From planning special events and
coordinating project phases to producing detailed reports and building strong client relationships, my background has prepared me to excel in this position.
Not exact matches
JCVI president Karen E. Nelson, PhD, who helped
coordinate the initial
phase of the
project points out that the success of this study was based, in part, on the dedication and excitement of the Leptospira research community.
The Coupled Model Intercomparison
Project (CMIP; currently in it's 6th
phase) is organized under the auspices of the World Climate Research Programme (WCRP) and designed to better understand past, present, and future climate change through
coordinated international multi-model experiments that have become a central element of national and international assessments of climate change, e.g., IPCC reports.
The IPCC's Fifth Assessment Report (AR5) relies heavily on the Coupled Model Intercomparison
Project,
Phase 5 (CMIP5), a collaborative climate modelling process
coordinated by the World Climate Research Programme (WCRP).
Proficient in all
phases of organizing and
coordinating projects, meeting deadlines and budgets».
Managed all construction activities following
project approvals and
coordinated work with Property Management to include
phasing, staging and site logistics
Reviewed and approved contract documents, oversaw contractor selection and bid process, awarded contracts, supervised construction, bid and awarded contracts for fixture installation,
coordinated all trades, developed and implemented schedules, managed budgets, and
coordinated with retail operations during all
phases of
projects.
Developed
project teams, coordinated with HR in hiring and terminating of individuals Projects: • Milford Wind Corridor Project Phase I, Milford, UT Client: First Wind, 4/2009 - Present Scope: $ 70M BOP Contract, Includes design and construction of collector system, substation, 89 miles of 345kv transmission line, operations and maintenance facility, SCADA system, access roads, turbine foundations, erection, and tower wiring as necessary to support (58) Clipper 2.5 MW C - 99 generators and (39) GE 1.5 MW XLE generators; a total of 204MW potential
project teams,
coordinated with HR in hiring and terminating of individuals
Projects: • Milford Wind Corridor
Project Phase I, Milford, UT Client: First Wind, 4/2009 - Present Scope: $ 70M BOP Contract, Includes design and construction of collector system, substation, 89 miles of 345kv transmission line, operations and maintenance facility, SCADA system, access roads, turbine foundations, erection, and tower wiring as necessary to support (58) Clipper 2.5 MW C - 99 generators and (39) GE 1.5 MW XLE generators; a total of 204MW potential
Project Phase I, Milford, UT Client: First Wind, 4/2009 - Present Scope: $ 70M BOP Contract, Includes design and construction of collector system, substation, 89 miles of 345kv transmission line, operations and maintenance facility, SCADA system, access roads, turbine foundations, erection, and tower wiring as necessary to support (58) Clipper 2.5 MW C - 99 generators and (39) GE 1.5 MW XLE generators; a total of 204MW potential output.
Coordinated with
project engineering managers, assisted in developing a more feasible and cost - effective designs as well as all
project items throughout the actual construction
phases.
Coordinated with clients to plan and consult architectural construction
projects in both design and build
phases.
Assumed
project manager and senior business analyst roles,
coordinating all
phases of the
project.
Performed and
coordinated the execution of test cases during the User Acceptance Testing (UAT)
phase of the
project life cycle.
Coordinated with offices with in GDOT and with consultants during the different
phases on a
project.
Managed
project budget and
coordinated all
phases of construction including electrical, plumbing, framing, flooring, and roofing.
Provide oversight for all
phases of construction
projects, including
coordinating workers
I have provided and
coordinated all
phases of Construction, Logistics, Quality Control, from Planning and Design to
Project Management.
* Experience in analyzing,
coordinating and planning all
phases of the testing life - cycle activities such as Requirement analysis (Technology Work or
Project Requests, Business Requirements, Functional Requirements), Design An...
Coordinated all design
projects from conception through completion of construction
phase and collaborated with clients and contractors on plans and permit requirements.
Effectively monitor and support
project plans and oversee
Phase 1
project progress, identify issues and
coordinate all scheduled studies to ensure
project deliverables.
Responsible for
coordinating and managing client
projects through all
phases of laboratory operations, including
project set - up, reporting, and invoicing.
Electronic Data Systems, Advanced System Engineer (Denver, CO) 11/1985 — 3/1999 • Implement computer database engineering objectives for a data processing administrator • Install Vantive and Oracle databases for clients • Manage system tests, Oracle 7.3.4 / Sybase 4.9.2 database administration, import / exports, Oracle PL / SQL scripts • Serve as assistant Oracle database administrator for CLMS team • Develop Visual Basic / GUI applications and C batch programs in Vantive • Perform team leadership role in construction
phase of COBOL II
project • Create request for proposal document and high - level requirements • Develop technical lead of General Motors Fleet Volume using IMS / DB2 / TELON / COBOL II, system test, UAT and implementation • Develop IMS / DB2 / PL1 on - line system,
coordinate system test and UAT, and serve as technical leader of Experimental System