We call for an equitable participation of women, young scientists, and minority groups in the practice and application of science, also through capacity -
building programmes addressed to young scientists.
Not exact matches
The project is part of the Church's renewal and reform
programme which aims to
build on the three goals - set by General Synod in 2010 - to
address some of the deep - rooted missional challenges facing the Church of England.
The
programme was established in 2011 to
address the needs of school
buildings in the worst condition.
The Priority School
Building Programme is a government
programme set up to
address the condition of the schools most in need of urgent repair.
This analytical report
builds on the first volume and communicates experiences of selected Least Developed Countries (LDCs) in
addressing adaptation through National Adaptation
Programmes of Action (NAPAs) and other adaptation initiatives.
Schools could also seek advice and training in well - validated
programmes to
address behavioural and emotional needs, for example, the Incredible Years — Teacher Classroom Management
programme as a means of preventing the emergence of behavioural difficulties; FRIENDS for Life as a means of preventing anxiety and
building resilience, or similar evidence - based
programmes.
The
programme aims to empower students and staff through a holistic and peer - led approach by engaging them to change the attitudes, behaviours, and culture of bullying by
building skills and confidence to
address different situations, both online and offline.