In fact, he sees some new
coal plant construction as integral to African growth and dismisses those who would rather see Africa develop solely via renewables.
Not exact matches
Darin Kingston of d.light, whose profitable solar - powered LED lanterns simultaneously address poverty, education, air pollution / toxic fumes / health risks, energy savings, carbon footprint, and more Janine Benyus, biomimicry pioneer who finds models in the natural world for everything from extracting water from fog (
as a desert beetle does) to
construction materials (spider silk) to designing flood - resistant buildings by studying anthills in India's monsoon climate, and shows what's possible when you invite the planet to join your design thinking team Dean Cycon, whose coffee company has not only exclusively sold organic fairly traded gourmet coffee and cocoa beans since its founding in 1993, but has funded dozens of village - led community development projects in the lands where he sources his beans John Kremer, whose concept of exponential growth through «biological marketing,» just
as a single kernel of corn grows into a
plant bearing thousands of new kernels, could completely change your business strategy Amory Lovins of the Rocky Mountain Institute, who built a near - net - zero - energy luxury home back in 1983, and has developed a scientific, economically viable plan to get the entire economy off oil,
coal, and nuclear and onto renewables — while keeping and even improving our high standard of living
I was encouraged by President Obama's calls for the
construction of more nuclear power
plants,
as well
as for increased offshore exploration of oil and natural gas, and the further development of clean
coal technologies.
As part of the largest investment in
coal - fueled synthetic natural gas
plants in history, the central Chinese government recently has approved
construction of nine large - scale
plants capable of producing more than 37 billion cubic meters of synthetic natural gas annually.
China Energy News, a state - run newspaper, cited a policymaker Monday
as saying that China will complete the
construction of approved
coal - to - natural - gas
plants but will not approve new projects until 2020, aiming to keep its
coal - based synthetic natural gas production capacity to 15 billion cubic meters at the end of the decade.
In my view, if the
coal industry does not proactively agree to, and indeed volunteer for, a prompt moratorium on the
construction of new
coal - fired power
plants until carbon capture and storage are proven and viable, and included in commercial
plants, we should get out the literature, the musical lyrics, the poetry, the ethical codes, and so forth and create a collection of material that brings to vivid life the «problems» (to put it mildly) that Shakespeare illuminates,
as they will then apply to the
coal industry.
Realization that all
coal - fired power
plants without actual carbon capture will have to be «bull - dozed» in the next several decades, in all countries, should serve
as an effective brake on new
construction of
coal - fired power
plants during the next few years in all countries.
New
coal plants cost three to four times
as much
as they did three years ago, due to the embedded cost of petroleum and natural gas in
plant construction, materials and labor.
Everyone knows that environmental groups oppose the
construction of
coal and nuclear
plants — but do they also oppose wind and solar projects
as well?
Since 2007 planning and
construction of new
coal - fired power
plants in India has accelerated, and hundreds of new
plants are in currently in the pipeline,
as shown in CoalSwarm's India
coal plant tracker.
Expansion of grid supply by
construction of big new
coal fired power
plants such
as in the Hunter Valley and near Lithgow are going ahead and look to me to be intended to prevent the issue of decarbonising our energy supply getting mixed up with the issue of maintaining growth and reliability of supply; we'll have enough fossil fuel generating capacity that building low emissions capacity will remain «optional» and can be deferred another decade or two.
While there are still new
coal plants planned or under
construction — mostly in Poland, the Western Balkans, and Turkey — with Europe
as a whole on a clear path beyond
coal, these projects face an uphill battle.
Even in that context groups like Greenpeace have pointed to planned
construction of new
coal plants being cancelled in India
as a sign the country is moving away from
coal.
There are currently about 350
coal - fired power
plants under
construction in Southeast Asia, which Georg Kell, the founding director of the United Nations Global Compact, and now board chairman of Arabesque Partners, described
as «collective suicide» at a green finance event in Singapore in February.
As part of those international efforts, the United States has agreed to end financial support for
construction of new
coal - fired power
plants overseas, except for those in the «world's poorest countries» and those that employ carbon capturing technologies.
This not only includes renewables, but also including the adoption of state - of - the - art technologies for new
coal power
plants as well
as construction of more hydropower.
(3) Other cases are described on my Columbia University web site, e.g., Switzerland finances
construction of
coal plants, Sweden builds them, and Australia exports
coal and sets atmospheric carbon dioxide goals so large
as to guarantee destruction of much of the life on the planet.
More
coal plant could happen in the near future
as the EPA has proposed regulations would effectively ban the
construction of new
coal - fired power
plants, unless they utilize commercially unproven carbon capture and sequestration technology.
The chart shows needed & unneeded
coal capacity (GW) in 2020 based on existing
plants as of 2016 and under
construction under different
coal plant capacity factors and power generation growth rates.
The study shows that
as of July this year China has 895 GW of operating
coal capacity or 2,689
plants being utilised less than half the time, with another 205 GW of capacity under
construction inconsistent with the goals of the 13th five - year plan.
The only employment they are allowed would be
as day laborers on third world
construction projects building
coal and natural gas electrical generation
plants and electrical distribution grids.
«USEDA» (formerly know
as the US Environmental Protection Agency) is proposing revisions to decades - old air quality regulations that will make it easier for
coal - fired generation
plants to obtain
construction and operating permits for sites where air
The other obvious thing to do is to halt the
construction of new fossil - fuel based power
plants, and start shutting down
coal - fired power
plants as soon
as possible.