Provided direct supervision of workers
conducting electrical safety work on systems that are pivotal in verifying the integrity of nuclear reactor safety.
Not exact matches
The PCA must be
conducted in accordance with the current ASTM protocol and cover the following areas: building code,
safety and ADA compliance; evaluation of structural, roof, HVAC, mechanical,
electrical and plumbing systems; site improvements; sewer and drainage systems.
Conducts training sessions of new work methods or procedures,
safety regulations, work policies,
electrical codes and standards
Some of their duties include checking heating and cooling systems, making sure
electrical equipment is running properly, performing minor repairs,
conducting regular inspections, and making sure
safety regulations are met.