Sentences with phrase «conceptual knowledge necessary»

The latest PISA report, Equations and Inequalities, notes that exposure to «pure mathematics,» such as equations and functions, builds conceptual knowledge necessary to solve complex problems.

Not exact matches

A change to the conceptual framework on a programmatic level is necessary to instill the necessary technological pedagogical content knowledge (or technology, pedagogy, and content knowledge, known as TPACK) that allows future teachers to integrate technology in a manner consistent with national standards (Wetzel, Foulger, & Williams, 2009).
They build their vocabulary, acquire conceptual knowledge, learn about letter - sound relationships and the relationship between oral and written language, and practice the skills necessary to become automatic and fluent readers who can tackle the more specialized and technical texts of secondary reading (Chall, 1983; Chall & Jacobs, 1996; Jacobs, 2000).
electric power plants are: (1) survey and assess the capacity, cost, and location of potential depleted gas and oil wells that are suitable CO -LCB- sub 2 -RCB- repositories (with the cooperation of the oil and gas industry); (2) conduct research on the feasibility of ocean disposal, with objectives of determining the cost, residence time, and environmental effects for different methods of CO -LCB- sub 2 -RCB- injection; (3) perform an in - depth survey of knowledge concerning the feasibility of using deep, confined aquifers for disposal and, if feasible, identify potential disposal locations (with the cooperation of the oil and gas industry); (4) evaluate, on a common basis, system and design alternatives for integration of CO -LCB- sub 2 -RCB- capture systems with emerging and advanced technologies for power generation; and prepare a conceptual design, an analysis of barrier issues, and a preliminary cost estimate for pipeline networks necessary to transport a significant portion of the CO -LCB- sub 2 -RCB- to potentially feasible disposal locations.
The research needs that have high priority in establishing the technical, environmental, and economic feasibility of large - scale capture and disposal of CO -LCB- sub 2 -RCB- from electric power plants are: (1) survey and assess the capacity, cost, and location of potential depleted gas and oil wells that are suitable CO -LCB- sub 2 -RCB- repositories (with the cooperation of the oil and gas industry); (2) conduct research on the feasibility of ocean disposal, with objectives of determining the cost, residence time, and environmental effects for different methods of CO -LCB- sub 2 -RCB- injection; (3) perform an in - depth survey of knowledge concerning the feasibility of using deep, confined aquifers for disposal and, if feasible, identify potential disposal locations (with the cooperation of the oil and gas industry); (4) evaluate, on a common basis, more» system and design alternatives for integration of CO -LCB- sub 2 -RCB- capture systems with emerging and advanced technologies for power generation; and prepare a conceptual design, an analysis of barrier issues, and a preliminary cost estimate for pipeline networks necessary to transport a significant portion of the CO -LCB- sub 2 -RCB- to potentially feasible disposal locations.
a b c d e f g h i j k l m n o p q r s t u v w x y z