1 Wolf Easi - Joists in the roof for organised
installation of services; 2 Windows bracketed externally onto blocks to reduce cold bridging; 3 The walls are externally insulated with 200 mm Xtratherm platinum EPS 100 insulation; 4 EPS brought up into eaves to meet roof insulation; 5 Airtight parge coat to walls, with Intello membrane to
ceiling and battening for the Gypframe
ceiling to contain services inside the airtight layer; 6 Cooper Insulation's Wincon unit, which enabled the Linham
team to test for obvious air leakage points as they worked.
SELECTED ACHIEVEMENTS • Introduced a «homemade» salt concoction to spread on icy walkways and significantly decreased the chances of accidents • Streamlined the maintenance staff schedule by implementing a system that dynamically assigns duties to
team members in the absence of one • Increased prospective residents» interest in the apartment building by 30 % by upgrading the outward appearance of the weatherworn building • Decreased utility bills by 60 % by suggesting
installation of false
ceilings