Sentences with phrase «construction zones with»

Our trek took us through several tight construction zones with rapid lanes changes and tight barrier restrictions, and the vehicle handled it all like a champ.
Persons NOT ELIGIBLE to request dismissal by taking the safety course include those persons who have completed a driver's safety course within the last 12 months preceding the date of the current offense, persons who hold a Commercial Driver's License, persons who have been charged with a speed greater than 24 miles per hour over the posted limit, persons who have been charged with any offense in a construction zone with workers present.
You should also separate your temporary makeshift kitchen area (s) from the construction zone with plastic barrier (s).

Not exact matches

Commercial REALTORS ® who have membership with RAHB know the intricacies of buying, selling or leasing property — from space planning, zoning information, municipal governments, environmental concerns, construction, tax assessments, appraisals, financing and market values, to detailed paperwork and closing procedures.
It's important to be familiar with building regulations prior to beginning construction, and there are lots of resources available online for those looking to convince their local zoning committee that what they're proposing is on the level and perfectly acceptable.
Really, who came up with using construction zones and killer ahead in the same sentence.
Together with his older brother, Warren, Sammy owns and operates Winder Construction, a business he finds as satisfying as a two - yard plunge into the end zone.
Coupled with the fact that the spa is still a construction zone (and thus is not terribly «atmospheric» at the moment), I think they really should consider cutting ALL of their prices there until construction is complete.
I'm a little late in commenting, but we just had a construction Zone Breakfast with my son and it was a big hit!
• A 27 - year - old Orland Park woman caught driving 66 mph in a 35 - mph construction zone was charged with DUI and speeding during an Oct. 11 traffic stop on the 15800 block of LaGrange Road.
They have a Kid's Zone for interactive learning and a play space with a forest, castle, board games, a construction corner, and a reading area.
Today, Mr. de Blasio seeks to pass a mandatory inclusionary zoning plan for the entire city, and has wedded it to a set of alterations to existing codes that would let developers build without concern for creating parking or keeping their construction in context with the area.
And the mayor's call for the construction of tens of thousands of units of vitally needed new housing is the best example of his vision: His proposal calls for new construction and zoning changes mostly in areas that can support new housing — along key subway routes and with parks and other services thought about from the start.
So - called «enabling» legislation provides for up to four casinos in the first phase of construction with zones limited to the Catskills, the Albany area and the Southern Tier.
Together with the 57 Local Council Development Areas, a total of 114 inner roads — two per LCDA — have been awarded for completion next year and to crown it all, the governor has approved the construction of flyover bridges at two of Lagos» most problematic traffic zones — Ajah and Abule Egba.
The de Blasio administration's «Mandatory Inclusionary Housing» program would require some new construction to include permanently affordable housing, and their «Zoning for Quality and Affordability» would eliminate parking requirements and increase building heights, among other changes, with the goal of making it easier to build affordable units and senior housing.
A new advisory committee will provide residents and businesses with more information about work going on on their blocks, a new plan with Con Ed will lower energy costs along the stretch and a «major ad campaign» will promote stores in the construction zone.
He envisions a true complete - streets treatment for Second Avenue after subway construction ends, with loading zones, performance - based parking, and a protected bicycle path.
William Garbarino, Islip GOP chairman, said he understood that some unions were unhappy Zarcone would be willing to give up his place on the planning board, which deals with zoning issues affecting the construction industry.
One of the counts reads: «That you Air Chief Marshal Alex S Badeh (whilst being the Chief of Air Staff, Nigerian Air Force) and IYALIKAM NIGERIA LIMITED between 28th March and 5th December, 2013 in Abuja within the jurisdiction of this Court, did use an aggregate sum of N878, 362,732.94 (Eight Hundred and Seventy - Eight Million, Three Hundred and Sixty Two Thousand, Seven Hundred and Thirty - Two Naira, Ninety - Four kobo) removed from the accounts of the Nigerian Air Force and paid into the account of Rytebuilders Technologies Limited with Zenith Bank Plc for the construction of a shopping mall situate at Plot 1386, Oda Crescent Cadastral Zone A07, Wuse II, Abuja for yourself, when you reasonably ought to have known that the said funds formed part of the proceed of unlawful activity (to wit: criminal breach of trust and corruption) of Air Chief Marshal Alex S Badeh and you thereby committed an offence contrary to Section 15 (2)(d) of the Money Laundering (Prohibition) Act, 2011 (as amended) and punishable under Section 15 (3) of the same Act»
NYCHA and the Harlem Children's Zone would also hold monthly meetings with residents to update them on the status of construction, while providing air conditioners to residents with medical conditions who might be affected by construction.
Negotiations to move in hit a snag last spring over Department of Transportation plans to share the store's loading zone with other businesses along Second Avenue affected by subway construction.
The U.S. Department of Transportation is running test clinics for connected vehicles that would communicate wirelessly with each other and with traffic lights and construction zones.
If we could program robots with similar versatility, it would open up many possibilities: Imagine machines that could fly into construction areas or disaster zones that aren't near roads and then squeeze through tight spaces on the ground to transport objects or rescue people.
In this situation, the joining zones in particular are exposed to high stress peaks and vibrations — a problem with which even bonded aircraft components, wind turbines or train construction have to contend.
I also have issues with black and yellow for some reason... it feels too much like a bumblebee or a construction zone or something!
My bathroom at my condo in Knoxville is 100 % a construction zone so I've been staying with my parents while that gets fixed and I got to spend the afternoon by the pool on Sunday and it was oh - so nice!
Add a fun finishing touch to your nursery décor with this charming set of 3 Sweet Jojo Designs Construction Zone Wall Hangings
Complete the look of the Sweet Jojo Designs Construction Zone collection with this set of 3 charming wall hangings.
It has been a wild ride, complete with a cross-country move to live in the middle of the construction zone, but now that things are finally winding down, the pain of living through construction is becoming more and more of a distant memory every day.
Blame it on the construction zone: a driver that failed to slow in time for roadwork on Germany's famed Nurburgring Nordschleife managed to cause a pile - up with three others.
Zone Body Construction with front and rear crumple zones.
Navigating the construction zones around the CNET offices felt like driving through a minefield — BAM CRASH BOOM — with me cringing all the way.
* This Nissan Versa Comes Equipped with These Options * [G01] MID-YEAR CHANGE, [B10] FRONT / REAR SPLASH GUARDS, Zone body construction w / front / rear crumple zones, hood deformation point, Variable intermittent windshield wipers, Transmission shift interlock, Torsion beam rear suspension w / stabilizer bar, Tire pressure monitoring system (TPMS), Tilt steering column, Tachometer, Steel side - door impact beams.
For Safety, all 2015 Altimas come with Anti-lock brakes, Traction Control, Zone Body construction, and 6 airbags.The Accessories include 1 Master Key / Owner's Manual.
Other standard equipment includes Active Head Restraints, Zone Body Construction with front and rear crumple zones, Nissan Vehicle Immobilizer System, Vehicle Security System and Tire Pressure Monitoring System (TPMS).
Also standard are 3 - point rear seat belts for all seating positions, front seat belts with dual pretensioners, load limiters and adjustable upper anchors, emergency inside trunk release, Zone Body construction with front and rear crumple zones, LATCH (Lower Anchors and Tethers for CHildren) and Tire Pressure Monitoring System (TPMS) with Easy - Fill Tire Alert.
Construction: steel body frame integral (unibody) with front and rear crumple zones; galvanized steel front fenders, hood, roof, door panels, one - piece bodyside outer panel, thermal plastic olefin (TPO) bumper fascias
The extended mirrors help, but it's not the kind of machine you can lazily pilot with one hand, especially when passing semitrucks in tight, cement - walled construction zones.
The 2008 Pathfinder includes a long list of standard safety features and equipment, including Zone Body construction with front and rear crumple zones; energy absorbing steering column; front seat Active Head Restraints and 3 - point front seat belts with pretensioners and load limiters.
* This Nissan Rogue Comes Equipped with These Options * [B93] REAR BUMPER PROTECTOR, [B10] SPLASH GUARDS, Zone body construction w / front / rear crumple zones, XM satellite radio, Vehicle dynamic control system (VDC)- inc: 2 - wheel limited slip (ABLS), Trip computer, Traction control system (TCS), Tire pressure monitoring system, Temporary spare tire w / steel wheel, Steering wheel audio controls.
But with Nissan's Zone Body construction, at least it can be safer for everyone on board.
This program identifies key work zones that will require an enhanced TMP, with components such as work zone ITS, limited construction hours, night work, lane rental contracting mechanisms, and Traffic Incident Management (TIM) plans.
Work Zone Data Collection & Analysis: What, Why, and How This podcast is a companion to the Work Zone Safety Data Collection and Analysis Guide, which was also developed under the Work Zone Safety Grant and is available at http://www.workzonesafety.org/research/record/27339 podcast was developed to assist State DOT construction engineers, traffic control plan developers, planners, and designers with collecting data in preparation for developing work zone strategies, designing a safe work zone, and creating an effective plan for managing traffic in and around work zones... read more Intended audience: State DOT construction engineers, traffic control plan developers, planners, and designZone Data Collection & Analysis: What, Why, and How This podcast is a companion to the Work Zone Safety Data Collection and Analysis Guide, which was also developed under the Work Zone Safety Grant and is available at http://www.workzonesafety.org/research/record/27339 podcast was developed to assist State DOT construction engineers, traffic control plan developers, planners, and designers with collecting data in preparation for developing work zone strategies, designing a safe work zone, and creating an effective plan for managing traffic in and around work zones... read more Intended audience: State DOT construction engineers, traffic control plan developers, planners, and designZone Safety Data Collection and Analysis Guide, which was also developed under the Work Zone Safety Grant and is available at http://www.workzonesafety.org/research/record/27339 podcast was developed to assist State DOT construction engineers, traffic control plan developers, planners, and designers with collecting data in preparation for developing work zone strategies, designing a safe work zone, and creating an effective plan for managing traffic in and around work zones... read more Intended audience: State DOT construction engineers, traffic control plan developers, planners, and designZone Safety Grant and is available at http://www.workzonesafety.org/research/record/27339 podcast was developed to assist State DOT construction engineers, traffic control plan developers, planners, and designers with collecting data in preparation for developing work zone strategies, designing a safe work zone, and creating an effective plan for managing traffic in and around work zones... read more Intended audience: State DOT construction engineers, traffic control plan developers, planners, and designzone strategies, designing a safe work zone, and creating an effective plan for managing traffic in and around work zones... read more Intended audience: State DOT construction engineers, traffic control plan developers, planners, and designzone, and creating an effective plan for managing traffic in and around work zones... read more Intended audience: State DOT construction engineers, traffic control plan developers, planners, and designers.
This Nissan Sentra Comes Equipped with These Options [K01] SPECIAL EDITION PKG - inc: pwr tilt sliding moonroof, navigation system w / 5» screen, XM satellite radio, XM NavTraffic, USB input, dual illuminated visor vanity mirrors, Intelligent Key keyless ignition & entry system w / rear trunk release function, leather wrapped steering wheel, cargo net / hooks, Bluetooth hands - free phone system, Special Edition wheel finish, [B10] FRONT / REAR SPLASH GUARDS, Zone body construction w / front / rear crumple zones, hood deformation point, Xtronic continuously variable transmission (CVT), Vehicle security system, Vehicle immobilization system, Vehicle dynamic control (VDC), Variable intermittent windshield wipers, Unique front / rear sport fascias, Trunk lid inside trim.
This brief podcast looks at the important role PCMS can have in both active and passive speed control strategies within a work zone... read more State and local DOT staff charged with developing and maintaining an overall temporary traffic control plan, construction engineers, the owner - agencies and contractors who are responsible for implementing TTC plans, and field staff responsible for ensuring compliance with TTC plans.
Equus utilizes strong unibody construction, along with front and rear crumple zones, bodyside reinforcements and five - mph energy - absorbing bumpers.
All of the Titan models feature the most advanced safety features including zone body construction with front and rear crumple zones to absorb impact, Vehicle Dynamic Control and Traction Control, LATCH System and Tire Pressure Monitoring System with easy fill tire alert.
Also included are child safety rear door locks; Zone Body construction featuring front and rear crumple zones and occupant zone; Nissan Immobilizer system and anti-theft alarm system; and Tire Pressure Monitoring System (TPMS) with position monitoring and available Easy Fill Tire Alert sysZone Body construction featuring front and rear crumple zones and occupant zone; Nissan Immobilizer system and anti-theft alarm system; and Tire Pressure Monitoring System (TPMS) with position monitoring and available Easy Fill Tire Alert syszone; Nissan Immobilizer system and anti-theft alarm system; and Tire Pressure Monitoring System (TPMS) with position monitoring and available Easy Fill Tire Alert system.
Also includes adjustable head restraints (D07) floor console storage pockets and (K4C) Wireless charging., AIR CONDITIONING DUAL - ZONE AUTOMATIC CLIMATE CONTROL, LICENSE PLATE KIT FRONT, JET BLACK CLOTH SEAT TRIM, ENGINE 5.3 L ECOTEC3 V8 WITH ACTIVE FUEL MANAGEMENT DIRECT INJECTION AND VARIABLE VALVE TIMING includes aluminum block construction (355 hp [265 kW] @ 5600 rpm 383 lb - ft of torque [518 Nm] @ 4100 rpm; more than 300 lb - ft of torque from 2000 to 5600 rpm), WHEEL FULL - SIZE SPARE 17» (43.2 CM) STEEL, GVWR 7200 LBS.
a b c d e f g h i j k l m n o p q r s t u v w x y z