Sentences with phrase «crane systems»

You will maintain, Inspect and repair overhead cranes Responsibilities: * Inspections of crane systems * Troubleshoot and repair defective...
Responsibilities: * Repair, install crane systems * Troubleshoot and repair defective...
Workers then take out beams and concrete flooring, which are carried to ground level by a crane system that generates electricity as the pieces are lowered.
But with all the cladding and the systems and the main crane system, the bridges — the total weight will be 36,000 tons.
«The sky crane system is a good engineering solution to the problem.»
A movable truss and crane system obviates the need for conventional temporary haul roads and construction pads.
Hands - on experience in operating and maintaining crane system and equipment with sound knowledge of mechanical engineering concepts.

Not exact matches

I can't tell you how many times I see a «bigger baby» literally trying to pull himself upright in a car seat travel system stroller, craning his neck because he wants to see the world around him.
If Rapetti had been found guilty the flaws in the system that allowed the crane to be operating «as is» that day would soon be forgotten.
A host of Saratoga County companies were utilized by Land Remediation in the construction of its new facility, including: Munter Enterprises (contractor); Kivort Steel and Pallette Stone (construction materials); Zinter Handling (cranes); Alltek Energy Systems (HVAC); Zanetti Millwork (interior); and Firetek Sprinkler Systems (fire suppression system).
Corrosion in Byron's essential water system had been discussed in plant meetings, and because testing the risers required repeated use of a crane to gain access, inspectors should have suspected something.
But the rapid expansion and interest in wind - harnessing technology has strained available crane resources, creating a shortage of capacity, says Jacob Juhl Christensen, product manager for Vestas Wind Systems, A / S's Technology Product Management R&D division in Denmark.
Instead, the Mars Science Laboratory will use the sky crane touchdown system illustrated here, which will be capable of delivering a much larger rover onto the surface.
As we zoom closer and closer into Gale Crater, the components of Curiosity's landing system come into view: The heat shield was the first piece to hit the ground, followed by the back shell attached to the parachute, then the rover itself touched down, and finally, after cables were cut, the sky crane flew away to the northwest and crashed Image credit: NASA / JPL - Caltech / University of Arizona
The purpose - designed facility by Foremans Relocatable Building Systems, was craned into position in just one day during the school holidays to minimise disruption to staff and students.
The new Yorkon off - site building system that was specified for the three teaching wings reduced the number of steel ‑ framed modules by half to just 60, which were craned into position in just two weeks.
A pickup truck is used here, but the tech — called the Beam physics system — can be used with anything, including «cars, trucks, planes, boats, trains, cranes, tanks, helicopters, and even destructible map objects and crash test dummies.»
With normal cameras, crane shots require a heavy - duty support system due to the weight of the camera.
By Scott Hempling [1] Accountants, architects, barbers, cosmetologists, crane operators, dentists, docking masters, doctors, electricians, engineers, foresters, home inspectors, interior designers, landscape architects, lawyers, land surveyors, pilots, plumbers, private detectives, real estate appraisers, real estate brokers, security systems technicians, security guards and tax preparers.
From the automated cranes moving containers from ships to trains and trucks to algorithms that schedule and route deliveries, automation is already having an impact on the overall efficiency of the goods - movement system, cutting both costs and energy demands.
I complained that architects and builders had to «finally figure out what shipping containers actually are, which is not just a box, but part of a global transportation system with a vast infrastructure of ships, trains, trucks and cranes that has driven the cost of shipping down to a fraction of what it used to be.»
In fact, the important part of the shipping container isn't the container at all; it's the handling system, the amazing infrastructure of ships and cranes and and trains and trucks that move them around, delivering their contents for a fraction of the cost of the old break - bulk shipping.
Lead counsel for world's industry leader in cranes and crane support systems in hundreds of product liability and asbestos cases pending in Missouri and Illinois state courts.
Handle responsibilities of checking and troubleshooting electrical and hydraulic systems of crane
Perform tasks of maintaining construction equipment like front end loaders, material separating plant systems, hydraulic cranes and cable crawler cranes
Skilled in operating off - line trucks, front end loaders, cable crawler cranes, hydraulic and material separating plant systems
Ensured seamless and uninterrupted operations across a high - volume warehouse by performing preventative maintenance, troubleshooting, root cause analysis, and repair on a variety of heavy mechanical, electrical, pneumatic, and hydraulic systems, processes, and equipment, including cranes, crane components, and generators.
Projects: • High Plains Wind Farm, Amarillo, TX Client: John Deere Wind Energy, 9/2007 - 3/2008 Scope: $ 2.7 M BOP Contract included Point of Interconnect, Microwave Communication system, foundations, overhead transmission line, collector system, access roads, crane pads, restoration and 3rd party management of Client erection and tower wiring subcontractors for installation of (8) Suzlon 1.25 MW S64 generators.
Subject matter expert in troubleshooting crane control systems electrical and mechanical malfunctions.
Watches and controls a system that involves two four story high cranes and over 300 conveyors in an automated warehouse with 8000 pallet positions.
Key words for the role of Mobile Maintenance Technician Boiler plant / Furnace / Autoclave / Boiler / Kiln / Industrial boilers / Industrial boilers / Steam boilers / Biomass burn boiler / Steel works / Fuel burners / Heating systems / Commercial gas safe / Commercial boilers / Burner combustion / Steam boilers / electrical engineer / mechanical engineer / crane maintenance / Factory maintenance / production engineer / production maintenance / maintenance technician / service technician / engineer
Working as part of the established maintenance team your main duties will be to maintain and repair gear motors, reduction gearboxes, conveyor systems, overhead cranes and furnaces.
Maintenance on CO2 Lasers and Fiber lasers, Welding Robots, hydraulic presses, bridge cranes, cable hoists, building facilities - water heaters, HVAC systems, space heaters, plumbing, carpentry, electrical.
These new skills would include patchwork within confined spaces using concrete pump trucks sand bags and dewatering systems (working closely with Griffin Dewatering systems) Sheet pile driving h - pile driving crane rigging / signal man.
a b c d e f g h i j k l m n o p q r s t u v w x y z