Sentences with phrase «construction phase included»

The work involved in the final construction phase included finishing touches to the reception area, conference facilities and dining outlets.

Not exact matches

Key benefits include the logistical ease of working with local companies, during both the construction phase and the ongoing servicing of a project.
«The MoU we have signed today is for the first phase of the project, which include designing and construction of sewage septic waste facility in Kumasi,» he said.
Mahler, whose house abuts the north side of the Main Line tracks, said she has several concerns about the construction phase, including noise, vibrations, contaminated soil and road closures impacting emergency response times.
The first phase of the $ 200 million project on East Main St. will include construction of 96 new apartments, 72 active senior living homes, as well as additional retail and office space.
While the discussions are preliminary and conceptual, at this point the first phase would include construction of 1,000 hotel rooms, theater and entertainment components, approximately 3 million square feet of convention and exhibition space, expansion of VLT gaming space and a parking facility.
QUEENS, NY — Borough President Melinda Katz stated the following in response to questions about an agreement reached this week with the Queens Development Group on Phase 1 of Willets Point; the agreement includes the construction of 1,100 affordable apartments (including 221 for low - income seniors) and a brand new 450 - seat public elementary school: «The City -LSB-...]
A FLREDC priority project, the phased, $ 200 million project broke ground on the major $ 100 million phase of the development that includes the construction of 96 creatively designed luxury apartment homes on the 9th through 12th floors, retail on Main Street, office space in the mid-rise, mixed income and active senior living apartments, and a complete rehabilitation of the entire facade and windows of the building.
One road that has remained an eye sore in Lekki Phase one is Grace Anjous street.The street is less than 100 meters away from the recently commissioned cable bridge.The street provides a feeder option for the easement of traffic on the admiralty corridor.It is most imperative and expedient to include this important road in the list of roads earmarked for construction.
In the Albany area, one of the four regions of the state designated under companion legislation for casino construction in the first phase, several counties — including Albany, Saratoga, Schenectady and Warren — voted down the amendment.
Crerand Commons Phase II, which will include the construction of 33 new apartments in the high - preforming Spencerport School District in the Town of Gates.
Riley said the project, which could cost more than $ 80 million in total, if including a second phase of construction, would have gone nowhere if Walsh wasn't Syracuse's deputy commissioner of neighborhood and business development at the time.
It conducts all phases of remediation work, including heavy civil / marine construction, sediment dredging, soil stabilization, and geotechnical construction.
Henninger High School - $ 37.4 million - Partial renovations include expanded cafeteria, enlarged library, new windows, reconfigured main entrance, gymnasium renovations, spaces for career technical education programs, support spaces, partial mechanical system replacement, bathroom renovations and security improvements - Phased construction with students remaining in building
The initial construction phase of the Scripps Florida campus will include three buildings — the Drug Discovery Building (99,000 square feet), Advanced Technologies / Administration Building (119,000 square feet), and Molecular / Biomedical Research Development Building (132,000 square feet) on approximately 44 acres of the 100 - acre site.
The two - phase competition involved the collaboration of students from diverse backgrounds, including architecture and construction management, responding to a request for qualifications, and request for proposals for a student health and wellness facility on a liberal arts college campus in the northwestern region of the United States.
Missions to develop these themes are budgeted with a total cost that includes construction, mission operations, and data analysis as one package in the mission's prime phase; the funding level for operations and data analysis during the mission's subsequent extended phase is determined by competitive review among all operating missions (NASA's Senior Review process).
Schools included in the second phase of the programme can now begin developing plans for refurbishment, with completed construction expected to be around by September 2017.
Day 2 saw the students getting stuck into the practical workshops which included bridge design, bridge building, construction phasing and construction role play.
The 52 - year, Phase I Concession CDA includes design, development, construction, finance, maintenance, and operation of 13 miles along IH 820 and SH 121 / SH 183 from IH 35W to SH 121, from north of Fort Worth to just southwest of Dallas - Fort Worth International Airport.
costs» means amounts substantially all of which are paid by, or for the account of, an obligor in connection with a project, including the cost of» (A) development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, permitting, preliminary engineering and design work, and other preconstruction activities;» (B) construction, reconstruction, rehabilitation, replacement, and acquisition of real property (including land relating to the project and improvements to land), environmental mitigation, construction contingencies, and acquisition of equipment; and» (C) capitalized interest necessary to meet market requirements, reasonably required reserve funds, capital issuance expenses, and other carrying costs during construction
This initial phase, which is funded with the TIFIA Loan, includes (i) the construction of two reversible lanes with associated exit / entrance ramps between Valley View Lanes and Turbeville Road; (ii) the construction of managed lanes from south of IH35E — IH635 interchange to Valley View Lane; (iii) reconfiguration and rehabilitation of general purpose lanes from IH635 to Corinth Parkway; (iv) the construction of direct connectors to Sam Rayburn Tollway; (v) the reconfiguration and / or widening of general purpose lanes and the construction of an additional general purpose lane in each direction from Sam Rayburn Tollway to US380; (vi) the construction, reconstruction, widening or rehabilitation of various frontage roads, interchanges, and bridges; (vii) the construction of a collector - distributor system between President George Bush Turnpike and Sam Rayburn Tollway; (viii) the construction of a new bridge and re-purposing of the existing bridge over Lake Lewisville; and (ix) associated mitigation projects.
Project management plan consists of several phases including initiation, planning and design, execution and construction, monitoring and controlling systems.
We also deliver phase inspections for new home construction, including foundation inspection, pre-drywall inspection and walkthrough inspection.
Highlights for this Paradise Home Inspector include: Pool & Spa Inspections, Certified Well Inspection, Field Service Inspections, Structural Inspections, Mechanicals, Insulation & Ventilation Issues, Septic System Testing, Residential Home Inspections, Commercial & Apartment Property Inspections, Dispute Resolution, Licensed & Insured, Available 7 Days A Week, Drainage Issues, 4 Point Insurance & Property Inspections, Flower Mound TRCC Phase Inspections, Well Water Testing, Foreclosure Bank Inspections, Log Homes, New Construction Inspections, Home Inspection Reports Within 24 Hours w / Photos, Certified Septic Inspection, and Moisture & Water Infiltration Testing.
Highlights for this Mckinney, Texas Home Inspector include: Synthetic Stucco, New Construction Inspections, Insulation & Ventilation Issues, Licensed & Insured, TRCC Phase Inspections, Foreclosure Bank Inspections, Residential Home Inspections, Mechanicals, Septic System Testing, Home Inspection Reports Within 24 Hours w / Photos, Log Homes, Infrared / Thermal Scans, Moisture & Water Infiltration Testing, Field Service Inspections, Flower Mound Pest Inspections, Flat Roof Surveys, Drainage Issues, Termite Inspection Services, Structural Inspections, and 4 Point Insurance & Property Inspections.
Highlights for this Plano Home Inspector include: Licensed & Insured, Home Inspection Reports Within 24 Hours w / Photos, Mechanicals, TRCC Phase Inspections, Structural Inspections, New Construction Inspections, Termite Inspection Services, Residential Home Inspections, Available 7 Days A Week, Pest Inspections, Foreclosure Bank Inspections, Insulation & Ventilation Issues, and Drainage Issues.
Highlights for this Denton Home Inspector include: Structural Inspections, InterNACHI Member, Licensed & Insured, New Construction Inspections, Well Water Testing, Infrared / Thermal Scans, Flat Roof Surveys, Residential Home Inspections, Wind Mitigation Inspections, Foreclosure Bank Inspections, Log Homes, Insulation & Ventilation Issues, Mechanicals, Drainage Issues, Flower Mound Expert Witness Testimony, Pool & Spa Inspections, TRCC Phase Inspections, 4 Point Insurance & Property Inspections, Dispute Resolution, Available 7 Days A Week, and Moisture & Water Infiltration Testing.
Highlights for this Denton, Texas Home Inspector include: Home Inspection Reports Within 24 Hours w / Photos, Commercial & Apartment Property Inspections, New Construction Inspections, Moisture & Water Infiltration Testing, Home Energy Audits, Structural Inspections, Synthetic Stucco, Flat Roof Surveys, Dispute Resolution, Certified Septic Inspection, TRCC Phase Inspections, Residential Home Inspections, Pool & Spa Inspections, Septic System Testing, Flower Mound Termite Inspection Services, Licensed & Insured, Blower Door Testing, Well Water Testing, Infrared / Thermal Scans, and Expert Witness Testimony.
Highlights for this Weatherford Home Inspector include: Pest Inspections, Certified Septic Inspection, Licensed & Insured, Field Service Inspections, TRCC Phase Inspections, Septic System Testing, Mechanicals, Termite Inspection Services, Commercial & Apartment Property Inspections, FHA / VA Foundation Certification, Foreclosure Bank Inspections, New Construction Inspections, Residential Home Inspections, Flat Roof Surveys, Flower Mound Indoor Air Quality, Structural Inspections, Home Inspection Reports Within 24 Hours w / Photos, InterNACHI Member, Pool & Spa Inspections, and Well Water Testing.
Highlights for this Waxahachie Home Inspector include: InterNACHI Member, Foreclosure Bank Inspections, Licensed & Insured, Field Service Inspections, Pool & Spa Inspections, Mechanicals, 4 Point Insurance & Property Inspections, FHA / VA Foundation Certification, Septic System Testing, Home Inspection Reports Within 24 Hours w / Photos, New Construction Inspections, Drainage Issues, Structural Inspections, Insulation & Ventilation Issues, Flower Mound Certified Septic Inspection, TRCC Phase Inspections, Moisture & Water Infiltration Testing, Log Homes, Infrared / Thermal Scans, Residential Home Inspections, Commercial & Apartment Property Inspections, and Home Energy Audits.
Highlights for this Denton Home Inspector include: Certified Septic Inspection, Log Homes, Foreclosure Bank Inspections, TRCC Phase Inspections, Commercial & Apartment Property Inspections, Residential Home Inspections, Pest Inspections, Flat Roof Surveys, FHA / VA Foundation Certification, Mechanicals, Licensed & Insured, Well Water Testing, Certified Well Inspection, Termite Inspection Services, Flower Mound Pool & Spa Inspections, Septic System Testing, InterNACHI Member, Structural Inspections, and New Construction Inspections.
Construction of a new barge landing area and elevated bridge and boardwalks will improve visitor and employee safety by reducing the risk of human - bear conflicts; provide safe and dependable access for the phased relocation of facilities and park concession operations; protect and enhance key park resources in the Brooks River area, including brown (grizzly) bears, salmon and trout, and cultural resources; improve visitor experience in the area; and connect infrastructure utilities between the Valley Road Administrative Area and the north side of Brooks River.
With many significant milestones ahead for SFMOMA — including groundbreaking for its major expansion project and the launch of a dynamic slate of off - site programs during the construction phase for the new building, and the reopening of the new museum in early 2016 — this year's auction promises to be an especially celebratory occasion.
IGBP will continue many of its successful approaches to implementation from its first phase including: building research networks to tackle focused scientific questions; promoting standard methods; undertaking long timeseries observations; guiding and facilitating construction of global databases; establishing common data policies to promote data sharing; undertaking model inter-comparisons and comparisons with data; and coordinating complex, multi-national field campaigns and experiments.
We provided overall assistance in this ca. 20,000 sqm GLA project, including the structured financing through a secured EURO bonds issuance programme, acquisition of shares in the SPV, interim joint venture period with the developer partner, land acquisition, development contract (CPI), construction phase, and lease commercialisation (BEFAs).
Our attorneys assist our clients in all phases of public and private construction contracting and dispute resolution, including: licensing; compliance; bid protests; contract drafting, negotiation and enforcement; claims notice and preservation; and litigation and arbitration claims involving defective design and construction, delay and interference, lien and bond claims, insurance coverage disputes and product liability claims.
Alexander Grant Qualified: 2004 Made partner: 2015 Key cases: Currently advising on the London Array, the world's largest operating offshore wind farm — advising on project implementation, delivery and dispute resolution on all package contracts since 2011, including claims advice during the construction phase and following transfer of transmission assets to an OFTO, re-negotiation of two contract packages and providing defect - related advice in relation to potential claims against contractors.
These representations have spanned all phases of the projects, including, joint - venture formation and dissolution, site acquisition, construction, and permanent financing, leasing and sales.
Mr. Ebert has extensive experience in many phases of civil practice, including appeals, in matters involving insurance defense, insurance coverage, bad faith, third - party liability, self - insured defense, defense of intentional torts, and construction, environmental, and commercial litigation.
We will soon embark on the second phase of Stage 1 Manufacturing Project, which will include the construction of a facility on site.
The initial phase of our Stage 1 Manufacturing Project, which included mass grading, was completed at the factory construction site last November.
• Manage all pre-design phases for all renovation and new constructions projects within facilities and solicit bids and award contracts, and perform feasibility studies that include cost estimates and RFPs.
Managed all construction activities following project approvals and coordinated work with Property Management to include phasing, staging and site logistics
Orchestrated full range of operations and phases for wide variety of construction projects, including environmental remediation, utility, storm drainage, and design layout.
Supervise new construction projects including quarters, office space and all phases of construction, remodeling, planning, and management activities.
Assisting in various phases in the construction of custom - ordered cabinets including manufacturing, shipping, and installation
• Fowler Ridge Wind Farm Phase I & III, Fowler, IN Client: BP Alternative Energy, 8/2008 — 4/2009 Scope: $ 197M BOP Contract, 300MW Wind Farm, includes design and construction of Substation, Collector System, Access Roads, Turbine Foundations, and O&M Building.
Contributed in various phases of architectural projects, including research, design, and construction documents.
Developed project teams, coordinated with HR in hiring and terminating of individuals Projects: • Milford Wind Corridor Project Phase I, Milford, UT Client: First Wind, 4/2009 - Present Scope: $ 70M BOP Contract, Includes design and construction of collector system, substation, 89 miles of 345kv transmission line, operations and maintenance facility, SCADA system, access roads, turbine foundations, erection, and tower wiring as necessary to support (58) Clipper 2.5 MW C - 99 generators and (39) GE 1.5 MW XLE generators; a total of 204MW potential output.
a b c d e f g h i j k l m n o p q r s t u v w x y z