And through the use of hydraulic rotary cutter head pipeline dredges and Rolligon amphibious ditcher - spreaders, use, instead, these navigation
channel dredge spoils to reconstruct the fringe marshes and tidal creeks of the Chesapeake Bay watershed.
Simply by depositing navigation
channel dredge spoils on a long intertidal slope just seaward of certain bulkheads and eroded shorelines nearby, beautiful, vibrant fringe marshes could be reestablished in one short year.
Specifically, we should stop squandering the navigation
channel dredge spoils that the central government is, at some considerable expense, parking in a series of ill conceived (Chesapeake Bay watershed) USACE vertical dredge spoil sites.
Especially when considering the savings in disposal (repositioning) navigation
channel dredge spoils....
Not exact matches
Witness: the pipeline
dredging of shipping
channels in the Mississippi River and placement of the associated
dredge spoils, on long 1:6 intertidal slopes just seaward of eroded shorelines.