Underfloor heating pipes in
concrete screed, polished concrete floor finish.
The building was constructed from a factory - built timber frame system insulated with polyurethane, with a Quinn Lite subfloor, while the ground floor features 250 mm of Kingspan TF70 insulation under
the concrete screed
Not exact matches
After: 200 mm Ballytherm PIR insulation under new 75 mm
concrete floor
screed.
Ground floor: Insulated raft foundation consisting of 200 mm Aeroflor EPS300, 250 mm
concrete, 80 mm Kingspan TF70 insulation (containing ventilation ductwork channels), 60 mm Sika Viscocrete
screed (containing underfloor heating), Bambeau Solid 3SF bamboo flooring.
Overall U-value: 0.58 Floor Before: Original suspended floor (and solid floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm
concrete slab on blinded sub-base, 40 mm floating
screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DA - S.
Mix, apply and plaster,
concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, towel and
screed.
Smooth or finish freshly poured cement or
concrete, using floats, trowels,
screeds, or powered cement finishing tools.