Sentences with phrase «completing feasibility studies»

Common Civil Engineer duties include completing feasibility studies, using computer software, managing budgets, making sure projects are completed in time, determining project impact, solving development problems, and liaising with clients.
Main job duties and responsibilities of a Budget Officer are developing budgets, liaising with funding agencies, completing feasibility studies, assessing programs, finding ways to reduce costs, and providing support to policy - making organisms.
Perth - based gold stocks Blackham Resources and Red 5 are a step closer to commencing major new developments after completing feasibility studies and receiving final approvals.
Shares in Adelaide - based Flinders Mines plummeted on the stock market today after it announced a $ 6.7 million capital raising to complete a feasibility study on its Pilbara iron ore project.
Virgin completed a feasibility study with the Dubai Roads and Transport Authority this year to explore the viability of a UAE - wide hyperloop system.
The Project Team also completed a Feasibility Study to determine the viability of a packing house as a way to overcome some of the barriers.
The fate of 30 - minute ferry service was uncertain until Wednesday, the deadline for the city to complete a feasibility study as part of a little - known step toward increasing service.
In 2010, Chris and Todd began working with consultants to complete a feasibility study for the building's renovation.
With $ 75,000 in grant money from the state of Maryland, he's just completed a feasibility study for building Thurmont a 30 - megawatt biomass power plant.

Not exact matches

«Now that our resource drilling is complete, we expect to issue an updated resource shortly that will feed into an updated feasibility study in Q3.
Completed components of the program include a feasibility study and underground exploration (960 metres of development with associated test stoping).
The feasibility study has now been been completed by our independent consultant JDS Energy and Mining Inc. and includes contributions from SRK Consulting (Canada) Inc..
The drilling was conducted at the W85 deposit, which was included in the recently - reported Preliminary Economic Assessment (PEA)(see news release dated April 18, 2017), and was completed to obtain metallurgical samples as part of the planned feasibility study.
Paramount expects to complete a Preliminary Feasibility Study («PFS») for the proposed underground mine at its Grassy Mountain Gold Project in late March or early April.
The personnel of FOODPRO are pleased to offer a complete range of consulting engineering services from studies (planning, feasibility, site selection, etc.) through construction and equipment installation management including all the engineering disciplines (industrial refrigeration, electrical, structural, etc.) necessary for complete plans and specifications.
The Center for Ecoliteracy provides a roadmap in a feasibility study completed for the Oakland (California) Unified School District.
Feasibility Studies for the development of Boankra Inland Port and Eastern Railway Line using PPP was completed and approval granted.
Julie Cerio, the county's economic development director, said today that the company asked her office to stop working on the project before a feasibility study was completed.
However, the report announced that Government do not propose to make any decisions on reshaping the existing Highways Agency Board until the feasibility study has completed, but DfT do accept a more strategic role for the Department is required.
Feasibility studies are likely to be completed by 2010 with first production in 2013..
Feasibility studies, design and cost benefit analysis for all the 14 fishing harbors were completed and handed over to the NPP government through the late Mrs Gladys Asmah by a Dutch Engineering Consultium, DHV in 2007.
The first phase of AECOM's feasibility study will be completed this fall.
The XF represents the first time that VP and VS tools have been used by Jaguar throughout a complete vehicle programme — from vehicle development, to production feasibility studies, to build planning.
A full wetland delineation and feasibility study were completed in 2008.
The feasibility study should be completed in six months, the results of which will determine whether we will be able to move to the pilot phase.
We can work with you on many levels: structural, electrical and mechanical consultation, feasibility studies, complete system design, and installation.
Study II demonstrated the feasibility of having parents complete the questionnaire via the Internet and provided valuable sleep data for a large sample of children.
Complete Architectural and Interior Design Services from feasibility study to completion.
Scion and David Nairne & Associates (DNA), a British Columbia architecture and planning firm, have completed a student housing feasibility study for the Comox Valley campus of North Island College, marking Scion's first engagement in the province.
a b c d e f g h i j k l m n o p q r s t u v w x y z