An estimation engineer helps senior management professionals
by estimating the cost of projects.
Not exact matches
Actual operational and financial results
of SkyWest, SkyWest Airlines and ExpressJet will likely also vary, and may vary materially, from those anticipated,
estimated,
projected or expected for a number
of other reasons, including, in addition to those identified above: the challenges and
costs of integrating operations and realizing anticipated synergies and other benefits from the acquisition
of ExpressJet; the challenges
of competing successfully in a highly competitive and rapidly changing industry; developments associated with fluctuations in the economy and the demand for air travel; the financial stability
of SkyWest's major partners and any potential impact
of their financial condition on the operations
of SkyWest, SkyWest Airlines, or ExpressJet; fluctuations in flight schedules, which are determined
by the major partners for whom SkyWest's operating airlines conduct flight operations; variations in market and economic conditions; significant aircraft lease and debt commitments; residual aircraft values and related impairment charges; labor relations and
costs; the impact
of global instability; rapidly fluctuating fuel
costs, and potential fuel shortages; the impact
of weather - related or other natural disasters on air travel and airline
costs; aircraft deliveries; the ability to attract and retain qualified pilots and other unanticipated factors.
A report
by the auditor general has found the state government's Pilbara Underground Power
Project will
cost nearly double the original
estimate and be completed six years behind schedule because
of poor planning and management.
Then last February, the governing Liberals created a new regulation to ensure producers pay a lump sum for the actual
cost of waste disposal, rather than a
projected per - unit
cost estimated by Stewardship Ontario.
We also
project that any startup
costs paid
by Mark Cuban (and / or associates) would be paid out
of the initial income received, these
costs are
estimated at $ 1000 per licensee (based on a test
of 100 sites, this drops to $ 500 for 1000 site rollout).
The
project is
estimated to
cost $ 4.7 million, $ 850,000
of which would be covered
by grants, according to the park district.
· Debt service on bonds issued
by the MTA to fund the
cost of East Side Access is
estimated to exceed $ 300 million in 2019 when the
project enters service.
Each capital
project request shall show: recommended priority; development; time schedule;
estimated costs for planning, site
of right
of way, construction, equipment and other features; status
of plans and land acquisition; anticipated effect
of project on annual operating budget; possible sources
of financial aid; recommended expenditures
by years; and such other information as the Budget Director and Commissioner
of Environment and Planning may deem advisable.
The total
cost of the
project is
estimated to be about $ 1.5 billion, half
of which could be paid for
by the federal government.
The
cost of the
project, an original state -
of - the art complex designed
by the architect Enrique Morales, rises up to four times the original 1997
estimate, to a # 195m.
A new
estimated cost for renovations, given
by the Department
of Public Works» Scott Donnelly during Monday's meeting, puts the
projected cost to rehabilitate the pool at about $ 7 million, whereas removal
costs hovered around $ 4 million.
The new plans also change the
project's design from its earlier version, and increase the
projected cost by about $ 75 million from earlier
estimates of about $ 350 million.
The increase and improvement
of such facilities consisting
of the following
projects: (i) Waste Water Treatment Plant disinfection system at the
estimated maximum
cost of $ 1,200,000; (ii) baseline Waste Water Treatment Plant
projects at the
estimated maximum
cost of $ 1,300,000; and (iii) inflow / infiltration pilot
project and reduction program improvements at the
estimated maximum
cost of $ 1,000,000; all as more fully described in the report and
estimate of cost prepared
by the County Engineers (Erie County Department
of Environment and Planning) which has been filed with the County Legislature and which has been approved
by the Board
of Managers
of said District on June 21, 2016 (the «Report»).
The 34
projects recommended
by the council have a total
cost of $ 208.4 million and, if they are all completed, create 825 permanent jobs and 16,302 construction jobs, and help retain 799 jobs, the council
estimated.
Those proposals were scuttled
by their astronomical
estimated costs, combined with the perception that they were boutique
projects serving just one subsection
of scientists rather than the astronomy community as a whole.
By building the Gullen Solar Farm adjacent to the existing wind project, Frischknecht estimates savings as high as A$ 6 million — reducing the cost of the project by a full 20 percen
By building the Gullen Solar Farm adjacent to the existing wind
project, Frischknecht
estimates savings as high as A$ 6 million — reducing the
cost of the
project by a full 20 percen
by a full 20 percent.
The European Union's Competitiveness Council, attended
by research ministers from the 27 member countries, met to discuss a document prepared
by E.U. officials that says Europe's share
of the ITER
project will likely
cost $ 7.2 billion, 2.7 times the original
estimate.
Global
estimates for 2020 show a
projected 400 to 600 additional gigawatts
of PV capacity as the
costs of PV energy are expected to drop
by almost 10 percent per year.
The company is progressively rehabilitating the site, which is surrounded
by the Kakadu National Park, in a
project set to continue to 2026 at an
estimated total
cost of around a billion dollars.
Response: Our best
cost estimate indicates that a SMR - 160 plant can be installed turnkey
by Holtec for less than half
of the
projected cost of the large nuclear plants on per kilowatt basis (being built in the US, France, and Finland today).
And the dramatic decrease in the
costs of genome sequencing, spurred on
by the Human Genome
Project, makes production
of this data a bargain
by any
estimate.»
Estimated to
cost $ 1.5 billion, the
project would improve mobility for the greater Dallas metro area
by reconstructing the entire highway from US 75 to I - 30, increasing the number
of HOV lanes and widening lanes and adding frontage roads.
The
estimated total
cost of the program
of projects is no less than $ 5 billion (as evidenced
by a preliminary budget included with the request for the emerging
projects agreement);
In the years since, design changes led
by Kentucky Gov. Steve Beshear, Indiana Gov. Mitch Daniels and Louisville Mayor Greg Fischer reduced the
project's
estimated cost from $ 4.1 billion to $ 2.6 billion — a savings
of more than 35 percent.
The
estimated costs of the
project are yet to be revealed, though TAN's report suggests that the total could exceed $ 20bn, financed entirely
by Saudi Arabia.
The completion
of the
project cost a total
of $ 127M, $ 20M more than
estimated in 2007, [32] which was mostly funded
by Amsterdam's city council.
The Solar Roof
cost is based on
estimated roof square footage for your home, provided
by Google
Project Sunroof where available, and the portion
of your roof covered with solar tiles.
The
project, which is part
of a larger collaboration between the Empire State Building Company, the Clinton Climate Initiative, Johnson Controls, Jones Lang LaSalle and the Rocky Mountain Institute, is expected to reduce the solar heat gain
of the building
by more than 50 % and save an
estimated $ 400,000 in annual energy
costs.
Now they're being used
by the new IMPACT2C
project, which is looking to provide new
estimates for the impact and economic
cost of climate change in Europe if global warming is limited to the international goal
of no more than 2 degrees Celsius, relative to Western European pre-industrial levels.
-- Direct loans, letters
of credit and loan guarantees
by the Administration shall not exceed an amount equal to 80 percent
of the
project cost of the facility that is the subject
of the loan, letter
of credit or loan guarantee, as
estimated at the time at which the loan, letter
of credit or loan guarantee is issued.
The
estimated costs of inaction range from 2 - 10 %
of GDP
by 2100
by some
estimates, to a fall in
projected global output
by 23 % in 2100 in others.
While this strategy was successfully employed for the small Block Island
project, it may not prove practical for large - scale development
of offshore wind in the U.S..
By some estimates, the use of foreign - installation vessels may increase project costs by as much as $ 20 — 40 million for a 100 - turbine developmen
By some
estimates, the use
of foreign - installation vessels may increase
project costs by as much as $ 20 — 40 million for a 100 - turbine developmen
by as much as $ 20 — 40 million for a 100 - turbine development.
A 2008 McKinsey report
estimated that if about 100 carbon capture and storage
projects were built
by 2030, the
cost of removing 90 %
of the CO2 produced from new coal plants might fall to $ 37 - 55 per ton
of CO2.
However, a repport commissioned
by the German Federal Ministry
of Environment, Nature Conservation and Reactor Safety reported that as
of August 2009, the
project was «more than three years behind schedule and at least 55 per cent over budget, reaching a total
cost estimate of $ 5 billion ($ 7 billion) or close to $ 3,100 ($ 4,400) per kilowatt».
With First Solar not yet having sold a major U.S. utility scale
projects without the low
cost of capital provided
by a DOE loan guarantee, its ability to secure ready access to capital markets at a low
cost will be critical, in our view — for its growth strategy, particularly, as we
estimate its core direct module sales are losing money at current prices.»
By comparing average local electricity
costs with the
projected average national price
of an installed rooftop solar system, we can
estimate the percentage
of states that may have — or may soon have — competitive rooftop solar power.
Days later Siemens AG (SIE) announced it's selling Marine Current Turbines Ltd... Already the top 20 wave and tidal - stream businesses have amassed losses
of $ 903 million over their lifetimes, according to BNEF data... «This is the capitalist survival -
of - the - fittest process working as normal in any new market area,» McCrone said
by e-mail... As other renewables such as solar and wind have reduced
cost to become commercially viable, waves and tides remain the most expensive sources
of power,
costing four times more than coal, BNEF
estimates... Oceanlinx Ltd. and Wavebob Ltd. both failed in the past 18 months, and Ocean Power Technologies Inc., one
of the only listed marine energy businesses, canceled a
project inAustralia.
Estimated cost of the
project is $ 4,3 million, to be financed
by the construction company that's building the highway.
Ambition regarding climate change at the national level is critical but is often calibrated with the
projected costs — as
estimated by a small suite
of energy — economic models.
Paragrap 17 «Notes with concern that the
estimated aggregate greenhouse gas emission levels in 2025 and 2030 resulting from the intended nationally determined contributions do not fall within least -
cost 2 ̊C scenarios but rather lead to a
projected level
of 55 gigatonnes in 2030, and also notes that much greater emission reduction efforts will be required than those associated with the intended nationally determined contributions in order to hold the increase in the global average temperature to below 2 ̊C above pre-industrial levels
by reducing emissions to 40 gigatonnes or to 1.5 ̊C above pre-industrial levels
by reducing to a level to be identified in the special report referred to in paragraph 21 below;»
The scale
of the
project alone is impressive: it has an expected total capital
cost of $ 14.8 bn (# 12bn) and the International Monetary Fund
estimates that the mine will generate a third
of Mongolia's GDP
by the time it reaches full production.
We exist to enable and facilitate the profitable use
of popular Alternative Fee Arrangements («AFAs») now demanded
by corporate legal departments
by using traditional
project management skills to more accurately
estimate, track and monitor the scope
of work and
costs in legal matters.
[37]
By 2008, seven years after the rule's effective date, the rule is
estimated to
cost 0.07 percent
of projected national health expenditures.
The person is also required to assist the client
by surveying the site, determining the feasibility
of the
project, providing
cost estimates, presenting proposals and determining the client's needs.
A well - written resume sample for Curriculum Writer should mention activities such as monitoring school changes, interacting with teachers and students, updating their knowledge
of technology,
estimating costs of curriculum changes, and analyzing
projects handled
by colleges.
A quantity surveyor is also referred to as a construction economist or a
cost economist whose main responsibility would involve to study the
project, make a rough plan
of estimated cost and then execute directions to the workforce; in the process will supervise over the activities and ensure to meet the construction
costs by meeting the feasibility structure
of the plan.
• Track record
of reviewing construction drawing prior to bidding processes and ensure that they are engineered according to set specifications • Hands - on experience in selecting subcontractors
by determining their suitability for each sub-
project • Qualified to proficiently
estimate budgets and ensuring quality control through all
project modules • Competent at planning all aspects
of the construction
project including
costs of materials and staffing
Morgan Stanley, Wellston, OH (6/2010 to Present)
Project Officer • Consistently meet project deadlines through effective coordination of staff and resources • Increase project efficiency for all assigned projects by 55 % by defining research avenues and providing research support to all involved departments • Introduce a series of process improvement directives, resulting in an increase in efficiency of project modules • Assist in the creation and implementation of project plans according to set instructions • Manage budget for each individual project by ensuring that all activities are handled within designated cost estimates • Facilitate the flow of information between individuals involved in project management and departments • Develop and maintain project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
Project Officer • Consistently meet
project deadlines through effective coordination of staff and resources • Increase project efficiency for all assigned projects by 55 % by defining research avenues and providing research support to all involved departments • Introduce a series of process improvement directives, resulting in an increase in efficiency of project modules • Assist in the creation and implementation of project plans according to set instructions • Manage budget for each individual project by ensuring that all activities are handled within designated cost estimates • Facilitate the flow of information between individuals involved in project management and departments • Develop and maintain project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project deadlines through effective coordination
of staff and resources • Increase
project efficiency for all assigned projects by 55 % by defining research avenues and providing research support to all involved departments • Introduce a series of process improvement directives, resulting in an increase in efficiency of project modules • Assist in the creation and implementation of project plans according to set instructions • Manage budget for each individual project by ensuring that all activities are handled within designated cost estimates • Facilitate the flow of information between individuals involved in project management and departments • Develop and maintain project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project efficiency for all assigned
projects by 55 %
by defining research avenues and providing research support to all involved departments • Introduce a series
of process improvement directives, resulting in an increase in efficiency
of project modules • Assist in the creation and implementation of project plans according to set instructions • Manage budget for each individual project by ensuring that all activities are handled within designated cost estimates • Facilitate the flow of information between individuals involved in project management and departments • Develop and maintain project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project modules • Assist in the creation and implementation
of project plans according to set instructions • Manage budget for each individual project by ensuring that all activities are handled within designated cost estimates • Facilitate the flow of information between individuals involved in project management and departments • Develop and maintain project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project plans according to set instructions • Manage budget for each individual
project by ensuring that all activities are handled within designated cost estimates • Facilitate the flow of information between individuals involved in project management and departments • Develop and maintain project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project by ensuring that all activities are handled within designated
cost estimates • Facilitate the flow
of information between individuals involved in
project management and departments • Develop and maintain project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project management and departments • Develop and maintain
project calendar and milestones and establish staffing needs for each individual project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project calendar and milestones and establish staffing needs for each individual
project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual project
project • Calibrate inputs and interpret outputs to assist strategy teams in handling individual
project project modules
Areas
of Expertise * Team Management * Contract Administration and Management * Construction Work Schedule * Civil & Structural Engineering Design *
Project Cost Estimating and Monitoring * Airport Runway design * Workmanship Quality Testing * Construction site supervision and contract administration under FIDIC suite, European Union suite
of contract forms, and other similar contract forms used
by multi-lateral lending age...
• Coordinated effort between Development, QA, Production, DR, System, DBA, Production - support, Network Administration, Applications group and vendors for
project completion ahead
of schedule under budget • Incorporated new technologies with legacy systems to improve performance and reduce
cost • Experienced in incorporating leading open source tools: nagios, mysql, tomcat, apache, wikis, etc. • Performed broad range
of UNIX Systems, Net - Working and SAN Administration tasks for large financial and networking clients such as HSBC Bank USA, Deutsche Bank, Citi Group, ISO.com, GE Corporate Treasury, Globeop Financial Services, LLC., Sothebys.com, Church Pension Group, and Verizon Partners Solutions • Provided
project leadership for managing technical resources, client / server issues, vendors, senior management reviews and hands - on technical expertise • Designed and deployed iPlanet Web / Directory server Architecture for the purpose
of authentication and Widows 2000 active Directory compatibility • Prepared
estimates and diagrams for the new secured Development Environment comprised
of Cisco routers, local directors, hubs, Sun servers, firewalls for deployment, staging and production • Developed one to one disaster recovery using Bourne Shell scripting for Reuters» Kondor 3.0 on Solaris 8 • Minimized website down time through careful monitoring
of Sotheby's Web Vision to Amazon
by using FTP servers to manage high volume uploads which optimized online trading functionalities • Directed installation, configuration, and security
of multiple online global auction sites • Automated operations, disk space monitoring, and backups using Bourne and Korn Shell scripting • Developed standard operating procedure for IP multi-pathing, Emulex LPFC, HBAs, EMC Power path, Navisphere, and installed JASS on new built servers