It also retained more than 98 per
cent of its capacity after 80 charging cycles.
The 8481's battery life runs to nine hours, Acer claimed, and it said that said power pack has a greater longevity than most, not losing 20 per
cent of its capacity after the usual 300 recharge cycles but after 1000.
Not exact matches
PORTMAN Limited is on track to boost the
capacity of its Koolyanobbing Iron ore project in WA to 3.5 million tonnes per annum in 2001
after completing key infrastructure changes and posting a 65 per
cent increase in iron ore sales during the six months to
By BARRY FOX
After several years
of spectacular growth, the number
of calls made on mobile cellular phones has dropped to around 30 per
cent of the network
capacity.
Average support in the auction
of 1.6 gigawatt (GW)
capacity surged to 4.66
cents per kilowatt hour (ct / kWh)
after it stood at 0.44 ct / kWh in the first auction in 2017, a result that surprised many observers at the time.
TransCanada had secured a 500,000 barrels a day 20 - year commitment
after conducting an open season locking up about 60 per
cent of the 830,000 barrel a day
capacity.