California's 228 MW of
capacity additions came from the Alta Wind X and Alta Wind XI phases of the Alta Wind Energy Center (currently the largest wind farm in the United States at 1,548 MW of total capacity).
Not exact matches
In
addition to participating in NISL's EDP and on - site coaching that many principals are receiving during their training, leaders in all three states are being trained to deliver the NISL program to build local
capacity to strengthen school leadership statewide for years to
come.
The previous handset only
came with either 8 GB or 16 GB of internal storage, where the increase in
capacity of the Galaxy S II will be a welcomed
addition to the successor of the first phone with them both being expandable through a microSD card.
Renewables accounted for almost two - thirds of net
capacity additions in 2016, with almost 165 gigawatts (GW)
coming online, the IEA adds.
Several large projects are expected to
come online in 2018, resulting in significant [year - on - year] growth, and heralding a period of sustained annual
capacity additions in the region.»
The most recent waves of generating
capacity additions include natural gas - fired units in the 2000s and renewable units, primarily wind,
coming online in the late 2000s.
Approximately 40 % of the total 2012 wind
capacity additions (12,620 MW)
came online in December, just before the scheduled expiration of the wind production tax credit (PTC).
If all planned wind generators for 2012
come on line, as reported by industry participants, wind
capacity additions could top 12,000 MW for this year.
As of November 30, 2012, the wind
capacity planned to
come on line by the end of December would account for approximately half of the total 2012 wind
capacity additions.
All those data on expected retirements and
capacity additions are tough to swallow in one gulp, but EIA also modeled
capacity additions in five scenarios against expected retirements, showing a slate of possible options dramatic shift
coming in the U.S. fuel mix in one chart:
In
addition, the activities include a total generation
capacity of four gigawatt that
come from coal, gas, and renewable sources in Spain and Portugal.
In contrast to this earlier period, when flush production was being added from new supergiant and giant discoveries in the Middle East, western Siberia and Africa, future
additions to
capacity will
come from increasingly marginal resources with lower production and fewer reserves per well.
In
addition to the new color name, the post appears to suggest that the «Blush Gold» color will only
come in 64 GB and 128 GB storage
capacities.
The microSD card slot to expand the 32 GB of internal storage is also a welcome
addition and while the batteries in both phones are still non-removable, they are now batteries which
come with larger
capacities, so battery life should be better.