Individual works can be
centered on a single wall, wrap around several walls filling an entire room, span multiple rooms or adjacent floors of a building, scale up and down stairwells, and more.
In the first inning Morgan hit one of surprise Yankee starter Doyle Alexander's infrequent fastballs into the right - field stands; in the third Dave Concepcion tripled down an open Yankee alley in left
center and crossed the plate
on Pete Rose's sacrifice fly; and in the seventh George Foster
singled and scored
on Bench's triple off the right - field
wall.
A seeming late winter's grey grip
on midtown loosened at the Tibor de Nagy Gallery as the lift doors opened
on a cornflower blue
wall with a
single, strong painting at its
center, Shirley Jaffe's Adria's Green (2014).
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build
single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain
wall system • Completed project
on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention
Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constr
Center • Remove exterior
walls on 3 sides of the building and install complex new curtain
wall system in 20 bays • Maintain job site and public safety allowing use of the convention
center during ongoing constr
center during ongoing construction