Sentences with phrase «completing the work required»

A fixed or flat fee is simply a pre-arranged total fee that is paid upfront to complete all work required for a particular legal matter.
From that day forward, you can focus on completing the work required in active files, and in advising and / or referring clients who will need to retain new counsel.

Not exact matches

Students with less than two years of professional work experience are required to complete an internship over 16 weeks during the summer in order to graduate.
Work could be completed without required permits, or Lesh said, appliances or lighting could be installed without «proper connections in the electrical panel.»
The Joint Review Panel was not as definitiive — it found that, «further scientific research would be needed for definitive answers,» and has required the Northern Gateway to complete that work.
All students undertake compulsory consulting projects, while those without two years of work experience are required to complete a three - to four - month placement.
She accepted the $ 72,000, but also negotiated eight extra vacation days and time to complete a certification class, which was a 32 - hour credit course and required four full Fridays away from work to complete.
«It's one thing to go into a [client] presentation saying you have a good network and can provide the service required,» says Vallbona - Freeman, «and it's an entirely different thing to go into a presentation with a network name, logo, Web site, and concrete examples of successful client work completed by the network.
This kind of employee requires extra guidance in how to perform tasks and additional time for a manager to check and correct the work completed.
The novelty requires employees to work together and create team process skills to complete the activity successfully.
Comments received by the Department and media reports also indicate that many financial institutions already had completed or largely completed work to establish policies and procedures necessary to make the business structure and practice shifts required by the Impartial Conduct Standards earlier this year (e.g., drafting and implementing training for staff, drafting client correspondence and explanations of revised product and service offerings, negotiating changes to agreements with product manufacturers as part of their approach to compliance with the PTEs, changing employee and agent compensation structures, and designing conflict - free product offerings), and the Department believes that financial institutions may use this compliance infrastructure to ensure that they meet the Impartial Conduct Standards after taking the additional Start Printed Page 16910sixty days for an orderly transition between June 9, 2017, and January 1, 2018.
This means that we need to complete the PFS by the end of 2018 which will require additional engineering work, some drilling at Oculto and its satellite deposits, as well as continuing with the baseline environmental work
Work with a CERTIFIED FINANCIAL PLANNER ™ (CFP ®) professional who is required to complete extensive training and continuing education and can help you with big picture planning as well as portfolio management.
Each work term requires you to submit a performance evaluation that you have completed in conjunction with your supervisor, and complete and submit a work term report.
How much long term maintenance have these projects required once the initial hard work is complete?
As more blocks are added to the chain, more computers — meaning more energy and more space — are required to complete the proof - of - work problem.
The problem is the small financing requires more work to complete than the larger one.
They typically require 10 to 30 years» work to complete.
Some bully pastors can provide a complete system where it's all spelled out for you, no major work on your part required... just listen to them and say what they say, do what they say, be what they say.
To do this usually requires completing unfinished growth work.
When the work of conversion was completed, in theory the missions were «secularized» — that is, the missionaries, most of whom were «regulars» (members of orders), were required to give place to the «secular» clergy, and normal parish administration, such as existed in districts longer under European rule, was introduced.
However, as we look around today and ask what conditions seem on the whole to make for happiness in marriage, we are driven to the curious conclusion that the more «civilized people become the less capable they seem of lifelong happiness with one partner» (p. 135) For a marriage to work requires that there «be a feeling of complete equality on both sides; there must be no interference with mutual freedom; there must be the most complete physical and mental intimacy; and there must be a certain similarity in regard to standards of value» (p. 143).
Original recipe suggests 1 1/2 hours, convection baking requires less time, and a little more than an hour is about right in our oven / Toothpick testing doesn't work — you have to take a visual read on the fruitcake, even remove it from the oven for a moment, peel off a corner of the parchment, which I did, take a peak and return to oven if you like / An hour and fifteen minutes, give or take, works for me / Remove paper immediately after baking is complete.
We'll keep you up to speed on the happenings at SFT as Christie completes the critical work required to accelerate an entire industry and change the food system!
The ACFEF apprenticeship program requires apprentices to complete 445 hours of classroom instruction and at least 4000 working hours in a professional kitchen while being mentored by leading chefs in the industry.
Even so such things take time to work out, and before the deal was completed you'd have expected that Renault would have told Jolyon Palmer that the team wouldn't be requiring his services in 2018.
However, should extra work be required after a viva to complete academic requirements, then Varsity eligibility is extended until these requirements have been met but shall not extend beyond the academic year in which the original viva takes place.
Even then, the work is designed so that it usually requires only minutes to complete.
Each project is standalone and doesn't require that students complete the one before, although the initial getting started projects are great for gaining an understanding as to how the system works.
If you've been working with a fertility doctor, you may know that reproductive endocrinologists require that all parties undergo a complete medical screening before beginning in vitro fertilization (IVF).
I liked your comment about how Obstetricians are required to complete 12 — 15 years of college education and clinical work before they can practice.
These doctors are required to complete a combined 12 to 15 years of college education and clinical work prior to being able to practice.
Successful completion of the course will be demonstrated by completing required reading and tests, working through case studies, watching required videos, and engaging in discussions in the discussion board.
Each module had clear aims and objectives, sufficient under pinning knowledge, lists of prior and suggested further reading as well as links to other online resources; all of which were needed to complete the required course work.
Before the process of selecting a donor can begin, recipients are required to complete a series of appointments that includes a physical exam, lab work, and a meeting with our licensed Marriage and Family Therapist.
Subject to this work being completed, the IMF Executive Board would be expected to consider the review during the summer after finalisation of the required documentation,» Mr. Toujas - Bernaté said.
Decides that, in order to begin to comply with its disarmament obligations, in addition to submitting the required biannual declarations, the Government of Iraq shall provide to UNMOVIC, the IAEA, and the Council, not later than 30 days from the date of this resolution, a currently accurate, full, and complete declaration of all aspects of its programmes to develop chemical, biological, and nuclear weapons, ballistic missiles, and other delivery systems such as unmanned aerial vehicles and dispersal systems designed for use on aircraft, including any holdings and precise locations of such weapons, components, subcomponents, stocks of agents, and related material and equipment, the locations and work of its research, development and production facilities, as well as all other chemical, biological, and nuclear programmes, including any which it claims are for purposes not related to weapon production or material;
Construction on the project is scheduled to being in late fall, and the grant requires that the work be completed by the end of 2018, a goal Mr. Sini said they are on target to meet.
But we recognize that it may require further review, further work and we are happy as a group to help in any way that we can to bring to complete such a review if necessary,» he added.
The unexpended balance of each appropriation, less the commitments outstanding at the close of the fiscal year for which it was made, shall lapse at the close of such fiscal year; provided that nothing herein contained shall be construed to require the lapsing of appropriations which may be or are required to be made for an indefinite period or which include state refunds, allocations or grants applicable to said appropriations pursuant to any other provisions of law; and provided further that nothing herein shall be construed to prevent the making of appropriations or contracts for the construction of permanent public improvements or works not to be completed during the fiscal year, or the acquisition of property therefor, or the establishment of bond or capital accounts, sinking funds or reserve funds, and each such appropriation, account or fund shall continue in force until the purpose for which it was made shall have been accomplished or shall have been abandoned by a two thirds vote of the County Legislature.
Such requests for proposals shall contain all pertinent information concerning each proposed audit report and management letter contract, including the date upon which the contract is to commence, a description of the work to be performed, any particular or unique specifications required, the fiscal year (s) for which the audit reports and the management letter (s) are to be prepared and the date (s) by which the audit report (s) and accompanying management letters shall be completed and formally submitted to the County Legislature and County Executive.
The party further claimed that the»em ergency ad - hoc workers» who could not swear to the Oath of Neutrality required of them before been sent to the field are now being requested to complete the Form 17 and return to the INEC OFFICE Awka before close of work on Friday, December 6, 2013.
«Oneida County residents planning renovations to their pre-1978 built homes should hire only those contractors who have completed the required EPA Renovator Training and request proof of certification before work begins,» Dr. Gayle Jones, Director of Health said.
However, the average time to complete the thesis is longer than 3 years, often due to the fact that most Ph.D. candidates are employed in half - time positions that usually require them to work more than 20 hours a week without extra pay.
According to his rejection letter, Koumtzis was rejected because the university decided that he wouldn't be able to complete the required lab work.
Today, most separations require considerable manual work and are carried - out on large gels which require several hours to complete.
Further work should complete the picture of the multiple configurations of RNA editosomes which are required to convert Cs to Us in plant organelles.
«NASA required we successfully complete the Certification Baseline Review — our first CCtCap (Commercial Crew Transportation Capability Phase) milestone, successfully complete an interim milestone representing work culminating in a significant design review (for us, this was the Delta Integrated CDR (Critical Design Review), our 4th tCap milestone), and meet additional ATP criteria we proposed (that is different for each provider),» Boeing's Kelly Kaplan told SpaceFlight Insider.
Once this detailed work is completed in a few years» time — a required part of the process in seeking formalisation of the term by a number of geological bodies — it will first be submitted for scrutiny to the Subcommission on Quaternary Stratigraphy of the International Commission on Stratigraphy.
This work will require funding of $ 2.5 M and take almost 12 months to complete,» said Kenneth Hobby, Executive Director of Families of SMA.
a b c d e f g h i j k l m n o p q r s t u v w x y z