A number of metal roof systems were developed post war
by aircraft manufacturers, specifically for schools and consisted of flat aluminium sheets riveted to aluminum spars.
Not exact matches
Important factors that could cause actual results to differ materially from those reflected in such forward - looking statements and that should be considered in evaluating our outlook include, but are not limited to, the following: 1) our ability to continue to grow our business and execute our growth strategy, including the timing, execution, and profitability of new and maturing programs; 2) our ability to perform our obligations under our new and maturing commercial, business
aircraft, and military development programs, and the related recurring production; 3) our ability to accurately estimate and manage performance, cost, and revenue under our contracts, including our ability to achieve certain cost reductions with respect to the B787 program; 4) margin pressures and the potential for additional forward losses on new and maturing programs; 5) our ability to accommodate, and the cost of accommodating, announced increases in the build rates of certain
aircraft; 6) the effect on
aircraft demand and build rates of changing customer preferences for business
aircraft, including the effect of global economic conditions on the business
aircraft market and expanding conflicts or political unrest in the Middle East or Asia; 7) customer cancellations or deferrals as a result of global economic uncertainty or otherwise; 8) the effect of economic conditions in the industries and markets in which we operate in the U.S. and globally and any changes therein, including fluctuations in foreign currency exchange rates; 9) the success and timely execution of key milestones such as the receipt of necessary regulatory approvals, including our ability to obtain in a timely fashion any required regulatory or other third party approvals for the consummation of our announced acquisition of Asco, and customer adherence to their announced schedules; 10) our ability to successfully negotiate, or re-negotiate, future pricing under our supply agreements with Boeing and our other customers; 11) our ability to enter into profitable supply arrangements with additional customers; 12) the ability of all parties to satisfy their performance requirements under existing supply contracts with our two major customers, Boeing and Airbus, and other customers, and the risk of nonpayment
by such customers; 13) any adverse impact on Boeing's and Airbus» production of
aircraft resulting from cancellations, deferrals, or reduced orders
by their customers or from labor disputes, domestic or international hostilities, or acts of terrorism; 14) any adverse impact on the demand for air travel or our operations from the outbreak of diseases or epidemic or pandemic outbreaks; 15) our ability to avoid or recover from cyber-based or other security attacks, information technology failures, or other disruptions; 16) returns on pension plan assets and the impact of future discount rate changes on pension obligations; 17) our ability to borrow additional funds or refinance debt, including our ability to obtain the debt to finance the purchase price for our announced acquisition of Asco on favorable terms or at all; 18) competition from commercial aerospace original equipment
manufacturers and other aerostructures suppliers; 19) the effect of governmental laws, such as U.S. export control laws and U.S. and foreign anti-bribery laws such as the Foreign Corrupt Practices Act and the United Kingdom Bribery Act, and environmental laws and agency regulations, both in the U.S. and abroad; 20) the effect of changes in tax law, such as the effect of The Tax Cuts and Jobs Act (the «TCJA») that was enacted on December 22, 2017, and changes to the interpretations of or guidance related thereto, and the Company's ability to accurately calculate and estimate the effect of such changes; 21) any reduction in our credit ratings; 22) our dependence on our suppliers, as well as the cost and availability of raw materials and purchased components; 23) our ability to recruit and retain a critical mass of highly - skilled employees and our relationships with the unions representing many of our employees; 24) spending
by the U.S. and other governments on defense; 25) the possibility that our cash flows and our credit facility may not be adequate for our additional capital needs or for payment of interest on, and principal of, our indebtedness; 26) our exposure under our revolving credit facility to higher interest payments should interest rates increase substantially; 27) the effectiveness of any interest rate hedging programs; 28) the effectiveness of our internal control over financial reporting; 29) the outcome or impact of ongoing or future litigation, claims, and regulatory actions; 30) exposure to potential product liability and warranty claims; 31) our ability to effectively assess, manage and integrate acquisitions that we pursue, including our ability to successfully integrate the Asco business and generate synergies and other cost savings; 32) our ability to consummate our announced acquisition of Asco in a timely matter while avoiding any unexpected costs, charges, expenses, adverse changes to business relationships and other business disruptions for ourselves and Asco as a result of the acquisition; 33) our ability to continue selling certain receivables through our supplier financing program; 34) the risks of doing business internationally, including fluctuations in foreign current exchange rates, impositions of tariffs or embargoes, compliance with foreign laws, and domestic and foreign government policies; and 35) our ability to complete the proposed accelerated stock repurchase plan, among other things.
The Georgia Nuclear
Aircraft Laboratory was built in the 1950s as a radiation testing ground
by the Air Force and weapons
manufacturer Lockheed.
He also stuck with a target for Airbus to deliver 800
aircraft this year, saying he was encouraged
by upbeat comments
by U.S.
manufacturer United Technologies Corp (UTC).
«We have already virtually tested an initial concept of the Hyperloop,» said Sandeep Sovani, director of automotive and ground transportation industry at ANSYS, using simulation technology used today
by major
manufacturers of
aircraft, rockets, trains and automobiles.
A $ 220 million state aid package for Sikorsky
Aircraft, if approved
by the General Assembly and unionized workers, will stave off the loss of one of Connecticut's most prized
manufacturers, Gov. Dannel P. Malloy said Wednesday.
Airbus, the European
aircraft manufacturer, suggests that
by midcentury
aircraft skin could alternate between transparent and opaque, somewhat like today's light - sensitive eyeglasses, giving passengers a wide - angle view of the clouds.
It resembles the Ushakov design, but has telescoping wings and art deco lines more in keeping with the flying boats produced at that time
by German
aircraft manufacturer Dornier.
By TARA PATEL Aerospace
manufacturers are pressing ahead with their plans to develop the next generation of supersonic jetliners despite renewed uncertainty about the environmental impact of exhaust emissions that could ground the high - speed
aircraft.
This spring, he bought a second
aircraft, an A.R. Drone 2.0 with GPS produced
by the French wireless electronics
manufacturer Parrot.
This may be done
by filing with the affidavit an
Aircraft Bill of Sale, AC Form 8050 - 2, or an equal transfer of ownership document for each change of ownership from the UA
manufacturer, builder, or retail vendor to the owner making application for registration.
Messerschmitt, no, not the metal band but the name of the cute three - wheeled bubble car, was developed and sold
by the German
aircraft manufacturer of the same name in the wake of restrictions placed on the company after World War II.
Because of this, turbos have long been recognized
by auto
manufacturers such as Saab for their value, and have been applied in
aircraft engines and even 1000 - hp Formula One cars.
Spyker is a Dutch - based auto company founded
by Victor Muller that has brand connection to the Spyker
aircraft, coachbuilding, and car
manufacturer that was in business from 1880 to 1925.
Engines selected
by Virgin America for use in new Airbus
aircraft will, say the airline, make the craft some of the greenest in the air and to celebrate their arrival the engine
manufacturers are buying carbon offsets for the first 5,000 flights booked on Virgin America today.
I am an EE recently retired from Engineering Flight Test with a major
aircraft manufacturer; an engineer
by interest, education, and temperament.
Whether you assume half the fuel load divided
by the passengers (for a full flight) is the cost or use the
aircraft manufacturer's seat burn numbers you came up with about the same figure.
«Given the substantial lead time for the standards, along with anticipated fuel efficiency gains for new
aircraft types already in development
by manufacturers, the standards will serve primarily to prevent backsliding in emissions,» ICCT said in a statement.
Retained
by general aviation
aircraft manufacturer to handle the experts and fire investigation for litigation surrounding a fatal accident in California.
While this may seem like plenty of time, building a strong case against
manufacturers, airlines and insurance companies often requires intensive investigation of the incident, the damages incurred
by the plaintiff, and complex Florida
aircraft law.
Wichita - based
aircraft manufacturer Hawker Beechcraft, for example, is being advised
by Kirkland & Ellis in its efforts to shore up its balance sheet
by obtaining $ 120 million in additional loans, according to The New York Times.
Successfully defended an
aircraft manufacturer following a 19 - month jury trial; the verdict was upheld on appeal
by the Sixth Circuit Court of Appeals.
Concerns over an arms race were raised several times in the course of the Chatham House conference, which was sponsored
by BAE Systems,
manufacturer of the Taranis autonomous
aircraft, the prime example of a UK precursor to autonomous weapons technology.
Bell, one of the largest
manufacturers of commercial and military vertical takeoff vehicles in the US (it produces both the V - 22 Osprey and the forthcoming V - 280 Valor), said it hopes to have a hybrid electric
aircraft built and ready for flight
by Uber's target demonstration date of 2020.
An
aircraft mechanic is responsible for performing all kinds of tests and repairs
by strictly complying service bulletins and
manufacturer's manual.
Performed Routine Inspections and Trouble Shooting including Airframe Structures, Engines, and
Aircraft Systems Using Approved or Accepted Data issued
by the
Manufacturer or FAA.
Performed technical and economical evaluation of
aircraft systems improvements recommended
by the
manufacturer.
Acting as a technical liaison with
aircraft, component
manufacturers, vendors and overhaul agencies about the overhaul, repair and modification of
aircraft systems and / or components, as required
by airline policy.