Sentences with phrase «construction planning change»

Throughout your many years of experience, how have you seen construction planning change in terms of litigation cases?

Not exact matches

Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; the actual results of reclamation activities; conclusions of economic evaluations; meeting various expected cost estimates; changes in project parameters and / or economic assessments as plans continue to be refined; future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled «Risk Factors» in the Company's Annual Information Form for the year ended December 31, 2017 dated March 15, 2018.
Such risks, uncertainties and other factors include, without limitation: (1) the effect of economic conditions in the industries and markets in which United Technologies and Rockwell Collins operate in the U.S. and globally and any changes therein, including financial market conditions, fluctuations in commodity prices, interest rates and foreign currency exchange rates, levels of end market demand in construction and in both the commercial and defense segments of the aerospace industry, levels of air travel, financial condition of commercial airlines, the impact of weather conditions and natural disasters and the financial condition of our customers and suppliers; (2) challenges in the development, production, delivery, support, performance and realization of the anticipated benefits of advanced technologies and new products and services; (3) the scope, nature, impact or timing of acquisition and divestiture or restructuring activity, including the pending acquisition of Rockwell Collins, including among other things integration of acquired businesses into United Technologies» existing businesses and realization of synergies and opportunities for growth and innovation; (4) future timing and levels of indebtedness, including indebtedness expected to be incurred by United Technologies in connection with the pending Rockwell Collins acquisition, and capital spending and research and development spending, including in connection with the pending Rockwell Collins acquisition; (5) future availability of credit and factors that may affect such availability, including credit market conditions and our capital structure; (6) the timing and scope of future repurchases of United Technologies» common stock, which may be suspended at any time due to various factors, including market conditions and the level of other investing activities and uses of cash, including in connection with the proposed acquisition of Rockwell; (7) delays and disruption in delivery of materials and services from suppliers; (8) company and customer - directed cost reduction efforts and restructuring costs and savings and other consequences thereof; (9) new business and investment opportunities; (10) our ability to realize the intended benefits of organizational changes; (11) the anticipated benefits of diversification and balance of operations across product lines, regions and industries; (12) the outcome of legal proceedings, investigations and other contingencies; (13) pension plan assumptions and future contributions; (14) the impact of the negotiation of collective bargaining agreements and labor disputes; (15) the effect of changes in political conditions in the U.S. and other countries in which United Technologies and Rockwell Collins operate, including the effect of changes in U.S. trade policies or the U.K.'s pending withdrawal from the EU, on general market conditions, global trade policies and currency exchange rates in the near term and beyond; (16) the effect of changes in tax (including U.S. tax reform enacted on December 22, 2017, which is commonly referred to as the Tax Cuts and Jobs Act of 2017), environmental, regulatory (including among other things import / export) and other laws and regulations in the U.S. and other countries in which United Technologies and Rockwell Collins operate; (17) the ability of United Technologies and Rockwell Collins to receive the required regulatory approvals (and the risk that such approvals may result in the imposition of conditions that could adversely affect the combined company or the expected benefits of the merger) and to satisfy the other conditions to the closing of the pending acquisition on a timely basis or at all; (18) the occurrence of events that may give rise to a right of one or both of United Technologies or Rockwell Collins to terminate the merger agreement, including in circumstances that might require Rockwell Collins to pay a termination fee of $ 695 million to United Technologies or $ 50 million of expense reimbursement; (19) negative effects of the announcement or the completion of the merger on the market price of United Technologies» and / or Rockwell Collins» common stock and / or on their respective financial performance; (20) risks related to Rockwell Collins and United Technologies being restricted in their operation of their businesses while the merger agreement is in effect; (21) risks relating to the value of the United Technologies» shares to be issued in connection with the pending Rockwell acquisition, significant merger costs and / or unknown liabilities; (22) risks associated with third party contracts containing consent and / or other provisions that may be triggered by the Rockwell merger agreement; (23) risks associated with merger - related litigation or appraisal proceedings; and (24) the ability of United Technologies and Rockwell Collins, or the combined company, to retain and hire key personnel.
Darin Kingston of d.light, whose profitable solar - powered LED lanterns simultaneously address poverty, education, air pollution / toxic fumes / health risks, energy savings, carbon footprint, and more Janine Benyus, biomimicry pioneer who finds models in the natural world for everything from extracting water from fog (as a desert beetle does) to construction materials (spider silk) to designing flood - resistant buildings by studying anthills in India's monsoon climate, and shows what's possible when you invite the planet to join your design thinking team Dean Cycon, whose coffee company has not only exclusively sold organic fairly traded gourmet coffee and cocoa beans since its founding in 1993, but has funded dozens of village - led community development projects in the lands where he sources his beans John Kremer, whose concept of exponential growth through «biological marketing,» just as a single kernel of corn grows into a plant bearing thousands of new kernels, could completely change your business strategy Amory Lovins of the Rocky Mountain Institute, who built a near - net - zero - energy luxury home back in 1983, and has developed a scientific, economically viable plan to get the entire economy off oil, coal, and nuclear and onto renewables — while keeping and even improving our high standard of living
Pueblo's Design Build services include, yet not limited to, custom unitary change - outs, duct and piping design, central plant construction and targeted kw / h reduction plans.
Levy plans to adapt to changes that are occurring in downtown Los Angeles, including the construction of new hotels that will boost attendance at LACC.
They want frontage space along 95th Street, at least six acres to make changing space plans worthwhile, a speedy land negotiation and construction process, shared funding and a development of a campus environment.
We actually did have a lot of input into our house - it was a custom design (there are of course people who build standard designs who have even less input, and they are perfectly happy with the house), and we even did some changes in the plans during construction (the builder said, «If I move this wall here, it will make the closet bigger» and we were like, YES!
At 8:30 a.m., during a panel discussion about the MTA's five - year plan for construction and renovation projects, representatives of the Permanent Citizens Advisory Committee to the MTA and the Urban Land Institute New York introduce an initiative titled «Keeping NY on Track: The Importance of the MTA Transit Network in a Changing World»; Rosenthal Pavilion, 10th floor, Helen & Martin Kimmel Center for University Life, NYU, 60 Washington Square S., Manhattan.
But that plan means the location of each temporary lot will change six times over the course of construction, said Borough Hall Land Use Director Robert Englert.
Late Friday afternoon, schools chancellor Carmen Fariña proposed a change to the city's capital plan that would divert $ 210 million from charter school construction and partnerships and toward pre-kindergarten expansion.
Jamestown's plan to expand Chelsea Market would require a change to the city's zoning of the block to include it in the Special West Chelsea District, which was created to allow the construction and renovation of the High Line.
Syracuse Build, a workforce development program, is designed to give city residents jobs on construction projects, including planned changes to Interstate 81.
On - topic question topics included the amount of HPD funding in this specific project, possible changes in City Planning Commission rules on building height, how many of the 20,000 units reported by the Mayor were new construction and how many were preservation work, how people can seek to live in the units being constructed at this specific project and a lawsuit challenging the City's community preference policy.
Meanwhile, get your science news at our website, www.scientificamerican.com, or you can also check out the November issue of the magazine, including a long planned article about how the construction of Egypt's great pyramid changed civilization.
The public school construction planning and submission process applies only to school building renovations or alterations that go beyond cosmetic changes and are subject to state and local building codes and reviews, and require that the construction documents bear the seal of a licensed engineer or architect.
That could change if New Yorkers approve a $ 2 billion borrowing plan that would spend money on school construction, including expanding schools to accommodate new pre-kindergarten classes, and install technological upgrades to the state's K - 12 schools.
Liberals: Start a new, 10 - year investment in social housing infrastructure, prioritizing affordable housing and seniors» facilities (including building more units and refurbishing existing units); encourage the construction of new rental housing by removing all GST on new capital investments in affordable rental housing; loosening the existing qualification rules for the Home Buyers» Plan to allow more Canadians affected by sudden and significant life changes to access their RRSP savings for a down payment; review escalating home prices in high - priced markets, including Toronto and Vancouver, and review all policy tools that could keep homeownership within reach for more Canadians.
Future Changes: Are there construction plans near your land, like new highways, schools, shopping centers or other improvements?
Pratt Institute's Programs for Sustainable Planning and Development (PSPD) will present lectures on environmental justice in New York, climate change and preservation, case studies of New York City development projects, and on construction and facilities...
WHILE WE WORK operates as a storyteller and as a score that oscillates between the liveness and the memory of Agora's work in relation to their building — a space in constant mutation, where working phases and changes of plans are part of its daily construction, as well as the multiple informations, stories and rumours that have been circulating.
NCCARF: This project examines the likely impacts on the built environment of increased intensities in weather - related natural hazard events, in order to identify the possibilities of using the regulatory mechanisms of building construction, housing insurance and planning in climate change adaptation.
Most importantly, changing the basis for the new source rule away from CCS would put it — and therefore the much more important Clean Power Plan — on much surer legal footing, with likely no practical difference in terms of the construction of new plants over the next decade.
Northeast cities have employed a variety of mechanisms to respond to climate change, including land - use planning, provisions to protect infrastructure, regulations related to the design and construction of buildings, and emergency preparation, response, and recovery.106 While significant progress has been made, local governments still face limitations of legal authority, geographic jurisdiction, and resource constraints that could be addressed through effective engagement and support from higher levels of government.
Farther south, New York City has taken numerous steps to implement PlaNYC, a far - reaching sustainability plan for the city, including amending the construction code and the zoning laws and the implementation of measures focused on developing adaptation strategies to protect the City's public and private infrastructure from the effects of climate change; 26 some major investments in protection have even been conceptualized.
Some of his suggestions for local planning initiatives include: Preserve wetlands by passing local wetlands protection laws; maintain biodiversity in the Hudson Valley by protecting sensitive lands through land acquisition; refrain from building in flood plains; require all new building to be «green» and sustainable and, ideally, change local building codes to require LEED certification; switch all public and government buildings to energy suppliers that provide wind and solar options as alternatives; implement smart growth communities by keeping construction in areas that are already developed thus preserving green corridors; and support cap - and - trade laws to decrease CO2 levels.
If contingencies for unexpected or unlikely events are not properly planned for during design, then changes need to be made during construction, which can add considerable time and expense.
BlueFire Renewables, Inc. (OTC Bulletin Board: BFRE), a company focused on changing the world's transportation fuel paradigm through the production of renewable fuels from non-food cellulosic wastes, announced that it has finalized and signed an Engineering, Procurement and Construction (EPC) contract for its planned cellulosic ethanol facility in Fulton, MS.. The facility will be engineered and built by Wanzek Construction, Inc., a wholly owned subsidiary of MasTec, Inc. (NYSE: MTZ), for a fixed price of $ 296 million which includes an approximately $ 100 million biomass power plant as part of the facility.
That may change ultily companies plans well out into the future but has little bearing on new construction needed to maintain power supply reliability in the near term of the next decade or so.
Rather than a decrease in commercial construction, we see different types of buildings now and a changed planning mindset and model.
Therefore, they are well suited to use in a planning law context, where it is possible to demonstrate demarcation changes in boundary disputes, a change of use, or the timing of construction of an unauthorised development.
In the past few years, we have seen the passage of the Affordable Care Act, Medicare Part D and significant changes to the pension laws that affect the construction and administration of both traditional defined benefit pension plans and 401 (k) plans.
Partner Municipal Law and Other Government, Municipal Planning, Environmental, Environmental Law, Expropriation, Land Development, Commercial Real Estate, Climate Change, Team North ®, Construction
(2) Despite any provision of the Act, if an owner developer is in compliance with the dates for the beginning of construction of each phase as set out in the Phased Strata Plan Declaration or amended Phased Strata Plan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner develoPlan Declaration or amended Phased Strata Plan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner develoPlan Declaration, a strata corporation established by the deposit of a phased strata plan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner developlan may not create, change, repeal, replace, add to or otherwise amend any bylaws dealing with any of the following matters until the annual general meeting held following the deposit of the final phase or until an election not to proceed under section 235 or 236 (2) of the Act, unless the strata corporation obtains the written consent of the owner developer:
The ability to read and understand blueprints and other construction documents, as well as, make any positive changes to the floor plan.
Assess contractual obligations and devise plans for project construction, aligning with cost estimation; adjust cost estimates for changes in work throughout construction.
Utilizes computer in administering construction contracts, prepares monthly progress payments, contract change orders, interpretation of project with plans and specifications, coordinates final inspection and job closeout
• Successfully lead three construction projects to fruition by employing exceptionally well - placed multitasking and project management skills • Complete all projects to date within allocated budgets, 15 out of which had extra cash left over • Confer with clients to determine their project management needs and develop plans to meet those needs • Supervise and direct overall project activities, including planning and coordinating • Maintain change order and submittal control logs and prepare project documentation • Handle contract submittals so that they are submitted in a time - efficient manner • Ascertain the project quality control plans are in effect and followed properly • Handle site investigation duties and manage review of ordinances and utility service research
• Recommended changes and strategic plans to better construction facilities.
• Researched and implemented designs solutions on customers» specifications • Drew and implemented architectural plans for construction purposes • Provided advice on appropriate changes in plans and designs • Developed time and resource estimates • Documented and implemented conceptual designs • Performed configuration management tasks Major Accomplishments • Met deadlines consistently even in the wake of urgent projects • Integrated a very complex architectural design with an engineering discipline in record time
Tags for this Online Resume: Management, Quality, PMO, Construction, Green Belt, Planning, PMP, Budgeting, Change Control, Coaching, Atlanta, Facility, project
Tags for this Online Resume: Management, Project Management, Civil / Structural, Construction, Engineering, Adobe Acrobat, Autocad, Schedule control, Project Reports, Quality Control, Green Buildings, Contract Administration, Project Planning, Earned Value Management, Change Orders
Project Manager with over 28 years of experience in all phases of construction and program management in both heavy civil and building including: Assist with the development and execution of project plans & schedule; Bid preparation and solicitation; Contract administration and monitoring project performance (cost, schedule, changes, safety and quality QA / QC)
Tags for this Online Resume: Facilities Managemnent, Construction & Facilities Operations, Project & Program Management, Facilities Development, Corporate Real Estate, Contract and Lease Negotiations, Strategic Planning, Revenue, Capital Budgeting, Operational Budgeting, Vendor Relations, Cross Functional Collaboration, Process Development, Process Implementation, Process Improvement, Change Management, Mergers, Procurement, Purchasing, Team Building, Leadership, Regulatory Compliance, Assessments, Standards Develpoment, Standards Implementation, Strategy, Portfolio Management, Orginizational Development, Risk Management, Contract Management, Construction Management, Sustainability
PROFESSIONAL EXPERIENCE New York City School Construction Authority / The Liro Group • NY 2008 — Present Project Officer Manage all facets of project planning and specifications and attend all pre-construction meetings to ensure no changes are required.
Tags for this Online Resume: Turnarounds, Management, Acquisitions, Planning, Architectural, Autocad, Lean / Six Sigma, Budgetary, Capacity Planning, Change Management, MS Office, Houston, Engineering, Construction, Design Build, Technical Writer, Artist
Tags for this Online Resume: Project Management, Construction Management, Business Development, Presentation Strategy, Program Management Office, Policy and Procedure Development, Operations Refinement, Capital Improvement Programs (C - I - P), Aricitect and Engineering Management, Project Controls Management, Organization Leadership, Alternative Delivery Methods, Public - Private - Partnership Initiatives (3PI), Airport Programs, Terminal Buildings, Rent - A-Car Facilities, C - I - P, Leadership, Strategy, Capital Improvement Projects, Leadership Strategy, Operations Leadership, Estimating, Policy, Professional Presentations, Public - Private - Initives (3PI), Scope Definitions, Scheduling, Administering, Initiating, Planning, Execution, Controlling, Closing, Human Resources, Communications, Risk Assessments, Risk Analyses, Response Plan, Project Plan, Program Plan, Submittals, Quality Control, Quality Analysis, Manage Team, Performance Reporting, Performance Analyses, Terminal Building, Landside Developments, Airfield Improvements, Communication Systems, Safety, Security, Transportation Systems, Infrastructure, Land Acquisition, Logistics, Operations, Integration, Team Building, Light Rail Transit, Intermodal, Facilities, Consolidated, Rail Systems, Ports, Land Facilities, Condensation, Contracts, Milestones, Coordination, Meetings, Performance, Matrix, Change, Management, Change Process, Change Management, Change Estimate, Negotiation, Controls, Corporate, Divisions, Analysis, Highways, Roads, Bridges, Proposals, Review, Presentation, Options, Alternatives, Right - Of - Way, Rail, Transit, Bus, High - Speed - Rail, Light - Rail, Intermodal - Facilities, Consolidated - Facilities, Maintenance - Facilities, Scope, BS, BBA, Building Development, MBA, Engineering Management, Transit Systems, Community Facilities
Tags for this Online Resume: Project Manager, Natural Stone, AutoCad, Construction Management, Value Engineering, Contractors, Project Planning, Process Schesuler, Strategic Planning, Contract Negotiation, Change Orders, Requisitions, Budget Monitoring, Blueprint Reading, Shop Drawings, Revisions, Surveying, Field Supervision, Union Experience, Estimating, Procurement, Export / Import, Metal Fabrication, Die Casting, Mold Casting Centrifugal, Expediting, Job Closeout
That's where I discovered anomalies in tax references on listings, comparing houses that happened to be on the same street, same square footage as per builder plans, no odd or addt» l changes in construction, built and sold in the same market time.
Disclaimer: Gallagher and Henry's policy is one of constant attention to improving design and construction materials and while every effort has been made to assure the accuracy of information presented on our site, please note that all dimensions, features, models, communities, floor plans, site plans, elevations, and prices displayed are subject to change without notice.
a b c d e f g h i j k l m n o p q r s t u v w x y z