Sentences with phrase «construction documents created»

The general contractor will be able to use the construction documents created by the architect to prepare a bid.

Not exact matches

We anticipate this design will be sufficient to provide to an architectural vendor to create your Construction Documents.
Once the construction documents and elevations are completed then we will create an Equipment Specification book.
The administration's recently released budget documents contain the little - noted proposal to create an agency that could oversee public construction projects worth more than $ 50 million.
Baron also created a special box assemblage incorporating various German documents, including her father's passport, which Nazi authorities had stamped with a large red «J.» Although Baron did not travel to Germany, she gave specific instructions that this construction and her statement be hung in a hall outside of the exhibition space.
An online exhibition to mark the 100th anniversary of this event was created by the Archives of The Frick Collection and Frick Art Reference Library, and draws upon documents and photographs to tell the story of the house's planning, construction, furnishing, and early days.
Alan's construction practice includes project delivery counseling, the preparation of all «front - end» documents and creating risk management and insurance programs on behalf of owners, developers, architects, engineers, construction managers, contractors and subcontractors, and participation in dispute resolution of claims.
Ritchie's construction practice includes project delivery counseling, the preparation of all «front - end» documents and creating risk management and insurance programs on behalf of owners, developers, architects, engineers, construction managers, contractors and subcontractors, and participation in dispute resolution of claims.
In your construction Bid Form, you'll want to include information like: the name of the project; where the bid will be returned; a list of all the documents provided to the contractor in connection with the project; a list of all the documents attached to the Bid Form; any estimates made in the Bid (for example, you may include a performance bond, a bid bond, or any other documents the owner requires); and the date the document was created.
Users that create Construction Management Agreement sometimes need additional documents.
Users that create Construction Contract sometimes need additional documents.
Preparing a construction case for arbitration or litigation creates the challenge of distilling the «best» evidence from a universe of documents that frequently exceeds hundreds of thousands of pages
Created and updated high volume of time - sensitive material: document drafting (proposals, specification determination, miscellaneous reports, permitting, schematic design, Construction Document and open correspodocument drafting (proposals, specification determination, miscellaneous reports, permitting, schematic design, Construction Document and open correspoDocument and open correspondence).
Created documents for construction permits and project approvals according the established NC, VA, and FL building standard code and ADA regulations.
Used Autodesk and AutoCAD to create construction documents for healthcare, custom residential, and commercial projects.
Create a wide variety of architectural documents, from Conceptual Design thru Construction Ddocuments, from Conceptual Design thru Construction DocumentsDocuments.
Manage and validate accuracy of construction documents for compliance to Company product design standards and regulatory requirements, and the methods by which they are created in production.
Responsible for creating Design and Construction documents and ensuring customer satisfaction
• Produced construction drawings and architectural details • Documented existing conditions • Created schematic models using Archicad and SketchUp • Researched coding and zoning requirements • Rendered for marketing and presentation purposes
Creating Structural Drawings in all stages from Schematic Drawings to Construction Documents using AutoCAD and Revit.
Created proposals, prepared designs and completed construction paperwork and documents for buildings.
Electronic Data Systems, Advanced System Engineer (Denver, CO) 11/1985 — 3/1999 • Implement computer database engineering objectives for a data processing administrator • Install Vantive and Oracle databases for clients • Manage system tests, Oracle 7.3.4 / Sybase 4.9.2 database administration, import / exports, Oracle PL / SQL scripts • Serve as assistant Oracle database administrator for CLMS team • Develop Visual Basic / GUI applications and C batch programs in Vantive • Perform team leadership role in construction phase of COBOL II project • Create request for proposal document and high - level requirements • Develop technical lead of General Motors Fleet Volume using IMS / DB2 / TELON / COBOL II, system test, UAT and implementation • Develop IMS / DB2 / PL1 on - line system, coordinate system test and UAT, and serve as technical leader of Experimental System
Designed electronic file systems and maintained electronic and paper files.Handled all media and public relations inquiries.Maintained the front desk and reception area in a neat and organized fashion.Served as central point of contact for all outside vendors needing to gain access to the building.Facilitated working relationships with co-tenants and building management.Made copies, sent faxes and handled all incoming and outgoing correspondence.Created weekly and monthly reports and presentations.Organized files, developed spreadsheets, faxed reports and scanned documents.Properly routed agreements, contracts and invoices through the signature process.Managed the day - to - day calendar for the company's senior director.Received and screened a high volume of internal and external communications, including email and mail.Managed daily office operations and maintenance of equipment.Maintained detailed administrative and procedural processes to improve accuracy and efficiency.Coordinated meetings with other department managers and served as main liaison between sales and field staff.Scheduled and confirmed appointments for entire management team.Provided support for CEO and sales team in managing operation work flow.Successfully established effective systems for record retention by creating database for daily correspondence tracking.Developed more efficient filing systems and customer database protocols.Qualified competitive subcontractor bids prior to execution of contracts.Submitted all project closeout documents in accordance with the contract.Assigned projects and tasks to employees based on their competencies and specialties.Accurately provided status information on project progress to the project management.Monitored the safety of all construction activities, making on - site personnel safety the top priority.Acted as the liaison with company safety representatives to promote awareness and understanding of safety protocols.Increased the employee base by 50 % to meet changing staffing needs.Advised managers on organizational policy matters and recommend needed changes.Conducted new employee orientation to foster positive attitude toward organizational objectives.Directed personnel, training and labor relations activities.Served as a link between management and employees by handling questions, interpreting and administering contracts and helping resolve work - related problems.
a b c d e f g h i j k l m n o p q r s t u v w x y z