All too often
construction scheduling delays lead to disputes, withholding of project funds and, eventually, litigation.
Not exact matches
On the contrary, I believe that in the same wait that we have seen a
delay in the social movement with regard to the
construction of Europe, the liberal
construction of Europe, the social movement is way behind
schedule regarding globalisation.
Arrival of
construction materials usually is
delayed if a project is behind
schedule.
But by then,
construction was already well behind
schedule, with the
delays ultimately leading to AMS backing out.
Those involved with the design and execution of the infrastructure in question must consider the environmental impact of the job, the successful
scheduling, budgeting, site safety, availability of materials, logistics, inconvenience to the public caused by
construction delays, preparing tender documents, etc..
Retirement of old capacity will occur on
schedule, while
construction of new coal capacity may be
delayed or canceled.»
The museum's unorthodox facade, which the architects refer to as the «veil,» has proved very tricky to fabricate, leading to
delays in the
construction schedule.
Permitting
delays will put pipeline siting and
construction years behind
schedule.
He has provided expert testimony in various legal forums on issues including differing site conditions, defective contract documents, adequacy of design,
construction defects,
schedule delays, productivity evaluations, and cost analysis.
It is fair to suggest then that
construction disputes that arise should be resolved quickly so as to minimise
schedule delays.
It is clear then that a significant proportion of
construction work in the process industry suffers from disputes and that these disputes often lead to
schedule delays and to a souring of the working environment between the parties.
His vast experience in
construction claims services includes: the preparation and defense of
construction delay and disruption claims through the use of detailed
schedule analyses techniques, providing litigation support, issue analysis, damage assessments as well as productivity analyses.
The building (which would become Douglas Hall) went into
construction during the summer, but the project faced numerous
delays and was far from ready for the college's fall class
schedule.
We advance and defend all types of
construction proceedings in all areas of
construction law including
construction lien claims, damage,
delay,
scheduling and impact claims,
construction trust claims, deficiency claims, claims on bonds and letters of credit, claims involving tendering and procurement and professional liability claims.
Achieved project deadline by managing /
scheduling / leading contracted
construction crew with a flexible staff of 25 personnel, working extended hours for months, and influencing equipment vendor to subcontract 40 % of work (because of drastic delivery
delays).
Created and applied solutions to ongoing
construction issues such as sub-contractor
scheduling conflicts and building material
delays.
Performed
schedule analysis to determine causes and responsibility for
construction project
delays
I have the motivation and the ability to bring quality
construction services... professional Knowledgeable in
construction safety Commercial
construction expert Project
scheduling Building... performance on site to all site
construction managers Avoided
construction delays by efficiently following
In fact, immediately after the hurricanes, projects
scheduled to start
construction have been
delayed or cancelled.
Accurate documentation of lease terms, including: services, sustainability standards, infrastructure,
construction, work provisions,
scheduling, delivery and / or
delay conditions and operating costs review