunardini
estimated the
cost of a new
building at about $ 4.5 million, but noted the
costs would be shared by the village, the library and the Fox Valley Park District, which had agreed to pay rent at the centYer.
The two boards then settled on a plan that would have the Park District
building on land it owns at an
estimated cost of $ 4 million.
Park District officials said they hope to
build on land the district already owns at an
estimated cost of $ 4 million.
The funding is contingent on the Arlington Skate Committee finding a location and securing enough funds to
build the facility, which is
estimated to
cost $ 50,000 to $ 85,000.
The Elk Grove Park District is looking at
building a 13,000 - square - foot skate park at an
estimated cost of $ 660,000 at Audubon Park.
A 45,500 - square - foot facility, the committee
estimates, would
cost about $ 6.6 million to
build.
The Joliet - based charitable foundation
estimates the park would
cost about $ 6,000 to
build.
His initial annoyance was followed rapidly by incredulity and outrage as the park system horror stories mounted, including a construction budget for a single fieldhouse that escalated from an initial
estimate of $ 950,000 to more than $ 2 million and a Washington Park waterslide that was carelessly
built too close to a pool and will
cost $ 100,000 to correct.
Park district officials
estimate the interpretive center alone could
cost $ 579,000 to $ 630,000, depending on whether it is
built with stone in addition to wood and glass.
Officials
estimated it would
cost $ 9 million to $ 11 million to update the existing community center in the old North School
building.
The design work for the
building is
estimated to
cost up to $ 650,000, and the construction could
cost anywhere from $ 7 million to $ 10 million, depending on the specific plans, said Gary Major, director of the Parks and Recreation Department.
Unit overheads were
estimated through the same finance departments for all settings and covered management and administrative
costs, operational
costs (including heating and lighting, training,
building maintenance), indirect overheads (including personnel and finance functions), and capital
costs based on the new
build and land requirements of NHS facilities, accounting for unit occupancy rates.
The initial startup
cost - to buy equipment and
build about a dozen collapsible miniature storefronts - was
estimated at about $ 7,000.
He
estimated the center could be
built for $ 10.5 million, but said this did not include the
cost of the land.
The
building of a new oil refinery capable of processing 120,000 barrels per day, at an
estimated cost of $ 2.8 billion (Sh138 billion).
Below is the testimony that Reinvent Albany submitted to the Empire State Development Authority in which we ask ESD to «Ensure that scoping documents
estimate the full
cost to state and local taxpayers, and the value to the businesses
building the project, of each development scenario and each part of each scenario.»
[139] The Hope City project is expected to be completed in 2016 and is
estimated to
cost $ US 10 billion in construction; [139] and one of its towers will become Africa's tallest
building.
The Group is expected to collaborate with the Ministries of Education and Health to
build and establish the Ghana campus of the Gulf Medical University and the Thumbay Teaching Hospital in the Greater Accra Region, in phases over a period of 5 to 8 years, at an
estimated cost of $ 600 million.
Plus, Kehoskie said, town isn't asking the state for $ 500,000, the full
estimated cost of
building museum.
· The
cost of
building the new LIRR terminal below Grand Central Terminal accounts for more than one - quarter of the
cost overrun, having grown from the MTA's initial
estimate of $ 709 million to $ 1.9 billion, an increase of 170 percent.
The 87 - page report
estimated a bridge, tunnel or combination of the two across the Sound would
cost as much as $ 55.4 billion to
build.
Total work on that
building will
cost an
estimated $ 13.2 million.
According to the Public Accounts Committee, they
cost twice as much to
build as the government first
estimated and are failing to deal with the shortage in classroom places.
Additionally, the 9BS Group has offered to
build three solar - powered mechanised boreholes at locations to be identified by the JAK Foundation, at the
estimated cost of GHc 240, 000.