Sentences with phrase «completed multiple installations»

Key Highlights: • Successfully completed multiple installations of 8 Avaya Communications Systems, R. 11 Call Center with Expert Agent Selection, and upgrade to R. 11 large format G3si switches.

Not exact matches

«We completed the installation of our new bottling line just under two years ago, which consisted of a new depalletizer heading to a rinser, a new blending system and 70 - valve filler followed by four cappers, a bottle warmer / chiller, two labelers with multiple capabilities, and two packers leading to a palletizer.
The installation of artificial turf, which already has been completed in other metro school systems such as Cobb, Forsyth and Fulton counties, offers other benefits in addition to the savings, such as fewer injuries to students, faster recovery time after rain and increased usage opportunities by multiple athletic teams and marching bands for both games and practices.
Tran has completed multiple projects and installations, including work at the Seattle Art Museum, VH1 Save the Music Foundation and the Brain Project Toronto.
She has completed multiple large - scale installations and solo exhibitions across Chicago including The Museum of Contemporary Art Chicago, The Elmhurst Art Museum, Kavi Gupta Gallery and The Mission Projects, among others.
Completed work and installation of software for new state of the art Multiple Listing System running on client - server technology
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction
a b c d e f g h i j k l m n o p q r s t u v w x y z