In the spirit of cooperation, students from Olive School will be using the Greens Park playground and basketball court area throughout their school day during the Olive School
construction scheduled for the 2015 - 2016 school year.
According to a statement by the county,
a construction schedule for projects at the park will be finalized by the end of September.
«This is the second consecutive year that our show will be held in September again to accommodate
the construction schedule for the Convention Center's renovation,» said Richard Baker, auto show manager.
Tondu Corp abandons plans for the Nueces IGCC plant in Corpus Christi, Texas, citing rising costs and uncertain
construction schedules for IGCC.
Not exact matches
Additionally, have enough money set aside to pay all your fixed business expenses such as payroll, rent, etc.,
for up to six months, in case
construction falls behind
schedule, or business is slow until you build momentum.
Opened by International Harvester in 1974 to remanufacture diesel engines and engine components
for its truck and agricultural and
construction equipment dealers, the plant had lost $ 2 million in the most recent fiscal year, and the big question was whether the employees, previously nonunion, would vote to join the Teamsters or the United Auto Workers in an election
scheduled for March.
The visitor center
construction cost $ 176.4 million, and the reopening is
scheduled for July 4.
Engineering
construction activity has nearly doubled over the past two years and this upswing is likely to be sustained in the period ahead, with a number of significant road and mining - related projects
scheduled for commencement in 2004 (Graph 41).
She holds a key role in coordinating support requirements
for construction schedules and ensuring timely funding and proper disbursements to subcontractors and vendors.
But the contractors shifted the
scheduling slightly so that demolition works could continue in order to make way
for the
construction of the trackside building elements (i.e. the atrium, café, reception, and The Gallie - Lewis - Dean Gym).
Under the current
schedule, work on the fountain would begin shortly after Labor Day and last through spring of 2009, said John Regalado, director of capital
construction for the park district.
Under the current
schedule, work on the fountain would begin shortly after Labor Day and last through spring 2009, said John Regalado, director of capital
construction for the Park District.
Tentatively
scheduled to begin
construction in mid-1995, the plan also calls
for the extension of Roosevelt Road over the Metra tracks and connected to Columbus Drive as well as the newly relocated Lake Shore Drive.
Village Administrator Russ Loebe said a letter was being sent from the Village Board asking whether the Park Board wants the school, which is
scheduled for demolition to make way
for construction in the spring.
NEW LENOX — A recently proposed land sale could infuse some cash into New Lenox's financially strapped Park District and keep
construction on
schedule in an area earmarked
for a town center.
The possibility of a village land purchase came up this month as a way of keeping
construction projects planned
for the New Lenox Commons area on
schedule.
The President is
scheduled to cut the sod
for the
construction of a District Hospital at Nkoranza, commission a new Divisional Police Headquarters
for the Techiman Municipality, and also commission an administrative block
for the Techiman North District at Tuobodom.
The MOUs will invite input on project design, including aesthetic design of certain project elements such as sound walls, consideration
for traffic and parking, utilities, drainage, pest and dust control, transit - oriented development,
construction schedule and duration and community safety and quality of life.
Comptroller Scott Stringer, Public Advocate Letitia James and Buildings Department Commissioner Rick Chandler left yesterday
for Hollywood to attend a Building and
Construction Trades Council of Greater New York conference, where all three are
scheduled to speak.
Construction is
scheduled to begin this fall and will transform the facility into a limited secure residential center
for 25 people.
Comptroller Scott Stringer, Public Advocate Letitia James and Buildings Department Commissioner Rick Chandler left Thursday
for Hollywood, Fla., to attend a Building and
Construction Trades Council of Greater New York conference, where all three are
scheduled to speak.
Each capital project request shall show: recommended priority; development; time
schedule; estimated costs
for planning, site of right of way,
construction, equipment and other features; status of plans and land acquisition; anticipated effect of project on annual operating budget; possible sources of financial aid; recommended expenditures by years; and such other information as the Budget Director and Commissioner of Environment and Planning may deem advisable.
Construction is currently scheduled for the 2019 construc
Construction is currently
scheduled for the 2019
constructionconstruction season.
The Riverbend project offered an opportunity to work
for much of the winter — unusual in Buffalo — as well as what one
construction worker called «unbelievable overtime» in order to stick to the tight
schedule.
That makes it easier
for COR Development to proceed with its $ 342 million project, which includes a 134 - room Aloft Hotel that is
scheduled to open May 31 and
construction of two mixed - use buildings with apartments and retail space.
The Upper East Regional Minister, Rockson Bukari commended Queiroz Galvao
construction limited
for work done on the road and urged them to work within
schedule.
Construction of the Computer Chip Commercialization Center (Quad - C) is currently underway and is
scheduled for completion by the end of 2014.
«Further we believe that even if the [School
Construction Authority] were to adhere to its stated construction schedule and the verbally proposed September 1 move - in dates — less than a week before schools open — it would preclude the schools from setting up operations in time for the 2015 - 2016 school year,» CEC 3's le
Construction Authority] were to adhere to its stated
construction schedule and the verbally proposed September 1 move - in dates — less than a week before schools open — it would preclude the schools from setting up operations in time for the 2015 - 2016 school year,» CEC 3's le
construction schedule and the verbally proposed September 1 move - in dates — less than a week before schools open — it would preclude the schools from setting up operations in time
for the 2015 - 2016 school year,» CEC 3's letter stated.
Aiello said the city's lawsuit also could threaten a $ 27 million loan from the Community Preservation Corp.
for two four - story commercial and residential buildings on which
construction is
scheduled to begin in January.
Other bills that were introduced, but not voted on, included measures to create new penalties
for those who fail to report
construction fatalities, a requirement
for construction companies to give the city detailed reports about
scheduled construction activities months in advance, and a mandate
for drug and alcohol testing of
construction workers at certain job sites.
Southold Town Board members decided Tuesday night to postpone a
scheduled vote on a proposed code change that could pave the way
for construction of a cellphone tower behind Town Hall.
The state Legislature's budget committee is
scheduled to vote Wednesday on a proposal containing an estimated $ 7.5 million tax exemption
for construction companies that do work
for nonprofit groups.
Bidders are advised that a pre-bid meeting
for the
construction of this project is
scheduled Wednesday, April 27, 2016 at 10:00 A.M., local time, at Buffalo Riverfest Tewksbury Lodge, 249 Ohio Street, Buffalo, NY 14204.
MANHATTAN — A feud between Inwood City Councilmen Robert Jackson, City Councilman Ydanis Rodriguez and State Senator Adriano Espaillat over a Columbia University
construction project has resulted in dueling community meetings
scheduled for this weekend.
According to Dan Branda, a spokesman
for the county executive, an engineer's consortium to arrive at a
construction schedule was held on March 1, but said the specifics of the
schedule are «too premature» to discuss.
Among the roads
scheduled for work in the first part of the 2017
construction season are Springville Boston Road in the Town of Concord, Route 240 in the Town of Colden, Goodrich Road in the Town of Clarence and Lake Avenue in the Village of Blasdell.
On January 8, jury selection is
scheduled to start in the trial of Cuomo's former close confidant and aide Joe Percoco, along with three
construction and energy executives who had business before the state and are accused of arranging bribes
for Percoco and his wife in exchange
for Percoco's government influence.
Construction crews preparing
for the 2004 Athens competitions,
scheduled to open August 13, keep hitting ancient buildings and artifacts.
ITER, which is poised to begin
construction at the reactor site in southern France, has yet to gain final approval
for its design,
schedule, and cost, collectively known as the project's baseline.
The concept is, alas, still in development, but a full - scale running model is
scheduled for construction this summer, and a stackable - car queue could appear near you in as little as five years.
(Inside Science)--
Construction for the Deep Underground Neutrino Experiment, also known as DUNE, began this July and is
scheduled to be completed around 2024.
But when the drafting of a new law was
scheduled for the 1996 legislative session, dozens of school districts had more than a year to seize the chance to pass
construction - bond issues under the current law.
The new building, which is currently under
construction on San Antonio Boulevard, across the street from the Welcome Center, is
scheduled to be ready
for students by midyear.
Educators and bias members will be asked to participate in the test
construction meeting to build operational core forms to meet PARCC assessment blueprints
for the performance - based and short - answer components of the summative assessment,
scheduled to be administered during the school year.
They gave $ 28 million to Michigan State University, Eli Broad's alma mater,
for the
construction of the Eli and Edythe Broad Art Museum at MSU, designed by Zaha Hadid and
scheduled to open in 2012.
If the obligation of BUILD Grant funds
for construction or other activities is contingent on the project being included in the relevant planning documents, applicants should include a
schedule in their application demonstrating they reasonably expect to have the project included in such planning documents by the statutory deadline.
Commencement of Phase II
construction began in late 2012 and substantial completion is
scheduled for September 2015.
Construction completion is
scheduled for 2018.
If the obligation of INFRA Grant funds
for construction or other activities is contingent on the project being included in the relevant planning documents, applicants should include a
schedule in their application demonstrating they reasonably expect to have the project included in such planning documents by the statutory deadline.
* Second R8 model powered by 5.2 - litre V10 FSI petrol engine
scheduled to open
for UK order in January 2009
for first deliveries next spring * Available with manual gearbox at # 99,575 OTR, or with R tronic sequential shift transmission at # 104,665 OTR (R8 4.2 V8 # 77,405 OTR and # 82,495 OTR) * 5,204 cc V10 produces 525PS at 8,000 rpm and 530Nm at 6,500 rpm (R8 4.2 V8 420PS at 7,800 rpm, 430Nm at 4,500 rpm) * 0 - 100kmh in 3.9 seconds, top speed 313kmh, combined mpg 20.6 (R8 4.2 V8 R tronic 0 - 100kmh in 4.6 seconds, top speed 299kmh, combined mpg 20.7) * Combines classic mid-engine configuration with advanced all - aluminium Audi Space Frame (ASF)
construction and quattro permanent four - wheel - drive * World's first all - LED headlamps as standard, plus Audi magnetic ride adaptive damping and Bang & Olufsen audio system